Project Description: |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-014 GEORGE BROWN STREET OVER THE B & M RAILROAD AND MBTA
The proposed project consists of replacing the existing bridge with a new bridge that will be 22 feet wide curb to curb with one 5 foot wide sidewalk on the north side. Improvements will be made to the approach roadways in an effort to improve sight distance going over the bridge.
|
Location: |
|
Resident Engineer: | Charles Sabella |
Construction Contract Value: | $1,287,050.00 |
Construction Bid Price: | $1,270,200.00 |
Initial Construction Estimate: | $1,195,000.00 |
District: | District 4 |
Current Status: | This project is now complete. (as of 12/14/2005) |
|