Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CHICOPEE- HOLYOKE- BRIDGE REHABILITATION, C-13-012=H-21-030, ROUTE 116 (CHICOPEE/CABOT ST) OVER CONNECTICUT RIVER & PV RR (AKA WILLIMANSETT BRIDGE)
The purpose of this project is to rehabilitate the existing bridge through the replacement of the bridge deck, sidewalks, and historic metal bridge railings. The existing bridge support structure will be repaired and strengthened and all structural steel will be repainted. A detour will be required during construction. The highway work will be limited to approach roadway work.
Location:
  • City of Chicopee
  • City of Holyoke
  • Project Manager: Marie Joyce Rose
    Estimated Total Contract Cost: $27,634,611.67
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • C13012 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project