Project Description: |
EASTHAMPTON- TEMPORARY BRIDGE, BR# E-05-004 ROUTE 5 OVER THE MANHAN RIVER
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Thomas Loughlin |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project has been advertised for construction bids. (as of 06/02/2001 ) |
|
Bridges
|
|
|
|