117106 |
WAREHAM- RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO RED BROOK ROAD (1.65 MILES) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
600380 |
PEMBROKE- REHABILITATION OF ROUTE 36 (CENTER STREET) FROM ROUTE 27 TO ROUTE 14 |
Hwy Reconstr - No Added Capacity |
CONSTRUCTION |
|
600645 |
ACUSHNET- BRIDGE REPLACEMENTS, A-03-003 (3M5), A-03-007 (AJH) & A-03-008 (AJJ), HAMLIN STREET OVER THE ACUSHNET RIVER |
Bridge Replacement |
CONSTRUCTION |
|
601607 |
HULL- RECONSTRUCTION OF ATLANTIC AVENUE AND RELATED WORK FROM NANTASKET AVENUE TO COHASSET TOWN LINE |
Hwy Reconstr - No Added Capacity |
CONSTRUCTION |
|
601630 |
WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) |
Hwy Reconstr - Added Capacity |
CONSTRUCTION |
|
602261 |
WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
603796 |
MANSFIELD- BRIDGE REPLACEMENT, M-03-003 & M-03-045, BALCOM STREET OVER THE WADING RIVER |
Bridge Replacement |
CONSTRUCTION |
|
605888 |
TAUNTON- INTERCHANGE IMPROVEMENTS AT ROUTES 24 & 140, INCLUDING REPLACING T-01-045 AND T-01-046 |
Hwy Reconstr - Major Widening |
CONSTRUCTION |
|
606024 |
TAUNTON- RECONSTRUCTION OF ROUTE 44 (DEAN STREET), FROM ARLINGTON STREET TO ROUTE 104 (SOUTH MAIN STREET) |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
606076 |
DISTRICT 3- DISTRICT 4- DISTRICT 5- WORK ZONE PORTABLE CAMERA SYSTEMS INSTALLATION (ITS) |
Intelligent Transportation Sys |
CONSTRUCTION |
|
606130 |
NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1A & UPLAND ROAD/WASHINGTON STREET & PROSPECT STREET/FULTON STREET |
Traffic Signals |
CONSTRUCTION |
|
606146 |
CANTON- NORWOOD- WESTWOOD- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEMENT OF 5 BRIDGES |
Hwy Reconstr - Added Capacity |
CONSTRUCTION |
|
606272 |
BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
606620 |
RAYNHAM TO BOLTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-495 |
Structural Signing |
CONSTRUCTION |
|
606709 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS AND RELATED WORK ON KINGS HIGHWAY, FROM CHURCH STREET TO THE KINGS HIGHWAY BRIDGE (N-06-036) OVER ROUTE 140 |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
607217 |
EASTON- CORRIDOR IMPROVEMENTS ON DEPOT STREET (ROUTE 123), FROM NEWELL CIRCLE TO WASHINGTON STREET (ROUTE 138) |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
607319 |
MASHPEE- CORRIDOR IMPROVEMENTS & RELATED WORK ON ROUTE 151, FROM OLD BARNSTABLE ROAD TO THE MASHPEE ROTARY (PHASE 1) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
607339 |
ATTLEBORO- INTERSECTION IMPROVEMENTS AT ROUTE 1 (WASHINGTON STREET)/ROUTE 1A (NEWPORT AVENUE) AND ROUTE 123 (HIGHLAND AVENUE) |
Traffic Signals |
CONSTRUCTION |
|
607397 |
WELLFLEET- INTERSECTION IMPROVEMENTS & RELATED WORK AT ROUTE 6 & MAIN STREET |
Traffic Signals |
CONSTRUCTION |
|
607403 |
STOUGHTON- CORRIDOR IMPROVEMENTS ON ROUTE 138, FROM 300 FEET NORTH OF CHARLES AVENUE TO LINCOLN STREET (PHASE 1) |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
2024 |
607531 |
NORTON- CORRIDOR IMPROVEMENTS & RELATED WORK ON EAST MAIN STREET (ROUTE 123), FROM PINE STREET TO I-495 |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
607822 |
NORTON- MANSFIELD- RAIL TRAIL EXTENSION (WORLD WAR II VETERANS TRAIL) |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
607838 |
DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS |
Landscaping |
CONSTRUCTION |
|
608079 |
SHARON- BRIDGE REPLACEMENT, S-09-003 (40N), MASKWONICUT STREET OVER AMTRAK/MBTA |
Bridge Replacement |
CONSTRUCTION |
|
608088 |
BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), FROM ANGUS BEATON DRIVE TO WEST STREET |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
608142 |
OAK BLUFFS- CONSTRUCTION OF A SHARED USE PATH ALONG BEACH ROAD, FROM THE LAGOON POND BRIDGE NORTHERLY TO THE EASTVILLE AVENUE/COUNTY ROAD INTERSECTION |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
608204 |
ATTLEBORO TO NORWOOD- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-95 |
Structural Signing |
CONSTRUCTION |
|
608230 |
REHOBOTH- INTERSECTION IMPROVEMENTS & RELATED WORK AT WINTHROP STREET (ROUTE 44) AND ANAWAN STREET (ROUTE 118) |
Traffic Signals |
CONSTRUCTION |
|
608267 |
RAYNHAM- RESURFACING AND RELATED WORK ON ROUTE 138 |
Roadway - Reconstr - Sidewalks and Curbing |
CONSTRUCTION |
|
608279 |
STOUGHTON- INTERSECTION IMPROVEMENTS AND RELATED WORK AT CENTRAL STREET, CANTON STREET AND TOSCA DRIVE |
Traffic Signals |
CONSTRUCTION |
|
608295 |
DISTRICT 5- IMPLEMENTATION OF FLASHING YELLOW ARROW AT VARIOUS TRAFFIC SIGNALS |
Traffic Signals |
CONSTRUCTION |
|
608422 |
SANDWICH- CONSTRUCTION OF SHARED USE PATH ALONG SERVICE ROAD FROM ROUTE 130 TO CHASE ROAD |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
608480 |
FOXBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 1 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
608496 |
AVON- STOUGHTON- RESURFACING AND RELATED WORK ON ROUTE 24 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
608535 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS AND RELATED WORK ON COUNTY STREET, FROM NELSON STREET TO UNION STREET |
Milling and Cold Planing |
CONSTRUCTION |
|
608536 |
NEW BEDFORD- INTERSECTION IMPROVEMENTS AND RELATED WORK AT ROCKDALE AVENUE AND ALLEN STREET |
Traffic Signals |
CONSTRUCTION |
|
608607 |
DISTRICT 3- DISTRICT 5- ITS EQUIPMENT (CCTV CAMERAS AND VMS) INSTALLATION FOR HIGHWAY OPERATIONS AT VARIOUS LOCATIONS |
Intelligent Transportation Sys |
CONSTRUCTION |
|
608617 |
HARWICH- BRIDGE REPLACEMENT, H-10-019, AZALEA DRIVE OVER HERRING RIVER |
Bridge Replacement |
CONSTRUCTION |
|
608619 |
FALL RIVER- BRIDGE REPLACEMENT, F-02-019, WEAVER STREET OVER MASSACHUSETTS COASTAL RAILROAD |
Bridge Replacement |
CONSTRUCTION |
|
608666 |
ORLEANS- INTERSECTION IMPROVEMENTS AT ROUTE 28 (SOUTH ORLEANS ROAD), ROUTE 39 (HARWICH ROAD) AND QUANSET ROAD |
Hwy Reconstr - No Added Capacity |
CONSTRUCTION |
|
608803 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
CONSTRUCTION |
|
608820 |
RAYNHAM- BRIDGEWATER- WEST BRIDGEWATER- BROCKTON- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 24 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
608829 |
STOUGHTON- IMPROVEMENTS AT RICHARD L. WILKINS ELEMENTARY SCHOOL (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
CONSTRUCTION |
|
608991 |
DISTRICT 5- EXPANSION OF ITS ROADWAY EQUIPMENT FOR HIGHWAY OPERATIONS |
Intelligent Transportation Sys |
CONSTRUCTION |
|
609037 |
REHOBOTH- SOMERSET- SWANSEA- SYSTEMATIC BRIDGE PRESERVATION AT 10 BRIDGES ALONG THE I-195 CORRIDOR |
Bridge Preservation |
CONSTRUCTION |
|
609053 |
CANTON- DEDHAM- NORWOOD- HIGHWAY LIGHTING IMPROVEMENTS AT I-93 & I-95/128 |
Lighting |
CONSTRUCTION |
|
609063 |
ATTLEBORO- NORTH ATTLEBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON INTERSTATE 295 |
Structural Signing |
CONSTRUCTION |
|
609064 |
WAREHAM TO BOURNE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 25 |
Structural Signing |
CONSTRUCTION |
|
609067 |
BARNSTABLE- CONSTRUCTION OF A SHARED USE PATH ALONG BEARSES WAY, FROM ROUTE 28 TO PITCHERS WAY |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
609085 |
DISTRICT 5- EXPANSION OF ITS ROADWAY DEVICES FOR HIGHWAY OPERATIONS |
Intelligent Transportation Sys |
CONSTRUCTION |
|
609098 |
WELLFLEET- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
609125 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
CONSTRUCTION |
|
609165 |
ATTLEBORO- BRIDGE WIDENING, A-16-052, AND BRIDGE REMOVAL, A-16-062, I-295 RAMP OVER TEN MILE RIVER |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
609197 |
TAUNTON- HVAC SYSTEM REPLACEMENT AT THE DISTRICT ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
609201 |
NEW BEDFORD- INTERSECTION IMPROVEMENTS ON ACUSHNET AVENUE AT PECKHAM ROAD/SASSAQUIN AVENUE |
Traffic Signals |
CONSTRUCTION |
|
609212 |
DENNIS- CULVERT REPLACEMENTS ON ROUTE 6A OVER SESUIT CREEK |
Culvert Replacement |
CONSTRUCTION |
|
609274 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC SIGNAL REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Traffic Signals |
CONSTRUCTION |
|
609275 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Contract Highway Maintenance |
CONSTRUCTION |
|
609316 |
DISTRICT 5- HIGHWAY DELINEATOR REPLACEMENT AND RELATED REPAIRS AT VARIOUS LOCATIONS |
Safety Improvements |
CONSTRUCTION |
|
609373 |
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
CONSTRUCTION |
|
609379 |
DISTRICT 5- EXPANSION OF ITS ROADWAY DEVICES FOR HIGHWAY OPERATIONS |
Intelligent Transportation Sys |
CONSTRUCTION |
|
609383 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
CONSTRUCTION |
|
609433 |
ATTLEBORO- NORTH ATTLEBOROUGH- MEDIAN CABLE BARRIER INSTALLATION ON I-95 |
Guard Rail & Fencing |
CONSTRUCTION |
|
609502 |
DISTRICT 5- MAINTENANCE OF STATE ROADWAYS AT VARIOUS LOCATIONS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
CONSTRUCTION |
|
610542 |
BOURNE- ROTARY IMPROVEMENTS |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
610682 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS (INCLUDING MARTH'S VINEYARD) |
Bridge Maintenance |
CONSTRUCTION |
|
610689 |
DISTRICT 5- DEPLOYMENT OF TEMPORARY TRAFFIC CONTROL AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Bridge Maintenance |
CONSTRUCTION |
|
610849 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A,B, & C) |
Resurfacing |
CONSTRUCTION |
|
610897 |
DISTRICT 5- SCHEDULED AND EMERGENCY FACILITY REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
611996 |
NEW BEDFORD- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 140 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
2024 |
612029 |
STATEWIDE- ITS ROADWAY EQUIPMENT FOR HIGHWAY OPERATIONS |
Intelligent Transportation Sys |
CONSTRUCTION |
|
612116 |
DISTRICT 5- SCHEDULED AND EMERGENCY IMPACT ATTENUATOR INSTALLATION AND REPAIRS AT VARIOUS LOCATIONS |
Impact Attenuators |
CONSTRUCTION |
|
612117 |
DISTRICT 5- HIGHWAY DELINEATOR REPLACEMENT AND RELATED WORK AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
CONSTRUCTION |
|
612119 |
DISTRICT 5- SCHEDULED AND EMEGENCY TRAFFIC SIGNAL REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Traffic Signals |
CONSTRUCTION |
|
612123 |
DISTRICT 5- SCHEDULED AND EMERGENCY STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Bridge Preservation |
CONSTRUCTION |
|
612161 |
BREWSTER- ORLEANS- BRIDGE PRESERVATION ALONG THE ROUTE 6 CORRIDOR |
Bridge Preservation |
CONSTRUCTION |
|
612163 |
SHARON- WALPOLE- BRIDGE PRESERVATION ALONG THE I-95 CORRIDOR |
Bridge Preservation |
CONSTRUCTION |
|
612165 |
DISTRICT 5- CORRIDOR SIGN REPLACEMENT ON ROUTES 3A, 6, 6A AND 28 |
Sign Installation/Upgrading |
CONSTRUCTION |
|
612166 |
DISTRICT 5- SCHEDULED AND EMERGENCY PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A,B & C) |
Resurfacing |
CONSTRUCTION |
|
612200 |
NORTH ATTLEBORO- BRIDGE PAINTING AND REPAIRS ALONG I-295 |
Painting - Structural |
CONSTRUCTION |
|
612201 |
DISTRICT 5- SCHEDULED AND EMERGENCY FENCE REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
CONSTRUCTION |
|
612203 |
DISTRICT 5- SCHDULED AND EMERGENCY PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA D (BARNSTABLE COUNTY) |
Resurfacing |
CONSTRUCTION |
|
612217 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Resurfacing |
CONSTRUCTION |
|
612571 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
CONSTRUCTION |
|
612573 |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE AND EROSION REPAIRS AT VARIOUS LOCATIONS |
Drainage |
CONSTRUCTION |
|
612578 |
FALL RIVER- SOMERSET- ELECTRICAL UPGRADES AND SAFETY IMPROVEMENTS, F-02-058=S-16-008, I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE) |
Lighting |
CONSTRUCTION |
|
612628 |
MIDDLEBOROUGH- CONSTRUCTION OF MODULAR OFFICES AND ASSOCIATED SITE WORK AT VINE STREET AND WEST GROVE STREET (ROUTE 28) MAINTENANCE DEPOTS |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
612640 |
DISTRICT 5- PEDESTRIAN AND BICYCLE IMPROVEMENTS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
CONSTRUCTION |
|
612652 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Bridge Preservation |
CONSTRUCTION |
|
612653 |
DISTRICT 5- DEPLOYMENT OF TEMPORARY TRAFFIC CONTROL AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Bridge Maintenance |
CONSTRUCTION |
|
612654 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR AND SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drawbridge Maintenance |
CONSTRUCTION |
|
612655 |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK AND JOINT REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
