Project Description:
|
ABINGTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 18 FROM ROUTE 139 TO THE WHITMAN T.L.
This project will result in the reconstruction of Route 18 in Abington from the Abington/Whitman Town Line to approximately 350 feet south of Route 139, a distance of approximately 2.4 miles. The project includes drainage upgrades, traffic signal and traffic sign installations, pavement marking applications, landscaping, highway guardrails, driveway apron reconstruction, and water supply alterations. Also included are the construction of walls, stairs, sidewalks, wheelchairs ramps, and curbs.
|