Project Description: |
LINCOLN- BRIDGE REPLACEMENT, L-12-002, CONCORD ROAD (ROUTE 126) OVER MBTA
The purpose of this project includes reconstruction of the bridge substructure and superstructure, full depth roadway reconstruction, and full depth reconstruction of the multiuse path on the north side of the bridge. The bridge will be raised approximately 3 feet to provide a minimum of 21-foot clearance for double deck trains.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2025 |
Project Manager: | Eamon Kernan |
Estimated Total Contract Cost: | $10,118,656.15 |
Estimated Total Federal Participating Construction Cost: | $10,524,545.98 |
Funding Provision: | This project is planned to be funded through the 2025 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | 75% Package Comments to DE (as of 01/22/2024 ) |
|
Bridges
|
|
|
|