CONSTRUCTION |
|
612743 |
MIDDLEBOROUGH- BRIDGE PRESERVATION, M-18-017 (463), I-495 OVER ROUTE 105 & MBTA/MACRR |
Bridge Preservation |
CONSTRUCTION |
|
612744 |
DISTRICT 5- CLEANING AT BRIDGE LOCATIONS ALONG THE I-495 CORRIDOR |
Bridge Maintenance |
CONSTRUCTION |
|
612823 |
DISTRICT 5- SCHEDULED AND EMERGENCY CATCH BASIN AND PIPE CLEANING AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Catch Basin Cleaning |
CONSTRUCTION |
|
612824 |
DISTRICT 5- SCHEDULED AND EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
CONSTRUCTION |
|
612825 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS, AREAS A,B, & C |
Tree Trimming |
CONSTRUCTION |
|
612830 |
DISTRICT 5- SCHEDULED AND EMERGENCY SALT STORAGE SHED AND LIQUID TANK REPAIRS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
612833 |
DISTRICT 5- SCHEDULED AND EMERGENCY FACILITY REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
612842 |
DISTRICT 5- SIDEWALK REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Sidewalk Construction and Repairs |
CONSTRUCTION |
|
612846 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
612848 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS (EXCLUDING NANTUCKET ISLAND) |
Pavement Marking |
CONSTRUCTION |
|
612850 |
DISTRICT 5- SCHEDULED AND EMERGENCY FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Sign Installation/Upgrading |
CONSTRUCTION |
|
612852 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS - AREA D |
Tree Trimming |
CONSTRUCTION |
|
612853 |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drainage |
CONSTRUCTION |
|
613174 |
DISTRICT 5- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Bridge Maintenance |
CONSTRUCTION |
|
613175 |
DISTRICT 5- SCHEDULED AND EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
CONSTRUCTION |
|
613176 |
DISTRICT 5- SCHEDULED AND EMERGENCY STEEL AND CONCRETE BEAM REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
CONSTRUCTION |
|
613177 |
FALL RIVER- EXPANDED METAL SHIELDING INSTALLATION ON F-02-058 (3TK), I-195 (EB/WB) OVER TAUNTON RIVER |
Bridge Maintenance |
CONSTRUCTION |
|
613195 |
SANDWICH- BRIDGE PRESERVATION, S-04-007 (4BB) AND S-04-010 (4BC), QUAKER MEETING HOUSE ROAD OVER ROUTE 6/MID-CAPE HIGHWAY |
Bridge Preservation |
CONSTRUCTION |
2024 |
613235 |
DISTRICT 5- SCHEDULED AND EMERGENCY HIGHWAY MAINTENANCE REPAIRS AND RELATED WORK AT VARIOUS LOCATIONS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
CONSTRUCTION |
|
613236 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS MAINTENANCE DEPOTS |
Resurfacing |
CONSTRUCTION |
|
613237 |
DISTRICT 5- VEGETATION MANAGEMENT (MECHANICAL) AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Mowing and Spraying |
CONSTRUCTION |
|
613246 |
DISTRICT 5- ROADSIDE LITTER AND DEBRIS REMOVAL AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
CONSTRUCTION |
|
613247 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREA D) |
Resurfacing |
CONSTRUCTION |
|
613254 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Resurfacing |
CONSTRUCTION |
|
613255 |
DISTRICT 5- SCHEDULED AND EMERGENCY FENCE REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
CONSTRUCTION |
|
613279 |
DISTRICT 5- HIGHWAY LIGHTING REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Lighting |
CONSTRUCTION |
|
613281 |
DISTRICT 5- HIGHWAY DELINEATOR REPLACEMENT AND RELATED BARRIERS AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
CONSTRUCTION |
|
613284 |
DISTRICT 5- INSTALLATION OF TRAFFIC SIGNAL CONTROL CABINET ASSEMBLIES AND FOUNDATIONS AT VARIOUS LOCATIONS |
Lighting |
CONSTRUCTION |
|
613285 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC SIGNAL REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Traffic Signals |
CONSTRUCTION |
|
613478 |
WAREHAM- BRIDGE PRESERVATION, W-06-037 (4AJ) & W-06-040 (4AD), MAPLE SPRINGS ROAD AND TIHONET ROAD OVER STATE ROUTE 25 |
Bridge Preservation |
CONSTRUCTION |
|
76171 |
PLAINVILLE- TRAFFIC SAFETY IMPROVEMENTS & SIGNAL INSTALLATION, ROUTE 1 (WASHINGTON STREET) AND ROUTE 152 (TAUNTON ST.) |
Safety Improvements |
DESIGN |
|
87790 |
CANTON- DEDHAM- NORWOOD- INTERCHANGE IMPROVEMENTS AT I-95/I-93/UNIVERSITY AVENUE/I-95 WIDENING INCLUDING 10 BRIDGES AND 9 MULTI-USE PATH/PEDESTRIAN BRIDGES |
Hwy Reconstr - Added Capacity |
DESIGN |
|
105701 |
BARNSTABLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 28 (FALMOUTH ROAD) |
Resurfacing |
DESIGN |
|
110512 |
PLYMOUTH- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 3A |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
113099 |
KINGSTON- PLYMOUTH- RECONSTRUCTION OF A SECTION OF ROUTE 3 AND RELOCATION OF ROUTE 44 INCLUDING 5 BRIDGES (SECTION II) |
New Construction |
DESIGN |
|
133301 |
FALL RIVER- SOMERSET- BRIDGE SITE PREPARATION AND RELATED WORK, BR# F-02-001=S-16-004 BRIGHTMAN ST. / TAUNTON RIVER (CONTRACT 1) |
Bridge Replacement |
DESIGN |
|
135850 |
LAKEVILLE- MIDDLEBOROUGH- BRIDGE REPLACEMENT, BR# L-01-003=M-18-021 VAUGHAN STREET OVER THE NEMASKET RIVER |
Bridge Replacement |
DESIGN |
|
600161 |
FOXBOROUGH- FRANKLIN- MANSFIELD- PLAINVILLE- WRENTHAM- CONCRETE SLAB REHABILITATION, RESURFACING & BRIDGE WORK ON RT.I-495 |
Resurfacing |
DESIGN |
|
600387 |
HALIFAX- ROADWAY RECONSTRUCTION AND RELATED WORK ON A SECTION OF ROUTE 105 (THOMPSON STREET) |
Resurfacing |
DESIGN |
|
600392 |
SANDWICH- RECONSTRUCTION AND RELATED WORK ALONG 3 SECTIONS OF ROUTE 130 |
Hwy Reconstr - Minor Widening |
DESIGN |
|
600410 |
NORTH ATTLEBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 120 (HICKORY ROAD) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
600412 |
COHASSET- HINGHAM- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 228 (MAIN ST., SHORT ST., LEAVITT ST., EAST ST., HULL ST.) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
600590 |
RAYNHAM- TAUNTON- RECONSTRUCTION AND WIDENING OF ROUTE 44 (7300 FT.) INCLUDING BR# R-02-010 AND R-02-011 |
Hwy Reconstr - Added Capacity |
DESIGN |
|
600649 |
BROCKTON- BRIDGE REPLACEMENT, BR# B-25-010 ALLEN STREET OVER SALISBURY BROOK (P.V. CHANGE ) |
Bridge Replacement |
DESIGN |
|
600652 |
MANSFIELD- BRIDGE REPLACEMENT, BR# M-03-002 WILLIAMS STREET OVER THE WADING RIVER |
Bridge Replacement |
DESIGN |
|
600664 |
BERKLEY- BRIDGEWATER- FALL RIVER- FREETOWN- RAYNHAM- TAUNTON- SIGN REPLACEMENT ON A SECTION OF ROUTE 24 |
Sign Installation/Upgrading |
DESIGN |
|
600748 |
FALL RIVER- BRIDGE REHABILITATION, BR# F-02-008 ALMOND STREET OVER CONRAIL |
Bridge Reconstruction/Rehab |
DESIGN |
|
600765 |
NORTON- BRIDGE REPLACEMENT, BR# N-23-006 CRANE STREET OVER THE THREE MILE RIVER |
Bridge Replacement |
DESIGN |
|
600795 |
YARMOUTH- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, ROUTE 28 (MAIN STREET) AT FOREST ROAD |
Safety Improvements |
DESIGN |
|
601036 |
DARTMOUTH- BRIDGE REHABILITATION, BR# D-04-002 BRIDGE STREET (PADANARAM BRIDGE) OVER THE APPONAGANSET RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
601098 |
SWANSEA- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 6 AT BUSHEE ROAD |
Safety Improvements |
DESIGN |
|
601101 |
ACUSHNET- ROCHESTER- RESURFACING AND RELATED WORK ON ROUTE 105 FROM FREETOWN TL TO ROCHESTER TL |
Resurfacing |
DESIGN |
|
601165 |
FOXBOROUGH- MANSFIELD- RESURFACING AND RELATED WORK ON ROUTE 140, MAIN STREET, CENTRAL STREET & COPELAND DRIVE |
Resurfacing |
DESIGN |
|
601256 |
TAUNTON- CONSTRUCTION OF GORDON M. OWEN RIVERWAY EXTENSION, RECONSTRUCTION OF WILLIAMS STREET AND COUNTY STREET |
New Construction |
DESIGN |
|
601280 |
BRIDGEWATER- HALIFAX- BRIDGE REPLACEMENT, BR# B-23-007=H-02-001 CHERRY STREET OVER THE TAUNTON RIVER |
Bridge Replacement |
DESIGN |
|
601422 |
BOURNE- PLYMOUTH- WAREHAM- RESURFACING AND RELATED WORK ON SECTIONS OF HEAD OF THE BAY ROAD AND RED BROOK ROAD |
Resurfacing |
DESIGN |
|
601563 |
TRURO- CONSTRUCTION OF TWO CHEMICAL STORAGE SHEDS (ROUTE 6 MAINTENANCE DEPOT) |
Vertical Construction (Ch 149) |
DESIGN |
|
601595 |
MIDDLEBOROUGH- CONSTRUCTION OF PRE-ENGINEERED STORAGE FACILITY (ROUTE 28 MAINTENANCE DEPOT) |
Vertical Construction (Ch 149) |
DESIGN |
|
601610 |
TAUNTON- WINDOW AND DOOR REPLACEMENT AT THE DISTRICT 5 ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
DESIGN |
|
601638 |
ORLEANS- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, MAIN STREET AT TONSET ROAD |
Traffic Signals |
DESIGN |
|
601676 |
DISTRICT 5- IMPROVEMENT AND REFURBISHMENT OF HYDRO CELL CRASH CUSHIONS AT VARIOUS LOCATIONS (4 SEPARATE CONTRACTS) |
Impact Attenuators |
DESIGN |
|
601687 |
ROCKLAND- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS AT 4 LOCATIONS ON ROUTES 123 AND 139 |
Traffic Signals |
DESIGN |
|
601787 |
DISTRICT 5- BRIDGE JOINT REPLACEMENT AND RELATED REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
DESIGN |
|
601847 |
HINGHAM- NORWELL- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 3A, ROUTE 228 AND DERBY STREET |
Resurfacing |
DESIGN |
|
601863 |
DISTRICT 5- HIGHWAY LIGHTING UPGRADES AT VARIOUS LOCATIONS |
Electrical |
DESIGN |
|
601931 |
ATTLEBORO- ROADWAY RECONSTRUCTION AND RELATED WORK ON A SECTION OF ROUTE 1 |
Hwy Reconstr - Major Widening |
DESIGN |
|
601939 |
DISTRICT 5- INSTALLATION OF SNOWPLOWABLE RAISED PAVEMENT MARKERS AT VARIOUS LOCATIONS (3 SEPARATE CONTRACTS) |
Pavement Marking |
DESIGN |
|
602024 |
DISTRICT 5- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS IN AREA A |
Resurfacing |
DESIGN |
|
602052 |
BOURNE- FALMOUTH- GUIDE SIGN REPLACEMENT AND UPDATING ON ROUTE 28 |
Sign Installation/Upgrading |
DESIGN |
|
602115 |
DISTRICT 5- APPLICATION OF REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
DESIGN |
|
602212 |
ATTLEBORO- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS AT 5 LOCATIONS |
Safety Improvements |
DESIGN |
|
602227 |
ATTLEBORO- BRIDGE REPLACEMENT, BR# A-16-014 TIFFANY STREET OVER THE TEN MILE RIVER |
Bridge Replacement |
DESIGN |
|
602228 |
ATTLEBORO- BRIDGE REPLACEMENT, BR# A-16-006 WATER STREET OVER THE TEN MILE RIVER |
Bridge Replacement |
DESIGN |
|
602384 |
WAREHAM- BRIDGE REPLACEMENT, BR# W-06-017, MAIN AVENUE OVER THE EAST RIVER |
Bridge Replacement |
DESIGN |
|
602411 |
DISTRICT 1- FABRICATION AND INSTALLATION OF SIGNS & SUPPORTS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Structural Signing |
DESIGN |
|
602415 |
DISTRICT 5- FABRICATION AND INSTALLATION OF SIGNS & SUPPORTS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Structural Signing |
DESIGN |
|
602558 |
DISTRICT 5- BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
DESIGN |
|
602907 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
DESIGN |
|
603015 |
FALL RIVER- INSTALLATION OF A PRE-ACTION SPRINKLER SYSTEM AND A CARBON MONOXIDE MONITORING SYSTEM AT GOVERNMENT CENTER PLAZA |
Vertical Construction (Ch 149) |
DESIGN |
|
603026 |
DISTRICT 5- INSTALLATION AND REFURBISHMENT OF RAISED PAVEMENT MARKERS IN AREA B (3 SEPARATE CONTRACTS) |
Pavement Marking |
DESIGN |
|
603041 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- TRAFFIC SIGNAL CONTROLLERS & COMPLETE CABINETS STOCKROOM REPLACEMENT |
Traffic Signals |
DESIGN |
|
603113 |
DISTRICT 5- CONTRACT 5C (CAPE COD & MARTHA'S VINEYARD) - MAINTENANCE OF STATE HIGHWAYS |
Contract Highway Maintenance |
DESIGN |
|
603200 |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS (DISTRICT WIDE) |
Structures Maintenance |
DESIGN |
|
603204 |
FOXBOROUGH- PLAINVILLE- SHARON- WALPOLE- PATRIOTS STADIUM INFRASTRUCTURE PROJECT, ROUTE 1 (CONSTRUCTION CONTRACT #2) |
Hwy Reconstr - Minor Widening |
DESIGN |
|
603205 |
FOXBOROUGH- PATRIOTS STADIUM INFRASTRUCTURE PROJECT, ROUTE 1 (CONSTR. CONTRACT #1) INCL. BR# F-06-028, F-06-029 & F-06-030 |
New Bridge |
DESIGN |
|
603230 |
FOXBOROUGH- PLAINVILLE- WRENTHAM- ROADWAY JOINT AND FROST HEAVE REPAIR ON A SECTION OF ROUTE I-495 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
603254 |
FALL RIVER- SOMERSET- SWANSEA- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 |
Resurfacing |
DESIGN |
|
603297 |
DISTRICT 5- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS IN AREA "B" |
Resurfacing |
DESIGN |
|
603352 |
DISTRICT 5- FABRICATION AND INSTALLATION OF GROUND MOUNTED TOURIST INFORMATION SIGNS ON VARIOUS STATE HIGHWAYS (4 SEP. CONTRS.) |
Sign Installation/Upgrading |
DESIGN |
|
603430 |
PLYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 25 |
Resurfacing |
DESIGN |
|
603496 |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AND RELATED WORK AT VARIOUS LOCATIONS |
Structures Maintenance |
DESIGN |
|
603547 |
DISTRICT 5- CONTRACT 5C (CAPE COD AND MARTHA'S VINEYARD) - MAINTENANCE OF STATE HIGHWAYS |
