DANVERS- RECONSTRUCTION OF TWO INTERCHANGES ON ROUTE 128, WITH ROUTE 62 AND ROUTE 128 WITH ROUTE 35, INCLUDES REPLACEMENT OF D-03-020 (PHASE I)
This purpose of this project is to construct new acceleration/deceleration lanes at the Route 35 (High Street) and Route 62 (Elliot Street) interchanges. The project also proposed to replace the bridge carrying Route 128 over an unused MBTA rail road located south of the High Street interchange.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Steven E McLaughlin![]() |
| Estimated Total Contract Cost: | $27,591,539.44 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|