Project Description: |
TEMPLETON- BRIDGE REPLACEMENT, BR# T-02-009 BRIDGE STREET OVER THE B & M RAILROAD
The work consists of the complete demolition and removal of the existing truss bridge and abutments, and constructing a new steel girder bridge in approximately the same location. The work also includes clearing and grubbing, excavation, reconstruction of the approaches to the bridge, water mains, drainage, granite curb, pavement, guard rail, signs, pavement markings and safety controls.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Joseph Mombrun |
Estimated Total Contract Cost: | $1,566,522.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project has been advertised for construction bids. (as of 09/13/2003 ) |
|