Contract Highway Maintenance |
DESIGN |
|
603565 |
DISTRICT 5- BORINGS, GEOTECHNICAL TESTING AND RELATED WORK (METRIC UNITS CONTRACT) |
Drilling & Boring |
DESIGN |
|
603614 |
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS (5 SEPARATE CONTRACTS) |
Sign Installation/Upgrading |
DESIGN |
|
603641 |
DISTRICT 5- REPAIR OF CHEMICAL STORAGE FACILITIES AT VARIOUS LOCATIONS |
Chemical Storage Sheds |
DESIGN |
|
603656 |
RAYNHAM- INTERSECTION IMPROVEMENTS ON ROUTE 44 (CAPE HIGHWAY) AT CHURCH STREET |
Traffic Signals |
DESIGN |
|
603732 |
FALL RIVER- BRIDGE REPLACEMENT, BR# F-02-093, CENTRAL STREET OVER QUEQUECHAN RIVER |
Structures Maintenance |
DESIGN |
|
603739 |
WRENTHAM- CONSTRUCTION OF ROUTE I-495/ROUTE 1A RAMPS |
Hwy Reconstr - No Added Capacity |
DESIGN |
2024 |
603803 |
DISTRICT 5- CONTRACT 5C (CAPE COD AND MARTHA'S VINEYARD) - MAINTENANCE OF STATE HIGHWAYS |
Contract Highway Maintenance |
DESIGN |
|
603806 |
DISTRICT 5- HERBICIDE APPLICATION TO VARIOUS STATE RIGHT OF WAYS TO CONTROL NUISANCE VEGETATION |
Landscaping |
DESIGN |
|
603990 |
DISTRICT 5- EMERGENCY AND SCHEDULED INSTALLATION OF BRIDGE SHIELDING |
Structures Maintenance |
DESIGN |
|
603993 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS TO BRIDGES AT VARIOUS LOCATIONS
|
Structures Maintenance |
DESIGN |
|
604084 |
DISTRICT 5- GRASS MOWING (AREA 1) |
Mowing and Spraying |
DESIGN |
|
604085 |
DISTRICT 5- GRASS MOWING (AREA 2) |
Mowing and Spraying |
DESIGN |
|
604135 |
DARTMOUTH- STORAGE BUILDING CONSTRUCTION (FAUNCE CORNER DEPOT) |
Vertical Construction (Ch 149) |
DESIGN |
|
604186 |
DISTRICT 4- DISTRICT 5- ASBESTOS REMOVAL AT VARIOUS LOCATIONS |
Asbestos Removal |
DESIGN |
|
604408 |
DISTRICT 5- HIGHWAY MAINTENANCE, CONTRACT 5C (CAPE COD & MARTHA'S VINEYARD) |
Contract Highway Maintenance |
DESIGN |
|
604496 |
DISTRICT 5- OPEN END BORING CONTRACT |
Drilling & Boring |
DESIGN |
|
604583 |
DISTRICT 5- SOLID WASTE REMOVAL FROM MHD DEPOTS |
Process/Recycle/Trnsprt Soils |
DESIGN |
|
604625 |
WHITMAN- POSTED PROPOSAL, USA PROPERTY WATER LINE CONNECTION |
Posted Proposal |
DESIGN |
|
604942 |
DISTRICT 5- MAINTENANCE OF STATE HIGHWAYS ON CAPE COD AND MARTHA'S VINEYARD (CONTRACT 5C) |
Contract Highway Maintenance |
DESIGN |
|
605103 |
FREETOWN- BRIDGE BETTERMENT, F-09-008, STATE ROUTE 24 OVER ASSONET RIVER |
Bridge Preservation |
DESIGN |
|
605168 |
HINGHAM- IMPROVEMENTS ON ROUTE 3A, FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY, ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2025 |
605294 |
DUXBURY- BRIDGE REPLACEMENT, D-14-010 (48H & 48J), ROUTE 3 (PILGRIM HIGHWAY) NB/SB OVER FRANKLIN STREET |
Bridge Replacement |
DESIGN |
|
605311 |
MARION- WAREHAM- BRIDGE REPLACEMENT, M-05-001=W-06-013 & W-06-016, MARION ROAD/WAREHAM ROAD (ROUTE 6) OVER WEWEANTIC RIVER |
Bridge Replacement |
DESIGN |
2024 |
605328 |
RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24 |
Bridge Replacement |
DESIGN |
|
605600 |
DISTRICT 5- MAINTENANCE OF STATE HIGHWAYS IN AREA 5D
|
Contract Highway Maintenance |
DESIGN |
|
605646 |
DISTRICT 5- BORING & GEOTECHNICAL TESTING & RELATED WORK AT VARIOUS LOCATIONS |
Drilling & Boring |
DESIGN |
|
605797 |
WALPOLE- BRIDGE REMOVAL, W-03-003, COMMON STREET OVER ABANDONED RAILROAD |
Demolition |
DESIGN |
|
605857 |
NORWOOD- INTERSECTION IMPROVEMENTS @ ROUTE 1 & UNIVERSITY AVENUE/EVERETT STREET |
Traffic Signals |
DESIGN |
2026 |
606002 |
KINGSTON- DUXBURY- INTERSECTION IMPROVEMENTS AT ROUTE 3 RAMPS (NB/SB) AND ROUTE 3A (TREMONT STREET) |
Traffic Signals |
DESIGN |
2026 |
606030 |
NORTH ATTLEBORO- DECK REPLACEMENT, N-16-047, TONER BOULEVARD OVER I-95 |
Structures Maintenance |
DESIGN |
|
606082 |
BOURNE- MEDIAN INSTALLATION ON ROUTE 6 (SCENIC HIGHWAY) |
Hwy Reconstr - No Added Capacity |
DESIGN |
2025 |
606089 |
FREETOWN- SUPERSTRUCTURE REPLACEMENT, F-09-010, N. MAIN STREET OVER ST 24 |
Bridge Reconstruction/Rehab |
DESIGN |
2025 |
606143 |
BROCKTON- INTERSECTION IMPROVEMENTS AT CRESCENT STREET (ROUTE 27)/QUINCY STREET/MASSASOIT BOULEVARD |
Hwy Reconstr - Minor Widening |
DESIGN |
|
606236 |
BARNSTABLE- RESURFACING & RELATED WORK ON ROUTE 28 (FALMOUTH ROAD) |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
606307 |
MIDDLEBOROUGH- ROTARY IMPROVEMENTS AT ROUTES 44/28/18 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
606352 |
WAREHAM- CULVERT AND DAM REPLACEMENT ON CRANBERRY HIGHWAY AT ROUTE 28 AND ROUTE 6, MILL POND DAM OVER AGAWAM RIVER |
Bridge Replacement |
DESIGN |
2025 |
606388 |
FALL RIVER- CONSTRUCTION OF A TYPE II NOISE BARRIER |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
606389 |
FREETOWN- BRIDGE REPLACEMENT, F-09-017, CHACE ROAD OVER ROUTE 140 |
Bridge Replacement |
DESIGN |
2025 |
606437 |
FAIRHAVEN- VESSEL MAINTENANCE FACILITY SLIP IMPROVEMENTS |
Marine Construction |
DESIGN |
|
606527 |
NEW BEDFORD- BRIDGE REPLACEMENT, N-06-020, I-195 (EB & WB), RAMP C & F OVER ST 18, COUNTY STREET, STATE STREET, MASS COASTAL RAILROAD, PURCHASE STREET, WELD STREET, INCLUDES IMPROVEMENTS TO N-06-021, N-06-022, F-01-008 |
Bridge Reconstruction/Rehab |
DESIGN |
2024 |
606715 |
LAKEVILLE- RECONSTRUCTION AND RELATED WORK ON RHODE ISLAND ROAD (ROUTE 79), FROM THE TAUNTON CITY LINE TO CLEAR POND ROAD |
Hwy Reconstr - Minor Widening |
DESIGN |
2025 |
607214 |
STOUGHTON- RECONSTRUCTION OF TURNPIKE STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
607346 |
ABINGTON- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, A-01-006, CENTRAL STREET OVER SHUMATUSCACANT RIVER |
Bridge Replacement |
DESIGN |
|
607348 |
NORTH ATTLEBORO- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, N-16-004, MENDON ROAD OVER ABBOTT RUN RIVER |
Bridge Replacement |
DESIGN |
2027 |
607349 |
NORWELL- PEMBROKE- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER NORTH RIVER |
Bridge Replacement |
DESIGN |
2025 |
607394 |
YARMOUTH- INTERSECTION IMPROVEMENTS ON ROUTE 6 RAMPS AT UNION STREET & STATION AVENUE |
Traffic Signals |
DESIGN |
|
607398 |
YARMOUTH- BARNSTABLE- CAPE COD RAIL TRAIL EXTENSION, INCLUDES NEW BRIDGE OVER WILLOW STREET & RAILROAD (PHASE III) |
Bikeway/Bike Path Construction |
DESIGN |
2024 |
607405 |
CHATHAM- INTERSECTION IMPROVEMENTS & RELATED WORK AT MAIN STREET (ROUTE 28), DEPOT ROAD, QUEEN ANNE ROAD AND CROWELL ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2027 |
607417 |
TAUNTON- RECONSTRUCTION AND EXPANSION OF DISTRICT FIVE ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
DESIGN |
|
607440 |
MATTAPOISETT- CORRIDOR IMPROVEMENTS AND RELATED WORK ON MAIN STREET, WATER STREET, BEACON STREET AND MARION ROAD. |
Hwy Reconstr - No Added Capacity |
DESIGN |
2026 |
607444 |
FALMOUTH- INTERSECTION IMPROVEMENTS & RELATED WORK AT NORTH FALMOUTH HIGHWAY (ROUTE 28A),NATHAN ELLIS HIGHWAY (ROUTE 151) AND COUNTY ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
607467 |
DISTRICT 5- BORINGS & GEOTECHNICAL TESTING & RELATED WORK AT VARIOUS LOCATIONS |
Drilling & Boring |
DESIGN |
|
607557 |
NORWOOD- WESTWOOD- INTERSECTION IMPROVEMENTS AT UNIVERSITY AVENUE & CANTON STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
607713 |
SEEKONK - RESURFACING & RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
607818 |
BROCKTON- INTERSECTION IMPROVEMENTS AT LYMAN STREET/GROVE STREET/SUMMER STREET & REPLACEMENT OF GROVE STREET BRIDGE, B-25-005, OVER SALISBURY PLAIN RIVER |
Traffic Signals |
DESIGN |
2025 |
607820 |
DARTMOUTH- RECONSTRUCTION & RELATED WORK OF FAUNCE CORNER ROAD, FROM OLD FALL RIVER ROAD SOUTHERLY TO THE MASSDOT OWNED RAILROAD CROSSING |
Hwy Reconstr - Minor Widening |
DESIGN |
|
607825 |
WAREHAM- SHARED USE PATH CONSTRUCTION ADJACENT TO NARROWS ROAD AND MINOT AVENUE |
Bikeway/Bike Path Construction |
DESIGN |
2028 |
607871 |
DARTMOUTH- CORRIDOR IMPROVEMENTS ON ROUTE 6, FROM FAUNCE CORNER ROAD TO HATHAWAY ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2025 |
607979 |
MARION- SHARED USE PATH CONSTRUCTION (PHASE 1), FROM THE MARION-MATTAPOISETT T.L. TO POINT ROAD |
Bikeway/Bike Path Construction |
DESIGN |
2025 |
608007 |
COHASSET- SCITUATE- CORRIDOR IMPROVEMENTS AND RELATED WORK ON JUSTICE CUSHING HIGHWAY (ROUTE 3A), FROM BEECHWOOD STREET TO HENRY TURNER BAILEY ROAD |
Hwy Reconstr - Minor Widening |
DESIGN |
2024 |
608020 |
BOURNE- BRIDGE REPLACEMENT, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RAILROAD, INCLUDES REPLACEMENT OF B-17-027 ROUTE 3 OVER US 6 (CAPE COD BRIDGES PROGRAM PHASE I) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
608048 |
ROCKLAND– BRIDGE REPLACEMENT, R-08-001 & R-08-002, STATE ROUTE 123 OVER FRENCH STREAM & REPAIRS TO STUDLEY’S POND DAM |
Bridge Replacement |
DESIGN |
|
608049 |
FALL RIVER- CORRIDOR IMPROVEMENTS ON ROUTE 79/DAVOL STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2024 |
608052 |
NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT US 1 (PROVIDENCE HIGHWAY) & MORSE STREET |
Traffic Signals |
DESIGN |
2028 |
608066 |
TISBURY- IMPROVEMENTS ON STATE ROAD AT TASHMOO OVERLOOK |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
608100 |
ROCKLAND- BUS SHELTER REPLACEMENT AT ROUTE 228 PARK AND RIDE |
Structures Maintenance |
DESIGN |
|
608158 |
WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE, INCLUDING REHAB OF N-25-032=W-31-018 |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
608195 |
EASTON- CORRIDOR IMPROVEMENTS ON ROUTE 138 INCLUDING INTERSECTION IMPROVEMENTS AT ROUTE 138 (WASHINGTON STREET) AND ELM STREET |
Traffic Signals |
DESIGN |
2025 |
608196 |
DENNIS- CORRIDOR AND STREETSCAPE IMPROVEMENTS ON MAIN STREET (ROUTE 28), FROM UNCLE BARNEYS ROAD TO OLD MAIN STREET (PHASE 2) |
Hwy Reconstr - Minor Widening |
DESIGN |
2027 |
608264 |
YARMOUTH- CORRIDOR IMPROVEMENTS ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2028 |
608479 |
ATTLEBORO- NORTH ATTLEBORO- RESURFACING AND RELATED WORK ON ROUTE 1 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
608497 |
WRENTHAM- CORRIDOR IMPROVEMENTS ON ROUTE 1 |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
608506 |
HANSON- CORRIDOR IMPROVEMENTS ON ROUTE 14 (MAQUAN STREET), FROM THE PEMBROKE T.L. TO INDIAN HEAD STREET AND RELATED WORK |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2027 |
608530 |
MIDDLEBORO- RECONSTRUCTION AND RELATED WORK ON WAREHAM STREET AND WOOD STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2027 |
608563 |
SWANSEA- IMPROVEMENTS ON ROUTE 6 (GRAND ARMY OF THE REPUBLIC HIGHWAY) AT GARDNERS NECK ROAD |
Safety Improvements |
DESIGN |
2024 |
608585 |
EASTON- RESURFACING AND RELATED WORK ON ROUTE 138 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
608586 |
DARTMOUTH- CORRIDOR IMPROVEMENTS ON DARTMOUTH STREET AND PROSPECT STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2027 |
608615 |
KINGSTON- BRIDGE REPLACEMENT, K-01-014, SMITHS LANE OVER ROUTE 3 (PILGRIM HIGHWAY) |
Bridge Replacement |
DESIGN |
2028 |
608616 |
TAUNTON- BRIDGE REPLACEMENT, T-01-024, SCADDING STREET OVER SNAKE RIVER |
Bridge Replacement |
DESIGN |
2025 |
608664 |
NANTUCKET- INTERSECTION IMPROVEMENTS AT SURFSIDE ROAD AND BARTLETT ROAD |
New Construction |
DESIGN |
|
608742 |
DENNIS- HARWICH- RECONSTRUCTION & RELATED WORK ON MAIN STREET (ROUTE 28), FROM UPPER COUNTY ROAD TO THE HERRING RIVER BRIDGE |
Hwy Reconstr - Minor Widening |
DESIGN |
2025 |
608744 |
PROVINCETOWN- CORRIDOR IMPROVEMENTS AND RELATED WORK ON SHANK PAINTER ROAD, FROM ROUTE 6 TO BRADFORD STREET |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2025 |
608750 |
PLAINVILLE- RECONSTRUCTION OF SOUTH STREET (ROUTE 1A), FROM SHARLENE LANE TO EVERETT STREET AND RELATED WORK |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2026 |
608753 |
TAUNTON- CORRIDOR IMPROVEMENTS AND RELATED WORK ON BROADWAY (ROUTE 138), FROM PURCHASE STREET TO JACKSON STREET (PHASE 2) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2024 |
608759 |
SWANSEA- TRAFFIC SIGNAL AND SAFETY IMPROVEMENTS AT THREE INTERSECTIONS ON ROUTE 6 |
Traffic Signals |
DESIGN |
2025 |
608819 |
BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2026 |
608827 |
NORTH ATTLEBOROUGH- ATTLEBORO- INTERSTATE MAINTENANCE AND RELATED WORK ON I-295 |
Resurfacing Interstate |
DESIGN |
2027 |
608934 |
PLAINVILLE- INTERSECTION IMPROVEMENTS AT WASHINGTON STREET (ROUTE 1) AND GEORGE STREET |
Safety Improvements |
DESIGN |
|
608942 |
WELLFLEET- CAPE COD RAIL TRAIL EXTENSION |
Bikeway/Bike Path Construction |
DESIGN |
|
609052 |
BROCKTON- INTERSECTION IMPROVEMENTS AT CENTRE STREET (ROUTE 123) AND PLYMOUTH STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2024 |
609073 |
