| Project Description: |
EASTHAMPTON- TEMPORARY BRIDGE, BR# E-05-004 ROUTE 5 OVER THE MANHAN RIVER
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Thomas Loughlin![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project has been advertised for construction bids. (as of 06/02/2001 ) |
|