Project Description:
SOMERSET- SWANSEA- BRIDGE REPLACEMENT, S-16-003=S-35-003, ROUTE 103 (WILBUR AVENUE) OVER THE LEE RIVER
The proposed project consists of replacing the existing Wilbur Avenue bridge over the Lees River in its present location with minor improvements to the approach roadways. A traffic detour will be in place during construction.
Location:
  • Town of Somerset
  • Town of Swansea
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Martin Leelman
    Estimated Total Contract Cost: $2,383,988.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S16003 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project