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Sign Installation/Upgrading |
DESIGN |
|
609075 |
DISTRICT 5- SCHEDULED AND EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
DESIGN |
|
609077 |
DISTRICT 5- SCHEDULED AND EMERGENCY HIGHWAY LIGHTING REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Lighting |
DESIGN |
|
609079 |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS |
Traffic Signals |
DESIGN |
|
609169 |
CAPE COD BRIDGE INFRASTRUCTURE INVESTMENTS |
Bridge Preservation |
DESIGN |
|
609193 |
NORTON- INTERSECTION IMPROVEMENTS AT WEST MAIN STREET (ROUTE 123), NORTH WORCESTER STREET AND SOUTH WORCESTER STREET |
Traffic Signals |
DESIGN |
2026 |
609194 |
BRIDGEWATER - CONSTRUCTION OF A SALT SHED STORAGE FACILITY AT THE BRIDGEWATER MAINTENANCE DEPOT |
Vertical Construction (Ch 149) |
DESIGN |
|
609198 |
DISTRICT 5- CONSTRUCTION OF A PRE-ENGINEERED MAINTENANCE FACILITY IN EDGARTOWN (MARTHA'S VINEYARD) |
Vertical Construction (Ch 149) |
DESIGN |
|
609207 |
DIGHTON- TAUNTON RIVER TRAIL AT SWEET KNOLLS ENHANCEMENTS |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
609208 |
NANTUCKET- WAUWINET MULTI-USE PATH |
Bikeway/Bike Path Construction |
DESIGN |
2025 |
609218 |
FALMOUTH- CORRIDOR IMPROVEMENTS ON ROUTE 28 |
Hwy Reconstr - Minor Widening |
DESIGN |
|
609224 |
YARMOUTH- CONSTRUCTION OF A SALT STORAGE SHED AT THE WILLOW STREET MAINTENANCE DEPOT |
Vertical Construction (Ch 149) |
DESIGN |
|
609255 |
MANSFIELD- MULTIMODAL ACCOMMODATION ON SCHOOL STREET, FROM SPRING STREET TO WEST STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
2025 |
609262 |
BOURNE- RAIL TRAIL CONSTRUCTION (PHASE 1) |
Bikeway/Bike Path Construction |
DESIGN |
2025 |
609410 |
BROCKTON- INTERSECTION IMPROVEMENTS AND RELATED WORK AT CENTRE STREET (ROUTE 123), CARY STREET AND LYMAN STREET |
Traffic Signals |
DESIGN |
2024 |
609417 |
DISTRICT 4- DISTRICT 5- DISTRICT 6- INSTALLATION OF HORIZONTAL CURVE WARNING SIGNS, PAVEMENT MARKINGS, DELINEATORS & SURFACE TREATMENTS |
Safety Improvements |
DESIGN |
|
609434 |
FALL RIVER- BRIDGE REPLACEMENT, F-02-114 (C0X), JEFFERSON STREET OVER SUCKER BROOK |
Bridge Replacement |
DESIGN |
2026 |
609435 |
PLYMPTON- BRIDGE REPLACEMENT, P-14-001 (445), WINNETUXET ROAD OVER WINNETUXET RIVER |
Bridge Replacement |
DESIGN |
2024 |
609440 |
ABINGTON- INTERSECTION IMPROVEMENTS AT HANCOCK STREET AND CHESTNUT STREET |
Traffic Signals |
DESIGN |
2026 |
609442 |
SEEKONK- INTERSECTION IMPROVEMENTS AND RESURFACING ON ROUTE 44 (TAUNTON AVENUE)
FROM RI LINE TO PECK STREET INCLUDING ROUTE 114A/FALL RIVER AND ARCADE AVE INTERSECTIONS |
Hwy Reconstr - Minor Widening |
DESIGN |
|
609459 |
TISBURY- DRAINAGE IMPROVEMENTS ON STATE HIGHWAY |
Drainage |
DESIGN |
2024 |
609472 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
DESIGN |
|
609518 |
FAIRHAVEN- LEROY WOOD ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2024 |
609520 |
BROCKTON- ABINGTON- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON ROUTE 123 |
Safety Improvements |
DESIGN |
|
609533 |
ROCKLAND- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON MARKET STREET (ROUTE 123) |
Safety Improvements |
DESIGN |
|
610647 |
WAREHAM- CORRIDOR IMPROVEMENTS ON ROUTE 6 AT SWIFTS BEACH ROAD |
Hwy Reconstr - No Added Capacity |
DESIGN |
2024 |
610669 |
DARTMOUTH- CROSS ROAD CORRIDOR IMPROVEMENTS |
Hwy Reconstr - Minor Widening |
DESIGN |
|
610670 |
HARWICH- HARWICH ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2025 |
610673 |
BOURNE- BOURNE RAIL TRAIL (PHASE 2) |
Bikeway/Bike Path Construction |
DESIGN |
|
610676 |
WRENTHAM- INTERSECTION IMPROVEMENTS ON ROUTE 1A AT NORTH AND WINTER STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
|
610698 |
FALL RIVER- HIGHWAY LIGHTING UPGRADES ON I-195 UNDER CITY HALL PLAZA |
Lighting |
DESIGN |
|
610701 |
FALL RIVER- SOMERSET- BRIDGE REMOVAL, F-02-001=S-16-004, BRIGHTMAN STREET BRIDGE OVER TAUNTON RIVER |
Demolition |
DESIGN |
|
610714 |
BOURNE TO BRAINTREE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 3 |
Structural Signing |
DESIGN |
2025 |
610715 |
NEW BEDFORD TO TAUNTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 140 |
Structural Signing |
DESIGN |
2025 |
610798 |
NEW BEDFORD- INTERSECTION IMPROVEMENTS AT MOUNT PLEASANT STREET AND NASH ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2026 |
610799 |
WESTPORT- CORRIDOR IMPROVEMENTS ON ROUTE 6 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
610800 |
BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT THE ROUTE 132 PARK AND RIDE |
Hwy Reconstr - Minor Widening |
DESIGN |
2024 |
610802 |
SOMERSET- STORMWATER IMPROVEMENTS ALONG ROUTE 6, ROUTE 138, AND ROUTE 103 FOR TAUNTON RIVER |
Drainage |
DESIGN |
2026 |
610803 |
FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE 24 AND ROUTE 79 |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
610804 |
AVON- CORRIDOR IMPROVEMENTS ON ROUTE 28 |
Hwy Reconstr - Minor Widening |
DESIGN |
|
610805 |
SANDWICH- PARK AND RIDE FACILITY ON ROUTE 130 AT ROUTE 6 |
New Construction |
DESIGN |
|
610807 |
PLAINVILLE- CORRIDOR IMPROVEMENTS ON ROUTE 1, FROM ROUTE 106 TO ROUTE 152 |
Hwy Reconstr - Minor Widening |
DESIGN |
|
610827 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS ON ROUTE 18 BETWEEN ROUTE 6 AND ROUTE I-195 |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
610925 |
SEEKONK- ROADWAY RESURFACING & SIDEWALK INSTALLATION ON MINK STREET (ROUTE 114A) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
610926 |
BARNSTABLE- CORRIDOR IMPROVEMENTS ON ROUTE 28 INCLUDING AIRPORT ROTARY RETROFITS |
Hwy Reconstr - Minor Widening |
DESIGN |
|
610927 |
WESTPORT- INTERSECTION IMPROVEMENTS AT ROUTE 177 AND ROBERTS ROAD/TICKLE ROAD |
Hwy Reconstr - No Added Capacity |
DESIGN |
2027 |
610928 |
MASHPEE- CORRIDOR IMPROVEMENTS ON ROUTE 28 INCLUDING ROTARY RETROFITS |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
610929 |
FALL RIVER- BEDFORD STREET CORRIDOR IMPROVEMENTS |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
611946 |
DISTRICT 5- ROADSIDE VEGETATION MANAGEMENT(SPRAYING) AT VARIOUS LOCATIONS |
Mowing and Spraying |
DESIGN |
|
611968 |
EAST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT BEDFORD STREET (ROUTE 18), WEST STREET (ROUTE 106) AND EAST STREET |
Safety Improvements |
DESIGN |
|
611976 |
EAST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT HIGHLAND STREET AND NORTH BEDFORD STREET (ROUTE 18) |
Safety Improvements |
DESIGN |
|
611979 |
AVON- INTERSECTION IMPROVEMENTS AT ROUTE 28, SPRING STREET AND HARRISON BOULEVARD |
Safety Improvements |
DESIGN |
2026 |
611980 |
SOMERSET- INTERSECTION IMPROVEMENTS AT ROUTE 6 AND LEES RIVER AVE |
Safety Improvements |
DESIGN |
2027 |
611981 |
STOUGHTON- INTERSECTION IMPROVEMENTS AT CANTON STREET (ROUTE 27), SCHOOL STREET AND SUMMER STREET |
Safety Improvements |
DESIGN |
2028 |
611984 |
CHATHAM- SIDEWALK INSTALLATION ON ROUTE 28 (OLD HARBOR ROAD), FROM BARCLIFF AVENUE TO SAIL A WAY |
Sidewalk Construction and Repairs |
DESIGN |
|
611985 |
HARWICH- SIDEWALK INSTALLATION ON ROUTE 28 FROM BANK STREET TO SAQUATUCKET HARBOR |
Sidewalk Construction and Repairs |
DESIGN |
2024 |
611986 |
MASHPEE- CORRIDOR IMPROVEMENTS & RELATED WORK ON ROUTE 151, FROM THE FALMOUTH T.L. TO OLD BARNSTABLE ROAD (PHASE 2) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2024 |
611990 |
SOMERSET- SWANSEA- PAVEMENT PRESERVATION & RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
2025 |
611991 |
NEW BEDFORD- FREETOWN- PAVEMENT PRESERVATION & RELATED WORK ON ROUTE 140 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
611998 |
BOURNE- FALMOUTH- SHINING SEA BIKEWAY EXTENSION/BOURNE RAIL TRAIL (PHASE 4) |
Bikeway/Bike Path Construction |
DESIGN |
|
612003 |
EDGARTOWN- MARTHA'S VINEYARD CORRELLUS BIKE PATH CONSTRUCTION (PHASE 3) |
Bikeway/Bike Path Construction |
DESIGN |
2028 |
612006 |
DUXBURY- BRIDGE REPLACEMENT, D-14-003 (438), POWDER POINT AVENUE OVER DUXBURY BAY |
Bridge Replacement |
DESIGN |
2027 |
612032 |
PROVINCETOWN- TRURO- WELLFLEET- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2026 |
612052 |
HARWICH- ORLEANS- RESURFACING AND RELATED WORK ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
612053 |
BOURNE- SANDWICH- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
612056 |
ATTLEBORO- NORTH ATTLEBOROUGH- MANSFIELD- FOXBOROUGH- RESURFACING AND RELATED WORK ON I-95 |
Resurfacing Interstate |
DESIGN |
2027 |
612058 |
RAYNHAM- TAUNTON- NORTON- RESURFACING AND RELATED WORK ON I-495 |
Resurfacing Interstate |
DESIGN |
2028 |
612060 |
WAREHAM- RESURFACING AND RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
2028 |
612061 |
MATTAPOISETT- MARION- RESURFACING AND RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
|
612063 |
BOURNE- RESURFACING AND RELATED WORK ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2028 |
612064 |
WESTPORT- DARTMOUTH- RESURFACING AND RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
|
612073 |
SHARON- BRIDGE PRESERVATION OF S-09-015 AND S-09-016 ALONG THE I-95 CORRIDOR |
Bridge Preservation |
DESIGN |
|
612077 |
LAKEVILLE- FREETOWN- TAUNTON- RESURFACING AND RELATED WORK ON ROUTE 140 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
612101 |
FALL RIVER- MARY FONSECA ELEMENTARY SCHOOL (SRTS) |
Sidewalk Construction and Repairs |
DESIGN |
2026 |
612102 |
CANTON- NORWOOD- WALPOLE- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 |
Resurfacing Interstate |
DESIGN |
|
612104 |
MIDDLEBORO- INTERSTATE MAINTENANCE AND RELATED WORK ON I-495 |
Resurfacing Interstate |
DESIGN |
2025 |
612105 |
FALL RIVER- WESTPORT- INTERSTATE MAINTENANCE AND RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
|
612111 |
FALMOUTH- RESURFACING AND RELATED WORK ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2028 |
612112 |
CHATHAM- HARWICH- RESURFACING AND RELATED WORK ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
|
612229 |
MARION- IMPROVEMENTS ON ROUTE 6, FROM CONVERSE ROAD TO POINT ROAD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
612262 |
BROCKTON- INTERSECTION IMPROVEMENTS AT ROUTE 123 (BELMONT STREET), PEARL STREET AND STONEHILL STREET |
Traffic Signals |
DESIGN |
2028 |
612263 |
NEW BEDFORD- BICYCLE AND PEDESTRIAN RAMP CONSTRUCTION, ROUTE 6 (WB) TO MACARTHUR DRIVE |
Sidewalk Construction and Repairs |
DESIGN |
2027 |
612267 |
WAREHAM- IMPROVEMENTS ON ROUTE 6, BRIARWOOD DRIVE TO CROMESETT ROAD |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612268 |
MANSFIELD- CHAUNCY STREET (ROUTE 106) IMPROVEMENTS (PHASE 2) |
Hwy Reconstr - Minor Widening |
DESIGN |
2027 |
612269 |
EASTON- IMPROVEMENTS ON FOUNDRY STREET (ROUTE 106/123) |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612303 |
BRIDGEWATER- METAL BUILDING RENOVATIONS AT 10 FRUIT STREET MAINTENANCE DEPOT |
Vertical Construction (Ch 149) |
DESIGN |
|
612308 |
PLYMOUTH- INSTALLATION OF MODULAR OFFICE AT MAINTENANCE DEPOT ON OBERY AVE |
Vertical Construction (Ch 149) |
DESIGN |
|
612310 |
NORTON- SEEKONK- INSTALLATION OF SITE TRAILERS AND RELATED WORK AT TWO MAINTENANCE DEPOTS |
Vertical Construction (Ch 149) |
DESIGN |
|
612311 |
BARNSTABLE- DENNIS- INSTALLATION OF SITE TRAILERS AND RELATED WORK AT TWO LOCATIONS |
Vertical Construction (Ch 149) |
DESIGN |
|
612524 |
DARTMOUTH- CORRIDOR IMPROVEMENTS ON ROUTE 6, HATHAWAY ROAD TO THE NEW BEDFORD TOWN LINE |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612525 |
ABINGTON- INTERSECTION IMPROVEMENTS, RANDOLPH STREET AND RICHARD A FITTS DRIVE (ROUTE 139) AT CHESTNUT STREET AND OLD RANDOLPH STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
2027 |
612526 |
BROCKTON- IMPROVEMENTS ON FOREST AVENUE, FROM WEST STREET TO BREER STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612540 |
TRURO- WELLFLEET- SHARED-USE PATH CONSTRUCTION ALONG ROUTE 6 (OUTER CAPE COD) |
Bikeway/Bike Path Construction |
DESIGN |
|
612557 |
FAIRHAVEN- NEW BEDFORD- BRIDGE REPLACEMENT, F-01-002=N-06-001 (3PF), US-6 OVER ACUSHNET RIVER |
Bridge Replacement |
DESIGN |
|
612574 |
DENNIS- YARMOUTH- BRIDGE REPLACEMENT, D-07-004=Y-01-003, ROUTE 28 OVER BASS RIVER INCLUDING INTERSECTION IMPROVEMENTS AT MAIN STREET(ROUTE 28)/NORTH MAIN STREET/OLD MAIN STREET |
Bridge Replacement |
DESIGN |
2024 |
612604 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS ON COUNTY STREET, FROM UNION STREET TO KEMPTON STREET |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
612605 |
ROCKLAND- CORRIDOR IMPROVEMENTS ON VFW DRIVE/WEYMOUTH STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612610 |
EDGARTOWN- OAK BLUFFS- BARRIER UPGRADES ON SEAVIEW AVENUE, BEACH ROAD AND EDGARTOWN-OAK BLUFFS ROAD |
Guard Rail & Fencing |
DESIGN |
|
612611 |
ACUSHNET- RECONSTRUCTION OF SOUTH MAIN STREET, FROM MAIN STREET TO ALDEN ROAD |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
612617 |
EASTON- RECONSTRUCTION AND RELATED WORK ON ROUTES 138 AND 123, FROM BELMONT STREET TO DEPOT STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612618 |
COHASSET- CORRIDOR IMPROVEMENTS ON CHIEF JUSTICE CUSHING HIGHWAY (ROUTE 3A) |
Hwy Reconstr - Minor Widening |
DESIGN |
|
612672 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS ON TARKILN HILL ROAD AND ASHLEY BOULEVARD |
Hwy Reconstr - No Added Capacity |
DESIGN |
2028 |
612740 |
FOXBOROUGH- INTERSECTION IMPROVEMENTS AT ROUTE 140/WALNUT STREET AND ROUTE 140/I-95 (SB RAMP) |
Traffic Signals |
DESIGN |
|
612767 |
EASTHAM- ORLEANS- ROTARY IMPROVEMENTS ON ROUTE 6 AT THE EASTHAM/ORLEANS ROTARY |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612768 |
BARNSTABLE- CORRIDOR IMPROVEMENTS ON ROUTE 28, FROM LINCOLN STREET TO GARDEN LANE |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612769 |
HANOVER- CORRIDOR IMPROVEMENTS ON ROUTE 139 (HANOVER STREET) AT MAIN STREET, CENTER STREET AND SILVER STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
2028 |
612770 |
ABINGTON- INTERSECTION IMPROVEMENTS AT ROUTE 18 (BEDFORD STREET) AND ROUTE 123(BROCKTON AVENUE) |
Traffic Signals |
DESIGN |
2028 |
612773 |
RAYNHAM- INTERSECTION IMPROVEMENTS AT NORTH MAIN STREET (ROUTE 104), PLEASANT STREET, SOUTH MAIN STREET (ROUTE 104) AND ORCHARD STREET |
Traffic Signals |
DESIGN |
|
612774 |
ATTLEBORO- INTERCHANGE IMPROVEMENTS AT I-95 AND ROUTE 123 |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612776 |
BARNSTABLE- INTERSECTION IMPROVEMENTS AT ROUTE 28 (FALMOUTH ROAD) AND SANTUIT/NEWTOWN ROAD |
Traffic Signals |
DESIGN |
|
612882 |
FALL RIVER- SOMERSET- FENDER SYSTEM REPAIRS, F-02-058=S-16-008, I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE) |
Bridge Maintenance |
DESIGN |
|
612889 |
SHARON- COTTAGE STREET SCHOOL IMPROVEMENTS (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2026 |
612900 |
ATTLEBORO- PIER REPLACEMENT AT BRIDGE A-16-040 (3KU), P&W RAILROAD OVER I-95 |
Bridge Preservation |
DESIGN |
|
612903 |
CHATHAM- CULVERT REPLACEMENT AT FROST FISH CREEK AND ORLEANS ROAD (ROUTE 28) (DESIGN ONLY) |
Culvert Replacement |
DESIGN |
|
612960 |
BARNSTABLE- CORRIDOR IMPROVEMENTS ON ROUTE 132, FROM BEARSES WAY TO THE AIRPORT ROTARY |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612975 |
EASTON- INTERSECTION IMPROVEMENTS AT ROUTE 138 AND TURNPIKE STREET, AT ROUTE 138 AND PURCHASE STREET, AT TURNPIKE STREET AND PURCHASE STREET |
Traffic Signals |
DESIGN |
|
612976 |
OAK BLUFFS- CULVERT REPLACEMENT ON BEACH ROAD AT FARM POND |
Culvert Reconstruction/Rehab |
DESIGN |
|
612979 |
SWANSEA- CORRIDOR IMPROVEMENTS ON ROUTE 118, FROM MILFORD ROAD TO WOOD STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612980 |
BARNSTABLE- PEDESTRIAN IMPROVEMENTS ON ROUTE 6A, FROM ROUTE 132 TO OLD JAIL LANE |
Sidewalk Construction and Repairs |
DESIGN |
|
613005 |
DISTRICT 5- OFF-SYSTEM BRIDGE BUNDLE, D-14-008, L-01-011, L-01-015, M-03-018, P-13-031, P-13-035, W-06-038 (DB) |
Bridge Preservation |
DESIGN |
|
613012 |
DISTRICT 5- SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS |
Safety Improvements |
DESIGN |
|
613013 |
DISTRICT 5- SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS (MARTHA'S VINEYARD) |
Safety Improvements |
DESIGN |
|
613052 |
MANSFIELD- CORRIDOR IMPROVEMENTS ON CHAUNCY STREET (ROUTE 106) FROM STATE ROUTE 140 TO COPELAND DRIVE |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2025 |
613080 |
DARTMOUTH- BRIDGE REHABILITATION, D-04-002 (3J4), BRIDGE STREET OVERAPPONAGANSETT RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
613081 |
REHOBOTH- BRIDGE REPLACEMENT, R-04-001, ROUTE 44 (WINTHROP STREET) OVER THE PALMER RIVER |
Bridge Replacement |
DESIGN |
|
613083 |
TAUNTON- DRIVE INSTALLATION AND TRAFFIC SIGNAL UPDGRADES AT ROUTE 140 (COUNTY STREET) AND MOZZONE BOULEVARD |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
613094 |
TAUNTON- TAUNTON RIVER RAIL TRAIL CONSTRUCTION |
Bikeway/Bike Path Construction |
DESIGN |
2028 |
613095 |
ATTLEBORO- CORRIDOR IMPROVEMENTS ON ROUTE 123, FROM LATHROP ROAD TO THATCHER STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
2027 |
613106 |
REHOBOTH- DECK REPLACEMENT, R-04-018 (3U4, 3U5), I-195 (EB/WB) OVER PALMER RIVER |
Bridge Preservation |
DESIGN |
|
613114 |
WELLFLEET- INTERSECTION IMPROVEMENTS ON ROUTE 6 AT SCHOOL STREET AND LAWRENCE ROAD |
Traffic Signals |
DESIGN |
|
613117 |
HOLBROOK- CORRIDOR IMPROVEMENTS ON NORTH AND SOUTH FRANKLIN STREETS (ROUTE 37), FROM FRANKLIN TERRACE TO ROYAL AVENUE |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
613129 |
NANTUCKET- INTERSECTION IMPROVEMENTS AT MILESTONE ROAD AND POLPIS ROAD AND EXTENSION OF 'SCONSET BIKEPATH |
Safety Improvements |
DESIGN |
2024 |
613132 |
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-004, FOREST STREET OVER TOWN RIVER |
Bridge Replacement |
DESIGN |
|
613142 |
DISTRICT 5- ITS ROADWAY EQUIPMENT FOR HIGHWAY OPERATIONS |
Intelligent Transportation Sys |
DESIGN |
2024 |
613156 |
BARNSTABLE- CULVERT REPLACEMENT ON ROUTE 6A OVER BOAT COVE CREEK |
Culvert Replacement |
DESIGN |
|
613193 |
DARTMOUTH TO WAREHAM- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF INTERSTATE 195 |
Structural Signing |
DESIGN |
2024 |
613194 |
WAREHAM TO RAYNHAM- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF INTERSTATE 495 |
Structural Signing |
DESIGN |
2024 |
613198 |
SOMERSET- BRIDGE PRESERVATION OF S-16-009 (3Y9), S-16-010 (3PD), S-16-011 (3YA) AND S-16-012 (3U6 & 3U7) ALONG I-195 |
Bridge Preservation |
DESIGN |
2024 |
613199 |
SANDWICH- BRIDGE PRESERVATION, S-04-006 (470) AND S-04-009 (471), ROUTE 6 (MID-CAPE HIGHWAY EB/WB) OVER STATE ROUTE 130 |
Bridge Preservation |
DESIGN |
|
613200 |
SANDWICH- BRIDGE PRESERVATION, S-04-008 (4BA) AND S-04-011 (4B9), CHASE ROAD OVER ROUTE 6 (MID-CAPE HIGHWAY) |
Bridge Preservation |
DESIGN |
|
613202 |
BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY) |
Bridge Preservation |
DESIGN |
|
613210 |
FALL RIVER- BRIDGE PRESERVATION, F-02-053 (3VB), NORTH MAIN STREET OVER STATE ROUTE 79 |
Bridge Preservation |
DESIGN |
|
613238 |
WESTPORT- BRIDGE PRESERVATION OF W-30-025 (3UD, 3UE), I-195 OVER SANFORD ROAD |
Bridge Preservation |
DESIGN |
|
613245 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A, B, & C) |
Resurfacing |
DESIGN |
|
613257 |
TAUNTON- INTERSECTION IMPROVEMENTS AT WINTHROP STREET (ROUTE 44) AND HIGHLAND STREET |
Traffic Signals |
DESIGN |
|
613269 |
DUXBURY- INTERSECTION IMPROVEMENTS AT ROUTE 53 AND FRANKLIN STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
613270 |
MATTAPOISETT- CORRIDOR IMPROVEMENTS ONROUTE 6, FROM FAIRHAVEN T.L. TO CHURCH STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
613271 |
SANDWICH- SHARED-USE PATH CONSTRUCTION, FROM ROUTE 130 AT SHAWME ROAD TO FREEZER ROAD TO CANAL SERVICE ROAD |
Bikeway/Bike Path Construction |
DESIGN |
|
613273 |
ATTLEBORO- NORTH ATTLEBORO- SYSTEMATIC BRIDGE PRESERVATION AT 5 BRIDGES ALONG THE I-95 CORRIDOR |
Bridge Preservation |
DESIGN |
|
613274 |
FOXBORO- BRIDGE PRESERVATION AT 6 BRIDGES ALONG THE I-95 CORRIDOR |
Bridge Preservation |
DESIGN |
|
613277 |
STOUGHTON- INTERSECTION IMPROVEMENTS AT ROUTE 27 (PARK STREET) AND TURNPIKE STREET |
Traffic Signals |
DESIGN |
|
613278 |
HARWICH- SAFETY IMPROVEMENTS AND RELATED WORK ON OLD COLONY TRAIL MODERNIZATION |
Bikeway/Bike Path Construction |
DESIGN |
|
613280 |
DISTRICT 5- SCHEDULED AND EMERGENCY IMPACT ATTENUATORS INSTALLATION AND REPAIRS AT VARIOUS LOCATIONS |
Impact Attenuators |
DESIGN |
|
613286 |
ATTLEBORO- BRIDGE REPLACEMENT, A-16-041 (3XA), BACON STREET OVER I-95 |
Bridge Replacement |
DESIGN |
|
613287 |
STOUGHTON- BICYCLE AND PEDESTRIAN IMPROVEMENTS ON ROUTE 27 (PARK STREET) |
Pavement Marking |
DESIGN |
|
613289 |
PROVINCETOWN- TRURO- CORRIDOR MODERNIZATION ON ROUTE 6, FROM SHANK PAINTER ROAD TO SHORE ROAD |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
613292 |
BRIDGEWATER- BRIDGE REHABILITATION, B-23-001 (44H), VERNON STREET OVER TAUNTON RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
613306 |
EAST BRIDGEWATER- BRIDGE REPLACEMENT, E-01-010 (BVT) POND STREET OVER SATUCKET RIVER |
Bridge Replacement |
DESIGN |
|
613343 |
FOXBOROUGH - INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 |
Resurfacing Interstate |
DESIGN |
|
613356 |
SHARON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 |
Resurfacing Interstate |
DESIGN |
|
613358 |
STOUGHTON- CORRIDOR IMPROVEMENTS ON ROUTE 138, FROM CANTON T.L. TO CHARLES AVENUE (PHASE 2) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
613359 |
FREETOWN - FREETOWN ELEMENTARY SCHOOL (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
613384 |
FAIRHAVEN- NEW BEDFORD- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-195 |
Resurfacing Interstate |
DESIGN |
|
613386 |
MANSFIELD- NORTON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-495 |
Resurfacing Interstate |
DESIGN |
|
613407 |
ORLEANS- MASONRY AND STRUCTURAL REPAIRS TO MAINTENANCE GARAGE AT 9 BAY RIDGE LANE |
Vertical Construction (Ch 149) |
DESIGN |
|
613458 |
COHASSET- CHEMICAL STORAGE SHED ROOF REPLACEMENT AND RELATED REPAIRS AT MASSDOT MAINTENANCE FACILITY |
Vertical Construction (Ch 149) |
DESIGN |
|
613595 |
NANTUCKET- INTERSECTION IMPROVEMENTS ON MILESTONE ROAD AT NOBADEER FARM ROAD |
Hwy Reconstr - Minor Widening |
DESIGN |
|
613596 |
MIDDLEBOROUGH- INTERSECTION IMPROVEMENTS ON ROUTE 28 AT MERCHANT'S WAY AND WILLIAMS PLACE |
Traffic Signals |
DESIGN |
|
613597 |
NANTUCKET- INTERSECTION IMPROVEMENTS AND MILESTONE ROTARY RECONSTRUCTION |
Hwy Reconstr - Minor Widening |
DESIGN |
|
613599 |
HANOVER- INTERSECTION IMPROVEMENTS AT COLUMBIA ROAD (ROUTE 53/139) AND BROADWAY |
Traffic Signals |
DESIGN |
|
613604 |
DISTRICT 5- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS |
Safety Improvements |
DESIGN |
|
613610 |
ROCHESTER- BRIDGE REPLACEMENT, R-07-009 (BVG), ST 105 (MARION ROAD) OVER DOGGETT BROOK |
Bridge Replacement |
DESIGN |
|
613636 |
DIGHTON- BRIDGE REPLACEMENT, D-08-002 (3L9), PLEASANT STREET OVER MUDDY COVE |
Bridge Replacement |
DESIGN |
|
613642 |
RAYNHAM- TAUNTON- BRIDGE RECONSTRUCTION, R-02-003=T-01-004 (3M4), SOUTH STREET EAST OVER THE TAUNTON RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
613643 |
WHITMAN- CORRIDOR IMPROVEMENTS ON SOUTH AVENUE (ROUTE 27) |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
613644 |
NORFOLK- WRENTHAM- WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) (DESIGN ONLY) |
Bikeway/Bike Path Construction |
DESIGN |
|
613647 |
TAUNTON- INTERSECTION IMPROVEMENTS AT WINTER STREET AND SCHOOL STREET |
Traffic Signals |
DESIGN |
|
613663 |
DISTRICT 5- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT MULTIPLE LOCATIONS |
Sidewalk Construction and Repairs |
DESIGN |
|
613675 |
NANTUCKET- MINOR WIDENING OF MILESTONE ROAD, FROM NEW SOUTH ROAD TO JAMES COFFIN MEMORIAL ROTARY |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
613678 |
BOURNE- BRIDGE REPLACEMENT, B-17-004 (BOURNE BRIDGE) ROUTE 28 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RR, B-17-019 (45L) ROUTE 28 OVER US 6 AND B-17-026 (457) ROUTE 28 ON/OFF RAMP OVER ROUTE 25 (CAPE COD BRIDGES PROGRAM PHASE II) |
Bridge Replacement |
DESIGN |
|
613679 |
DISTRICT 5- SCHEDULED AND EMERGENCY SALT STORAGE SHED AND LIQUID STORAGE TANK REPAIRS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
DESIGN |
|
613680 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING VARIOUS LOCATIONS AREA D |
Tree Trimming |
DESIGN |
|
613681 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AREAS A, B, & C |
Tree Trimming |
DESIGN |
|
613692 |
DISTRICT 5- CRACK SEALING AT VARIOUS LOCATIONS |
Crack Sealing |
DESIGN |
|
4060 |
OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT (TEMP) O-01-001=T-04-001, BEACH ROAD OVER LAGOON POND |
Bridge Replacement |
COMPLETE |
|
5300 |
BERKLEY- DIGHTON- BRIDGE REPLACEMENT, B-08-001=D-08-011, ELM STREET (BERKLEY) CENTER STREET (DIGHTON) OVER THE TAUNTON RIVER |
Bridge Replacement |
COMPLETE |
|
19505 |
SHARON- BRIDGE REPLACEMENT, BR# S-09-004 DEPOT STREET OVER THE MBTA & AMTRAK |
Bridge Replacement |
COMPLETE |
|
24090 |
KINGSTON- BRIDGE REPLACEMENT, K-01-002, ELM STREET OVER THE JONES RIVER |
Bridge Replacement |
COMPLETE |
|
41800 |
EASTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ALONG A SECTION OF MAIN STREET |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
54140 |
SWANSEA- BRIDGE REPLACEMENT, BR# S-35-001, OLD PROVIDENCE ROAD OVER THE PALMER RIVER |
Bridge Replacement |
COMPLETE |
|
54400 |
ATTLEBORO- BRIDGE REPLACEMENT, A-16-025, OLIVE STREET OVER MBTA/AMTRAK |
Bridge Replacement |
COMPLETE |
|
55400 |
FALMOUTH- BRIDGE REPLACEMENT, F-03-008, PALMER AVENUE OVER THE BAY COLONY RAILROAD |
Bridge Replacement |
COMPLETE |
|
79136 |
SOMERSET- SWANSEA- BRIDGE REPLACEMENT, S-16-003=S-35-003, ROUTE 103 (WILBUR AVENUE) OVER THE LEE RIVER |
Bridge Replacement |
COMPLETE |
|
91555 |
STOUGHTON- ROADWAY RECONSTRUCTION ON SECTIONS OF TURNPIKE AND PLEASANT STREETS |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
94925 |
ABINGTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 18 FROM ROUTE 139 TO THE WHITMAN T.L. |
Hwy Reconstr - Major Widening |
COMPLETE |
|
110200 |
MARSHFIELD- SCITUATE- BRIDGE REPLACEMENT, BR# M-07-002=S-07-002 ROUTE 3A OVER THE NORTH RIVER |
Bridge Replacement |
COMPLETE |
|
113100 |
CARVER- KINGSTON- PLYMPTON- RELOCATION OF A SECTION OF ROUTE 44 INCLUDING 6 BRIDGES (SECTION I) |
Highway Relocation |
COMPLETE |
|
114500 |
HANOVER- PEMBROKE- BRIDGE REHABILITATION, BR# H-06-005=P-05-005 ROUTE 53 (WASHINGTON STREET) OVER THE NORTH RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
114501 |
HANOVER- RECONSTRUCTION OF ROUTE 53, FROM MILL STREET TO POND STREET (PHASE 1B) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
114880 |
HINGHAM- NORWELL- INTERSECTION OF ROUTE 53 (WHITING STREET) & ROUTE 228 (WASHINGTON STREET) (QUEEN ANNE'S CORNER) |
Safety Improvements |
COMPLETE |
|
117808 |
SANDWICH- RESURFACING AND RELATED WORK ON ROUTE 6A FROM TUPPER ROAD (EAST END) TO CHIPMAN ROAD |
Resurfacing |
COMPLETE |
|
130200 |
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-003, SOUTH STREET OVER THE TOWN RIVER |
Bridge Replacement |
COMPLETE |
|
133891 |
ATTLEBORO- BRIDGE REPLACEMENT AND ROADWAY RELOCATION, BR# A-16-026 THATCHER STREET OVER MBTA/CONRAIL/AMTRAK |
Bridge Replacement |
COMPLETE |
|
600004 |
BROCKTON- ROADWAY RECONSTRUCTION, BELMONT ST. (RT.123) @ PEARL ST; NORTH PEARL ST. (RT.27) @ OAK ST.; OAK ST. @ RESERVOIR ST. |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600027 |
FALL RIVER- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, PRESIDENT AVENUE (ROUTE 6) @ DAVOL STREET (ROUTE 138) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600115 |
SWANSEA- ROADWAY RECONSTRUCTION AND RELATED WORK ON BARK STREET AND MARVEL STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600284 |
TAUNTON- RECONSTRUCTION OF ROUTE 138, FROM BAKER STREET TO WEIR STREET (10,000 FT +/-) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600356 |
LAKEVILLE- MIDDLEBOROUGH- RELOCATION OF ROUTE 79 (RHODE ISLAND ROAD) |
Highway Relocation |
COMPLETE |
|
600365 |
BROCKTON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 27 (PLEASANT STREET & CRESCENT STREET) |
Resurfacing |
COMPLETE |
|
600381 |
PEMBROKE- INTERSECTION IMPROVEMENT PROJECT, ROUTE 14 AND ROUTE 53; ROUTE 14 AND ROUTE 36; ROUTE 36 AND PEMBROKE FIRE DEPARTMENT |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600382 |
PEMBROKE- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS AT TWO LOCATIONS ON ROUTE 27 (SCHOOL STREET) (PART 1) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600390 |
RAYNHAM- RESURFACING AND RELATED WORK, SOUTH MAIN STREET (ROUTE 104) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600397 |
EAST BRIDGEWATER- HANSON- RECONSTRUCTION OF ROUTE 27 (FRANKLIN STREET) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600398 |
EASTON- RESURFACING AND RELATED WORK ON ROUTE 123 (DEPOT STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600404 |
HANOVER- RESURFACING AND RELATED WORK ON ROUTE 123 (WEBSTER STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600413 |
KINGSTON- RECONSTRUCTION OF ROUTE 27 (PEMBROKE STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600415 |
MANSFIELD - ROUTE 106 RECONSTRUCTION AND BRIDGE NO. M-3-12 OVER CANOE RIVER |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600416 |
LAKEVILLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 105 (BEDFORD STREET) |
Resurfacing |
COMPLETE |
|
600422 |
BROCKTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON A SECTION OF ROUTE 123 (BELMONT STREET) |
Resurfacing |
COMPLETE |
|
600426 |
PLYMOUTH- RECONSTRUCTION OF ROUTE 44 (SAMOSET STREET) FROM ROUTE 3 (NB RAMP) EASTERLY TO WATER STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
600467 |
SEEKONK- SAFETY IMPROVEMENTS ON ROUTE 6 (HIGHLAND AVENUE) FROM ROUTE 114A (FALL RIVER AVENUE) TO COMMERCE WAY (SECTION III)) |
Safety Improvements |
COMPLETE |
|
600469 |
DUXBURY- SAFETY IMPROVEMENT PROJECT ON ROUTE 14 (CONGRESS STREET) AT LINCOLN STREET |
Traffic Signals |
COMPLETE |
|
600496 |
DARTMOUTH- RECONSTRUCTION OF FAUNCE CORNER ROAD & IMPROVEMENTS TO I-195 RAMPS & INTERSECTIONS, INCLUDES REPLACEMENT OF D-04-016 OVER I-195 |
New Construction |
COMPLETE |
|
600518 |
HINGHAM- INTERSECTION IMPROVEMENTS AT DERBY STREET, WHITING STREET (ROUTE 53) AND GARDNER STREET |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600600 |
SEEKONK- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, ROUTE 6 (HIGHLAND AVE.) FROM ROUTE 114A TO THE RHODE ISLAND S.L. (SECTION II) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
600710 |
WRENTHAM- SAFETY IMPROVEMENTS, RT.1A (SOUTH STREET) @ RT.121 (WEST STREET) (WAMPUM CORNER) |
Safety Improvements |
COMPLETE |
|
600749 |
FALL RIVER- BRIDGE REPLACEMENT, BR# F-02-023, CLARK STREET OVER CSX & MBTA |
Bridge Reconstruction/Rehab |
COMPLETE |
|
600756 |
HARWICH- DECK REPLACEMENT, BR# H-10-016 ROUTE 6 (MID CAPE HIGHWAY) OVER DEPOT STREET |
Bridge Reconstruction/Rehab |
COMPLETE |
|
600762 |
MIDDLEBOROUGH- BRIDGE REPLACEMENT, BR# M-18-012 NEMASKET STREET OVER THE NEMASKET RIVER |
Bridge Replacement |
COMPLETE |
|
600767 |
NORWOOD- SUPERSTRUCTURE REPLACEMENTS, BR# N-25-022 NAHATAN ST. (SOUTH) OVER ROUTE 1 & N-25-023 NAHANTAN ST. (NORTH) OVER ROUTE 1 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
600772 |
STOUGHTON- BRIDGE PRESERVATION DECK REPLACEMENT, BR# S-28-009, ROUTE 139 (LINDELOF AVENUE) OVER ROUTE 24 |
Structures Maintenance |
COMPLETE |
|
600773 |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-027 COHANNET STREET OVER THE THREE MILE RIVER |
Bridge Replacement |
COMPLETE |
|
600790 |
FALL RIVER- SOMERSET- CONSTRUCTION OF APPROACH SPAN SUBSTRUCTURE, BR# F-02-094=S-16-014 BRIGHTMAN ST OVER TAUNTON RIVER (CONTRACT 2) |
Bridge Replacement |
COMPLETE |
|
600791 |
FALL RIVER- SOMERSET- BRIDGE REPLACEMENT, BR# F-02-001=S-16-004 BRIGHTMAN STREET OVER TAUNTON RIVER (CONTRACT 3) |
Bridge Replacement |
COMPLETE |
|
600792 |
FALL RIVER- SOMERSET- BRIDGE REPLACEMENT, ROADWAY & RELATED WORK, F-02-094=S-16-014, BRIGHTMAN STREET OVER THE TAUNTON RIVER |
Bridge Replacement |
COMPLETE |
|
600803 |
NORWOOD- SHARON- WALPOLE- RESURFACING AND RELATED WORK, INCLUDING BRIDGE PAINTING & REPAIR ON ROUTE I-95 |
Resurfacing |
COMPLETE |
|
600805 |
FOXBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 |
Resurfacing |
COMPLETE |
|
600808 |
ATTLEBORO- NORTH ATTLEBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 |
Resurfacing |
COMPLETE |
|
600829 |
DARTMOUTH- ROADWAY RECONSTRUCTION AND RELATED WORK ON REED ROAD FROM RT.I-195 TO RT.6 (6,100 FT) INCLUDING 2 BRIDGE REPLACEMENTS |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
600885 |
FOXBOROUGH- FRANKLIN- MANSFIELD- PLAINVILLE- WRENTHAM- RESURFACING AND RELATED WORK TO A SECTION OF ROUTE I-495 |
Resurfacing |
COMPLETE |
|
600900 |
NEW BEDFORD- RECONSTRUCTION OF ROUTE 18 (ACUSHNET AVENUE) FROM MM 4.7 TO MM 6.5 (9600 FT) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
600922 |
MANSFIELD- BRIDGE REPLACEMENT, BR# M-03-015 ELM STREET OVER AMTRAK |
Bridge Replacement |
COMPLETE |
|
600964 |
HINGHAM- BRIDGE REHABILITATION, BR# H-15-005 ROUTE 3A (JUSTICE CUSHING WAY) OVER EOTC & MBTA ROW |
Bridge Reconstruction/Rehab |
COMPLETE |
|
600966 |
BARNSTABLE- BRIDGE REPLACEMENT, BR# B-01-002 CRAIGVILLE BEACH ROAD OVER CENTERVILLE RIVER |
Bridge Replacement |
COMPLETE |
|
600967 |
BARNSTABLE- MASHPEE- BRIDGE REPLACEMENT, BR# B-01-006=M-08-001 SCHOOL STREET OVER SANTUIT RIVER |
Bridge Replacement |
COMPLETE |
|
600970 |
FALMOUTH- BRIDGE REPLACEMENT, BR# F-03-014 CHURCH STREET OVER ACCESS ROAD & BIKEPATH |
Bridge Replacement |
COMPLETE |
|
601005 |
FAIRHAVEN- RECONSTRUCTION OF HOWLAND ROAD, FROM ALDEN STREET TO THE NEW BEDFORD C.L. |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
601049 |
FAIRHAVEN- NEW BEDFORD- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 |
Resurfacing |
COMPLETE |
|
601050 |
FALL RIVER- WESTPORT- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 AND RAMPS |
Resurfacing |
COMPLETE |
|
601051 |
REHOBOTH- SEEKONK- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 AND RAMPS |
Resurfacing |
COMPLETE |
|
601104 |
BRIDGEWATER- MIDDLEBORO- RESURFACING & RELATED WORK ON ROUTES 18 & 28, FROM BRIDGEWATER TO MIDDLEBORO ROTARY |
Resurfacing |
COMPLETE |
|
601107 |
MIDDLEBOROUGH- ROCHESTER- WAREHAM- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 25 AND ROUTE I-495 |
Resurfacing |
COMPLETE |
|
601263 |
ACUSHNET- NEW BEDFORD- BRIDGE REPLACEMENT, BR# A-03-001=N-06-003 SLOCUM STREET/WOOD STREET OVER THE ACUSHNET RIVER |
Bridge Replacement |
COMPLETE |
|
601284 |
DISTRICT 5- COLD PLANING, RESURFACING AND FULL DEPTH EXCAVATION UNDER BRIDGES AT VARIOUS LOCATIONS (AREA 5B) |
Resurfacing |
COMPLETE |
|
601312 |
DARTMOUTH- NEW BEDFORD- IMPROVEMENTS ON DARTMOUTH STREET, FROM ROCKDALE AVENUE TO ROGER STREET (3R PROJECT) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
601332 |
EASTON- RECONSTRUCTION OF ROUTE 123 (FOUNDRY STREET) FROM NORTON T.L. TO ROUTE 106 (3R PROJECT) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601338 |
BROCKTON- RESURFACING AND RELATED WORK ON NORTH MAIN STREET FROM PROSPECT STREET TO AVON T.L. (19,000 FEET) |
Resurfacing |
COMPLETE |
|
601339 |
BROCKTON- ROADWAY RECONSTRUCTION ON WEST CHESTNUT ST. FROM PEARL ST. (STA. 1+00 METRIC) TO JUST WEST OF BURKE DRIVE (STA. 14+40) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601347 |
BROCKTON- RECONSTRUCTION OF WINTER STREET, FROM HOWARD STREET TO NORTH CARY STREET (5,300 FEET - 3R PROJECT) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601387 |
NORFOLK- ROADWAY RECONSTRUCTION AT THE INTERSECTION OF MAIN, UNION & ROCKWOOD STREETS |
Hwy Reconstr - Major Widening |
COMPLETE |
|
601393 |
BROCKTON- BRIDGE REPLACEMENT, B-25-060 (AVA), BARTLETT STREET OVER SALISBURY BROOK |
Bridge Replacement |
COMPLETE |
|
601395 |
MANSFIELD- BRIDGE REPLACEMENT, BR# M-03-014 SCHOOL STREET OVER AMTRAK |
Bridge Replacement |
COMPLETE |
|
601396 |
BARNSTABLE- ROADWAY RECONSTRUCTION INCLUDING TRAFFIC SIGNALS ON A SECTION OF ROUTE 28 (FALMOUTH ROAD) |
Safety Improvements |
COMPLETE |
|
601405 |
HALIFAX- RECONSTRUCTION OF ROUTE 36 (HOLMES STREET) FROM ROUTE 106 TO PEMBROKE T.L. (APPROX. 2 MILES) |
Hwy Reconstr - Major Widening |
COMPLETE |
|
601416 |
SHARON- RECONSTRUCTION OF NORTH AND SOUTH MAIN STREETS ( INCLUDING PART OF DEPOT STREET ) POST OFFICE SQUARE IMPROVEMENTS |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601441 |
BARNSTABLE- RECONSTRUCTION ON ROUTE 132 (2 LANES TO 4 LANES) FROM ROUTE 6 TO BEARSE'S WAY (2 MILES) |
Safety Improvements |
COMPLETE |
|
601443 |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-008 INGELL STREET OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
601447 |
FALL RIVER- SOMERSET- BRIDGE PAINTING, F-02-058=S-16-008, ROUTE I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE - PHASE I) |
Structures Maintenance |
COMPLETE |
|
601466 |
CHATHAM- CONSTRUCTION OF A MULTI-USE TRAIL (CAPE COD RAIL TRAIL) |
Bikeway/Bike Path Construction |
COMPLETE |
|
601472 |
HULL- BRIDGE REPLACEMENT, BR# H-26-003 FITZPATRICK WAY OVER TIDAL INLET |
Bridge Replacement |
COMPLETE |
|
601473 |
TAUNTON- BRIDGE REREHABILITATION, BR# T-01-018 WEST BRITTANIA ST./ MILL RIVER & REPLACEMENT, BR# T-01-019 OVER MILL RIVER CANAL |
Bridge Reconstruction/Rehab |
COMPLETE |
|
601494 |
NORTH ATTLEBOROUGH- BRIDGE REHABILITATION, BR# N-16-046 ROUTE 152 OVER ROUTE I-95 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
601538 |
BRIDGEWATER- 3R PROJECT, ROUTE 104 (PLEASANT STREET) FROM PROSPECT STREET TO ROUTE 24 |
Hwy Reconstr - Major Widening |
COMPLETE |
|
601539 |
EAST BRIDGEWATER- INTERSECTION IMPROVEMENTS, 3 LOCATIONS ROUTE 106 @ ROUTE 18; UNION ST. @ CENTRAL ST.; & UNION ST. @ ROUTE 18 |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601554 |
ATTLEBORO- BRIDGE REPLACEMENTS, BR# A-16-031, COUNTY STREET OVER AMTRAK & BR# A-16-003, COUNTY STREET OVER SEVEN MILE RIVER |
Bridge Replacement |
COMPLETE |
|
601557 |
BRIDGEWATER- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 104 (PLYMOUTH STREET) FROM HAYWARD STREET TO HIGH STREET |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
601564 |
SHARON- WALPOLE- CONSTRUCTION OF METAL STORAGE FACILITY, MAINTENANCE DEPOT AT ROUTE 27 & ROUTE 1 |
Vertical Construction (Ch 149) |
COMPLETE |
|
601571 |
YARMOUTH- CONSTRUCTION OF PRE-ENGINEERED METAL STORAGE FACILITY - WILLOW STREET MAINT. DEPOT |
Vertical Construction (Ch 149) |
COMPLETE |
|
601606 |
HULL- ROADWAY RECONSTRUCTION AND RELATED WORK, SPRING STREET & MAIN STREET FROM NANTASKET AVENUE TO PEMBERTON WHARF |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601617 |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-011 SPRING STREET OVER MILL RIVER |
Bridge Replacement |
COMPLETE |
|
601629 |
TAUNTON- BUILDING RENOVATIONS AT THE DISTRICT 5 OFFICE, ROUTE 140 (1000 COUNTY STREET) |
Vertical Construction (Ch 149) |
COMPLETE |
|
601644 |
BROCKTON - ROADWAY RECONSTRUCTION & RELATED WORK (INCLUDING SIGNALS) ON A SECTION OF WEST ELM STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601668 |
DISTRICT 5- CLEANING, PAINTING AND HEAT STRAIGHTENING OF VARIOUS STEEL BRIDGES |
Structures Maintenance |
COMPLETE |
|
601669 |
DISTRICT 5- RESURFACING AND RELATED WORK - VARIOUS LOCATIONS AREA 5A |
Resurfacing |
COMPLETE |
|
601717 |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-010 HIGH STREET OVER BAY COLONY RAILROAD |
Bridge Replacement |
COMPLETE |
|
601751 |
YARMOUTH- RECONSTRUCTION OF BUCK ISLAND RD BETWEEN CAMP ST & WINSLOW GRAY RD AND TOWN BROOK RD BETWEEN BUCK ISLAND RD & RT.28 |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601755 |
BERKLEY- TAUNTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 24 |
Resurfacing |
COMPLETE |
|
601782 |
FOXBOROUGH- ROADWAY RECONSTRUCTION IN THE CENTRAL BUSINESS DISTRICT |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601831 |
ABINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 123 |
Resurfacing |
COMPLETE |
|
601849 |
SANDWICH- CONSTRUCTION OF SITE IMPROVEMENTS AT THE ROUTE 6 REST AREA (WESTBOUND) (P.V. CHANGE) |
Vertical Construction (Ch 149) |
COMPLETE |
|
601853 |
PLAINVILLE- RECONSTRUCTION, ROUTE 1A (SOUTH STREET) AND BACON STREET (ROUTE 106) INTERSECTION |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601854 |
WEST BRIDGEWATER- RECONSTRUCTION, MANLEY STREET FROM ROUTE 106 (WEST CENTER ST.) TO BROCKTON T.L. |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601889 |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-029 FISHER STREET OVER THREE MILE RIVER |
Bridge Replacement |
COMPLETE |
|
601916 |
BARNSTABLE- RECLAMATION OF BEARSE'S WAY FROM ROUTE 28 NORTH TO PITCHER'S WAY (4,300 FEET) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
601930 |
MASHPEE- SIDEWALK AND SHOULDER CONSTRUCTION ALONG ROUTE 28 (FALMOUTH ROAD) FROM FALMOUTH T.L. TO SHELL BACK WAY (2,288') |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601932 |
FRANKLIN- MANSFIELD- RECONSTRUCTION, ROUTE I-495 SB FROM FRANKLIN 110+00 TO NORTON T.L. |
Resurfacing |
COMPLETE |
|
601948 |
FALL RIVER- SOMERSET- BRIDGE REHABILITATION, BR# F-02-058=S-16-008 ROUTE I-195 OVER TAUNTON RIVER (BRAGA BRIDGE) |
Structures Maintenance |
COMPLETE |
|
601955 |
DENNIS- ROADWAY AND RAMP CONSTRUCTION, ROUTE 6 AT THE INTERSECTION WITH ROUTE 134 (INTERCHANGE #9) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601995 |
WESTPORT- BRIDGE PRESERVATION, BR# W-30-030 ROUTE 88 OVER RAILROAD & W-30-031 ROUTE 88 OVER ROUTE 6 |
Structures Maintenance |
COMPLETE |
|
602013 |
NORFOLK- BRIDGE REPLACEMENT, BR# N-13-007 MILLER STREET OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
602016 |
DISTRICT 5- DRAINAGE IMPROVEMENTS, VARIOUS LOCATIONS IN AREA 5A (2 SEPARATE CONTRACTS) |
Miscellaneous/No Prequal |
COMPLETE |
|
602018 |
DISTRICT 5- DRAINAGE IMPROVEMENTS, VARIOUS LOCATIONS IN AREA 5B (2 SEPARATE CONTRACTS) |
Miscellaneous/No Prequal |
COMPLETE |
|
602025 |
DISTRICT 5- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, VARIOUS LOCATIONS AREA B |
Resurfacing |
COMPLETE |
|
602032 |
DISTRICT 5- TRAFFIC SIGNAL BETTERMENT, VARIOUS LOCATIONS (5 SEPARATE CONTRACTS) |
Traffic Signals |
COMPLETE |
|
602055 |
WESTPORT- BRIDGE REPLACEMENT, BR# W-30-002 HIX BRIDGE ROAD OVER EAST BRANCH WESTPORT RIVER |
Bridge Replacement |
COMPLETE |
|
602071 |
FAIRHAVEN- NEW BEDFORD- BRIDGE REHABILITATION, BR# F-01-002=N-06-001 ROUTE 6 OVER THE ACUSHNET RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602073 |
LAKEVILLE- MIDDLEBOROUGH- RAYNHAM- TAUNTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 44 |
Resurfacing |
COMPLETE |
|
602092 |
TAUNTON- BRIDGE REHABILITATION, BR# T-01-009 ROUTE 140 (SUMMER STREET) OVER THE BAY COLONY RAILROAD |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602158 |
ATTLEBORO- INTERSECTION IMPROVEMENT, ROUTE 1 AT MAY STREET |
Safety Improvements |
COMPLETE |
|
602161 |
LAKEVILLE- BRIDGE REHABILITATIONS, BR# L-01-010 HIGHLAND AVENUE OVER ROUTE 140 N.B. & L-01-014 HIGHLAND AVE. OVER ROUTE 140 S.B. |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602190 |
DISTRICT 5- DARTMOUTH TO WAREHAM TO RAYNHAM- GUIDE SIGN REPLACEMENTS & SAFETY IMPROVEMENTS ON I-195, I-495 & ROUTE 25 |
Sign Installation/Upgrading |
COMPLETE |
|
602198 |
ACUSHNET- RESURFACING AND RELATED WORK ON SOUTH MAIN STREET FROM MAIN STREET TO PEMBROKE AVENUE (2,144 FEET) |
Resurfacing |
COMPLETE |
|
602213 |
ORLEANS- INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CHATHAM ROAD (ROUTE 28) & CRANBERRY HIGHWAY (ROUTE 6A) |
New Construction |
COMPLETE |
|
602249 |
NORTH ATTLEBOROUGH- TRAFFIC SIGNAL RECONSTRUCTION ON ROUTE 1 (EAST WASHINGTON STREET) AT ELM STREET |
Traffic Signals |
COMPLETE |
|
602258 |
SOMERSET- RESURFACING & RELATED WORK ON ROUTE 138, FROM THE ROUTE 6/103 INTERSECTION TO THE DIGHTON T.L. |
Resurfacing |
COMPLETE |
|
602265 |
WESTPORT- BRIDGE REHABILITATION, BR# W-30-016 ROUTE 88 OVER THE WESTPORT RIVER (FONTAINE BRIDGE) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602293 |
HARWICH- BRIDGE REHABILITATION, BR# H-10-001 LOWER COUNTY ROAD OVER HERRING RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602301 |
AVON- ROADWAY RECONSTRUCTION ON WEST MAIN STREET TO BROCKTON, AVON TOWNLINE |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602309 |
HARWICH- CONSTRUCTION OF A BICYCLE PATH BRIDGE H-10-020 (CAPE COD RAIL TRAIL) |
Bikeway/Bike Path Construction |
COMPLETE |
|
602311 |
FREETOWN- LAKEVILLE- NEW BEDFORD- TAUNTON- TREE REMOVAL AND RELATED WORK ON A SECTION OF ROUTE 140 |
Landscaping |
COMPLETE |
|
602326 |
YARMOUTH- RECONSTRUCTION, WILLOW STREET 400 FT. NORTH OF ROUTE 6 TO BARNSTABLE T.L. |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
602337 |
PLYMPTON- RECONSTRUCTION OF ROUTE 58, MAIN STREET & PALMER ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602354 |
NANTUCKET- CONSTRUCTION OF A BICYCLE PATH ALONG EEL POINT ROAD & DIONIS BEACH ROAD AND RECONSTRUCTION OF DIONIS BEACH ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
602355 |
PLYMOUTH- CONSTRUCTION OF THE SEASIDE BIKE TRAIL (ENHANCEMENT) |
Bikeway/Bike Path Construction |
COMPLETE |
|
602356 |
SWANSEA- BICYCLE PATH CONSTRUCTION AND RELATED WORK AT VARIOUS LOCATIONS |
Bikeway/Bike Path Construction |
COMPLETE |
|
602375 |
COHASSET- CONSTRUCTION OF CHEMICAL STORAGE BUILDING AT THE COHASSET MAINTENANCE DEPOT AT CROCKER LANE |
Vertical Construction (Ch 149) |
COMPLETE |
|
602417 |
DUXBURY- HINGHAM- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 3 |
Resurfacing |
COMPLETE |
|
602453 |
DISTRICT 5- EMERGENCY AND NON-ROUTINE STRUCTURAL REPAIRS ON VARIOUS BRIDGES |
Structures Maintenance |
COMPLETE |
|
602466 |
DISTRICT 5- BRIDGE PAINTING AT VARIOUS LOCATIONS |
Painting - Structural |
COMPLETE |
|
602471 |
FALL RIVER- RECONSTRUCTION OF MERIDIAN STREET, FROM WILSON ROAD TO RUTH STREET (3.3 KM) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602472 |
FALL RIVER- HIGHWAY RECONSTRUCTION, NORTH MAIN ST. FROM INTERSECTION OF HERMAN ST. NORTHERLY DIR. TO FREETOWN TL |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602473 |
DARTMOUTH- BRIDGE REPLACEMENT, D-04-008, GULF ROAD OVER THE APPONAGANSETT RIVER (GULF BRIDGE) |
Bridge Replacement |
COMPLETE |
|
602496 |
FOXBOROUGH- NORFOLK- WRENTHAM- RECONSTRUCTION OF ROUTE 115, POND STREET & PINE STREET, FROM NEEDHAM STREET IN NORFOLK TO ROUTE 140 |
New Construction |
COMPLETE |
|
602520 |
EASTHAM- WELLFLEET- TRAFFIC SAFETY IMPROVEMENT PROJECT AT 5 LOCATIONS ALONG ROUTE 6 |
Safety Improvements |
COMPLETE |
|
602531 |
FALMOUTH- BRIDGE REPLACEMENT, BR# F-03-019 MEADOW NECK ROAD OVER THE MOONAKIS RIVER |
Bridge Replacement |
COMPLETE |
|
602539 |
BROCKTON- BRIDGE REPLACEMENT, BR# B-25-059 SPRING STREET OVER SALISBURY BROOK |
Bridge Replacement |
COMPLETE |
|
602554 |
MIDDLEBOROUGH- TRAFFIC SIGNALS, ROUTE 28 AT WOOD STREET |
Traffic Signals |
COMPLETE |
|
602555 |
TAUNTON- EXTENSION OF ACCEL/DECEL LANES ON ROUTE 24 (AMVETS MEMORIAL HIGHWAY) AT ROUTE 140 INTERCHANGE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602557 |
BROCKTON- SIGNAL & INTERSECTON IMPROVEMENTS AT ROUTE 28 (MONTELLO STREET) & ROUTE 37 (HOWARD STREET) |
Traffic Signals |
COMPLETE |
|
602559 |
ORLEANS- TRAFFIC SAFETY IMPROVEMENTS ON ROUTE 6A AT WEST ROAD AND ELDRIDGE PARK WAY (SKAKET CORNERS) |
Traffic Signals |
COMPLETE |
|
602562 |
ORLEANS- ROADWAY RECONSTRUCTION AND RELATED WORK ON SECTIONS OF MAIN STREET AND OLD COLONY WAY |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602564 |
CARVER- MIDDLEBOROUGH- BRIDGE REPLACEMENT, C-04-004=M-18-025, ROCHESTER ROAD OVER WEWEANTIC RIVER |
Bridge Replacement |
COMPLETE |
|
602586 |
HINGHAM- BRIDGE REPLACEMENT, BR# H-15-010 LEAVITT STREET OVER THE WEIR RIVER |
Bridge Replacement |
COMPLETE |
|
602591 |
PLYMOUTH- BRIDGE REPLACEMENT, BR# P-13-012 RIVER STREET OVER EEL RIVER |
Bridge Replacement |
COMPLETE |
|
602602 |
HANOVER- RECONSTRUCTION OF WASHINGTON STREET (ROUTE 53) & RELATED WORK, FROM THE ROUTE 3 (NB) RAMP TO WEBSTER STREET (ROUTE 123) |
Traffic Signals |
COMPLETE |
|
602603 |
MIDDLEBOROUGH- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 105 & ROUTE I-495 RAMPS |
Traffic Signals |
COMPLETE |
|
602605 |
RAYNHAM- SIGNAL IMPROVEMENTS @ ROUTE 138 AND ROUTE I-495 RAMPS |
Traffic Signals |
COMPLETE |
|
602606 |
BROCKTON- SIGNAL UPGRADES AT ROUTE 123 (BELMONT STREET), V.A. HOSPITAL & THE ROUTE 123/MANLEY STREET INTERSECTION |
Traffic Signals |
COMPLETE |
|
602611 |
TISBURY- CONSTRUCTION OF A CHEMICAL STORAGE BUILDING AND RELATED WORK AT THE MAINTENANCE DEPOT AT HIGHPOINT ROAD |
Chemical Storage Sheds |
COMPLETE |
|
602615 |
SEEKONK- INTERSECTION IMPROVEMENTS AT ROUTE 114A, ARCADE AVENUE & MILL ROAD, INCLUDES REHAB OF CULVERT S-08-004 OVER RUNNINS RIVER |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
602645 |
DISTRICT 5- EMERGENCY AND SCHEDULED BRIDGE DECK REPAIRS, VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
602661 |
FOXBOROUGH- TRAFFIC SAFETY IMPROVEMENTS, MECHANIC STREET AT OAK STREET |
Traffic Signals |
COMPLETE |
|
602668 |
DISTRICT 5- NON-ROUTINE MAINTENANCE AND EMERGENCY REPAIRS TO VARIOUS DRAWBRIDGES |
Drawbridge Maintenance |
COMPLETE |
|
602677 |
FREETOWN- NEW BEDFORD- WESTPORT- CLEANING AND PAINTING 3 (THREE) STEEL BRIDGES |
Painting - Structural |
COMPLETE |
|
602703 |
HINGHAM- WEYMOUTH- BRIDGE REHABILITATION, BR# H-15-002=W-32-002 ROUTE 3A (LINCOLN ST.) OVER THE WEYMOUTH BACK RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
602721 |
WALPOLE- TRAFFIC SIGNALS, ROUTE 1A (MAIN STREET) AND WINTER STREET |
Traffic Signals |
COMPLETE |
|
602757 |
DARTMOUTH- TRAFFIC SIGNALS AND GEOMETRIC IMPROVEMENTS, FAUNCE CORNER @ I-195 |
Traffic Signals |
COMPLETE |
|
602758 |
ATTLEBORO- RECONSTRUCTION OF ROUTE 152 (NORTH MAIN & SOUTH MAIN STS) FROM HOLCOTT DRIVE TO THE NORTH ATTLEBORO T.L. (PHASE I) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602759 |
ATTLEBORO- RECONSTRUCTION OF ROUTE 152, NORTH MAIN & SOUTH MAIN STREETS (PHASE II) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602765 |
DISTRICT 5- UPGRADES TO SANITARY FACILITIES AT VARIOUS MHD MAINTENANCE LOCATIONS (CONTRACT 2) |
Vertical Construction (Ch 149) |
COMPLETE |
|
602804 |
DISTRICT 5- IMPROVEMENT AND REFURBISHMENT OF SAND BARREL CRASH CUSHIONS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
602809 |
DISTRICT 5- IMPROVEMENT AND REFURBISHMENT OF HYDROCELL CRASH CUSHION SYSTEMS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
602819 |
DISTRICT 5- SOLID WASTE REMOVAL AT VARIOUS MHD FACILITIES |
Hazardous Waste Remediation |
COMPLETE |
|
602836 |
EASTON- BRIDGE REPLACEMENTS, E-06-002 & E-06-030, CENTRAL STREET OVER QUESET BROOK |
Bridge Replacement |
COMPLETE |
|
602842 |
DENNIS- HARWICH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 28 |
Resurfacing |
COMPLETE |
|
602857 |
NEW BEDFORD- RECONSTRUCTION OF ROUTE 18 (JFK HIGHWAY), FROM PINE STREET TO ELM STREET, INCLUDES CONSTRUCTION OF NEW N-06-042 & CONNECTION TO F-01-002=N-06-001 |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602869 |
MATTAPOISETT- MULTI-USE PATH CONSTRUCTION (PENN CENTRAL RIGHT OF WAY) FROM FAIRHAVEN T.L. TO MATTAPOISETT NECK ROAD (PHASE 1A) |
Bikeway/Bike Path Construction |
COMPLETE |
|
602891 |
FAIRHAVEN- RESURFACING & SIGNAL IMPROVEMENTS ON A SECTION OF ROUTE 240, FROM I-195 TO ROUTE 6 |
Resurfacing |
COMPLETE |
|
602900 |
DISTRICT 5- INSTALLATION OF REFLECTORIZED FLEXIBLE DELINEATOR POSTS ON VARIOUS STATE HIGHWAYS |
Sign Installation/Upgrading |
COMPLETE |
|
602923 |
YARMOUTH- PEDESTRIAN & SITE IMPROVEMENTS ON ROUTE 28 @ BASS RIVER TOWN PROPERTY ABUTTING BASS RIVER (PACKETT'S LANDING) |
Landscaping |
COMPLETE |
|
602938 |
REHOBOTH- RECONSTRUCTION OF A STONE WALL ALONG ROUTE 44 (WINTHROP STREET) IN FRONT OF HOUSE # 133 |
Landscaping |
COMPLETE |
|
602979 |
DISTRICT 5- UPGRADES TO SANITARY FACILITIES AT VARIOUS MHD MAINTENANCE LOCATIONS (CONTRACT #3) |
Vertical Construction (Ch 149) |
COMPLETE |
|
602988 |
MANSFIELD- CONSTRUCTION OF THE OLD COLONY MULTI-PURPOSE TRAIL. |
Bikeway/Bike Path Construction |
COMPLETE |
|
602993 |
NANTUCKET- FAIRGROUNDS ROAD BICYCLE PATH FROM INTERSECTION OF SURFSIDE ROAD TO OLD SOUTH ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
603005 |
SEEKONK- BRIDGE REPLACEMENT, S-08-011, ROUTE 114A OVER ROUTE I-195 |
Bridge Replacement |
COMPLETE |
|
603007 |
SWANSEA- BRIDGE REPLACEMENT, BR# S-35-011, ROUTE 136 OVER ROUTE I-195 |
Bridge Replacement |
COMPLETE |
|
603013 |
DISTRICT 5- CONSTRUCTION OF SOLID WASTE ACCUMULATION AREAS AT VARIOUS MHD MAINTENANCE FACILITIES |
New Construction |
COMPLETE |
|
603021 |
ROCKLAND- BRIDGE REHABILITATION, BR# R-08-004, ROUTE 3 NB and SB OVER ROUTE 228 (HINGHAM STREET) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603022 |
DISTRICT 5- INSTALLATION AND REFURBISHMENT OF RAISED PAVEMENT MARKERS IN AREA A (3 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
603027 |
DISTRICT 5- INSTALLATION AND REFURBISHMENT OF RAISED PAVEMENT MARKERS IN AREA C (3 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
603047 |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA A (3 SEPARATE CONTRACTS) |
Sewer and Water |
COMPLETE |
|
603048 |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA B (3 SEPARATE CONTRACTS) |
Sewer and Water |
COMPLETE |
|
603049 |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA C (3 SEPARATE CONTRACTS) |
Sewer and Water |
COMPLETE |
|
603062 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC OPERATIONS (4 SEPARATE CONTRACTS) |
Miscellaneous/No Prequal |
COMPLETE |
|
603129 |
DISTRICT 5- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING SYSTEMS AT VARIOUS LOCATIONS (5 SEPARATE CONTRACTS) |
Structures Maintenance |
COMPLETE |
|
603163 |
ABINGTON- TRAFFIC SIGNAL IMPROVEMENTS ON SECTIONS OF ROUTE 18 AND ROUTE 139 |
Safety Improvements |
COMPLETE |
|
603164 |
DISTRICT 5- REPAIRS TO MAINTENANCE FACILITIES DISTRICT WIDE (2 SEPARATE CONTRACTS) |
Vertical Construction (Ch 149) |
COMPLETE |
|
603171 |
DISTRICT 5- ASBESTOS ABATEMENT AND DISPOSAL AT THE DISTRICT MAINTENANCE FACILITIES DISTRICT WIDE (2 SEPARATE CONTRACTS) |
Asbestos Removal |
COMPLETE |
|
603196 |
FOXBOROUGH- MANSFIELD- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 140 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
603201 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS TO BRIDGES AT VARIOUS LOCATIONS (DISTRICT WIDE) |
Structures Maintenance |
COMPLETE |
|
603227 |
DISTRICT 5- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS IN AREA "A" |
Resurfacing |
COMPLETE |
|
603228 |
DISTRICT 5- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS IN AREA B |
Resurfacing |
COMPLETE |
|
603229 |
DISTRICT 5- COLD PLANING AND RESURFACING AT VARIOUS LOCATIONS (AREA C) |
Resurfacing |
COMPLETE |
|
603247 |
NEW BEDFORD- STRUCTURES MAINTENANCE OVER RTE I-195, BR# N-06-015 SHAWMUT AVE.; N-06-016 HIGHLAND ST.; N-06-019 MT. PLEASANT ST. |
Structures Maintenance |
COMPLETE |
|
603252 |
TAUNTON- SUPERSTRUCTURE REPLACEMENT, T-01-051, HOLLOWAY STREET OVER ROUTE 140 (NB) INCLUDES RAILING & CURB RETROFITTING ON T-01-057 |
Bridge Replacement |
COMPLETE |
|
603253 |
TAUNTON- BRIDGE REHABILITATION, BR# T-01-020, WHITTENTON STREET OVER MILL RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603284 |
NEW BEDFORD- BRIDGE REHABILITATION, BR# N-06-018 ROUTE 140 OVER HATHAWAY ROAD |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603289 |
DISTRICT 5- SCHEDULED AND EMERGENCY REPAIRS TO VARIOUS DRAWBRIDGES |
Drawbridge Maintenance |
COMPLETE |
|
603292 |
FALL RIVER- BRIDGE REHABILITATION, BR# F-02-074 ROUTE 24 OVER I-195 EASTBOUND & WESTBOUND |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603295 |
DISTRICT 5- EMERGENCY AND NON-ROUTINE STRUCTURAL REPAIRS TO VARIOUS BRIDGES |
Structures Maintenance |
COMPLETE |
|
603296 |
DISTRICT 5- RESURFACING AND RELATED WORK - AREA A |
Resurfacing |
COMPLETE |
|
603304 |
ORLEANS- CONSTRUCTION OF A BICYCLE/PEDESTRIAN BRIDGE, BR# O-04-006 CAPE COD RAIL TRAIL OVER ROCK HARBOR ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
603306 |
DISTRICT 5- GUARDRAIL REFURBISHMENT AT VARIOUS LOCATIONS (AREAS A & B) |
Guard Rail & Fencing |
COMPLETE |
|
603328 |
EDGARTOWN- OAK BLUFFS- BRIDGE REPLACEMENTS OVER SENGEKONTACKET INLET, E-07-001=O-01-002, BEACH ROAD & O-01-003 EDGARTOWN ROAD |
Bridge Replacement |
COMPLETE |
|
603333 |
TAUNTON- BRIDGE REHABILITATION, BR# T-01-052 STEVENS STREET OVER ROUTE 140 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603334 |
KINGSTON- BRIDGE DECK REPLACEMENT, BR# K-01-013 ROUTE 3A OVER ROUTE 3 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603349 |
FALMOUTH- BRIDGE REHABILITATION, F-03-005, WATER STREET OVER EEL POND |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603360 |
MARSHFIELD- NORWELL- BRIDGE REHABILITATION, M-07-001=N-24-001, UNION STREET/BRIDGE STREET OVER THE NORTH RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603364 |
FREETOWN- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 24 |
Resurfacing |
COMPLETE |
|
603376 |
FREETOWN- BRIDGE PRESERVATION, BR# F-09-011, ROUTE 24 OVER ROUTE 79 |
Structures Maintenance |
COMPLETE |
|
603377 |
TAUNTON- BRIDGE REHABILITATION, T-01-028, ROUTE 44 (WINTHROP STREET) OVER THE THREE MILE RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603378 |
HANOVER- BRIDGE REHABILITATION, H-06-011, ROUTE 53 OVER ROUTE 3 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603385 |
BRIDGEWATER- MIDDLEBOROUGH- BRIDGE REPLACEMENT, B-23-003=M-18-004, ROUTE 18 (BEDFORD STREET) OVER THE TAUNTON RIVER |
Bridge Replacement |
COMPLETE |
|
603386 |
ATTLEBORO- BRIDGE RECONSTRUCTION, A-16-032, ROUTE 1A (NEWPORT AVENUE) OVER MBTA-AMTRAK-SHORE |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603388 |
FALL RIVER- BRIDGE REHABILITATION, BR# F-02-021, CITY HALL PLAZA OVER I-195 EASTBOUND & WESTBOUND |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603393 |
DISTRICT 5- HIGHWAY LIGHTING UPGRADES AT VARIOUS LOCATIONS (3 SEPARATE CONTRACTS) |
Electrical |
COMPLETE |
|
603409 |
KINGSTON- TRAFFIC SAFETY IMPROVEMENTS ON ROUTE 3A AT EVERGREEN STREET AND POTTLE STREET |
Traffic Signals |
COMPLETE |
|
603414 |
HINGHAM- BRIDGE REHABILITATION, BR# H-15-012, DERBY STREET (ROUTE 228) OVER ROUTE 3 NB & SB |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603417 |
NORWOOD- BRIDGE REPLACEMENT, N-25-003, MORSE STREET OVER THE NEPONSET RIVER |
Bridge Replacement |
COMPLETE |
|
603427 |
BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6 FROM SANDWICH/BARNSTABLE T.L. TO BARNSTABLE/YARMOUTH T.L. (13,630 METERS) |
Resurfacing |
COMPLETE |
|
603431 |
WAREHAM- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 25 |
Resurfacing |
COMPLETE |
|
603432 |
BOURNE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 25 |
Resurfacing |
COMPLETE |
|
603444 |
DISTRICT 5- CRACK SEALING AT VARIOUS LOCATIONS IN AREA C (3 SEPARATE CONTRACTS) |
Crack Sealing |
COMPLETE |
|
603445 |
DISTRICT 5- CRACK SEALING AT VARIOUS LOCATIONS IN AREA B (3 SEPARATE CONTRACTS) |
Crack Sealing |
COMPLETE |
|
603446 |
DISTRICT 5- CRACK SEALING AT VARIOUS LOCATIONS IN AREA A (3 SEPARATE CONTRACTS) |
Crack Sealing |
COMPLETE |
|
603450 |
NEW BEDFORD- TRAFFIC SIGNS IMPROVEMENT PROJECT, ROUTE 140 FROM DUCHAINE RD. INTERCHANGE (EXIT 7) TO ROUTE 6 INTERCHANGE (EXIT 1) |
Sign Installation/Upgrading |
COMPLETE |
|
603457 |
WEST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT ROUTE 106 & ROUTE 28 (CENTRAL SQUARE) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603458 |
FAIRHAVEN- LITTLE BAY CONSERVATION AREA MULTI-USE TRAIL FROM PHOENIX BIKE PATH ADJACENT TO ARSENE ST. TO ORCHARD ST. |
Bikeway/Bike Path Construction |
COMPLETE |
|
603460 |
WEST TISBURY- INTERSECTION IMPROVEMENTS AT STATE ROAD (VINEYARD HAVEN ROAD) AND OLD COUNTY ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603461 |
WESTPORT- SIGNAL & INTERSECTION IMPROVEMENTS @ STATE ROUTE 6 AND SANFORD ROAD |
Traffic Signals |
COMPLETE |
|
603462 |
DUXBURY- INTERSECTION IMPROVEMENTS @ KINGSTOWN WAY (ROUTE 53) & WINTER STREET |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
603463 |
FALL RIVER- REGIONAL BIKEWAY CONSTRUCTION ALONG NORTH SIDE OF SOUTH WATUPPA POND FROM WESTPORT T.L. TO ROUTE 6 |
Bikeway/Bike Path Construction |
COMPLETE |
|
603468 |
PLYMOUTH- INTERSECTION IMPROVEMENTS @ ROUTE 3A, MANOMET POINT ROAD, STRAND AVENUE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
603494 |
FALMOUTH- BRIDGE REPLACEMENT, F-03-009, CHAPOQUOIT ROAD OVER WEST FALMOUTH HARBOR |
Bridge Replacement |
COMPLETE |
|
603515 |
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-011, SCOTLAND ROAD OVER TOWN RIVER |
Bridge Replacement |
COMPLETE |
|
603519 |
SWANSEA- BRIDGE REHABILITATION, BR# S-35-014, ROUTE 6 OVER ROUTE I-195 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603520 |
FALMOUTH- SHINING SEA BIKE PATH CONSTRUCTION, FROM COUNTY ROAD TO CARLSON LANE |
Bikeway/Bike Path Construction |
COMPLETE |
|
603521 |
FALMOUTH- CONSTRUCTION OF THE SHINING SEA BIKEWAY FROM SKATING LANE TO CARLSON LANE (3,500 FEET) PHASE IIB |
Bikeway/Bike Path Construction |
COMPLETE |
|
603558 |
DISTRICT 5- APPLICATION OF REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS (5 SEPARATE CONTRACTS) |
Pavement Marking |
COMPLETE |
|
603568 |
BRIDGEWATER- SIGNALIZATION & IMPROVEMENTS, ROUTE 18/28 (BEDFORD STREET) AT WINTER STREET |
Traffic Signals |
COMPLETE |
|
603569 |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA A (2 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603570 |
DISTRICT 5- DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA B (2 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603571 |
DISTRICT 5- EMERGENCY DRAINAGE IMPROVEMENTS IN AREA C (3 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603572 |
DISTRICT 5- REPLACEMENT AND REFURBISHMENT OF CRASH CUSHIONS AT VARIOUS LOCATIONS (HYDROCELL, G.R.E.A.T. & HEX-FOAM & ADIEM-II) |
Impact Attenuators |
COMPLETE |
|
603576 |
TAUNTON- BRIDGE REPLACEMENT, T-01-021, BAY STREET OVER THE MILL RIVER & REPLACEMENT OF DAM MA00923 |
Bridge Replacement |
COMPLETE |
|
603595 |
ATTLEBORO- BRIDGE PRESERVATION, A-16-042, I-95 (NB & SB) OVER WASHINGTON ST (US 1); BR# A-16-043, I-95 NB & SB OVER NEWPORT AVE (RTE 1A); BR# A-16-061 I-295 NB & SB OVER I-95. |
Structures Maintenance |
COMPLETE |
|
603609 |
FALMOUTH- RECONSTRUCTION OF ROUTE 28 AT REINE'S CORNER |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603616 |
NEW BEDFORD- SIGNALIZATION & IMPROVEMENTS, KING'S HIGHWAY AND MOUNT PLEASANT STREET |
Traffic Signals |
COMPLETE |
|
603617 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS TO VARIOUS BRIDGES |
Structures Maintenance |
COMPLETE |
|
603619 |
DIGHTON- TAUNTON- BRIDGE REPLACEMENT, D-08-013=T-01-025, OLD SOMERSET AVENUE OVER THE THREE MILE RIVER |
Bridge Replacement |
COMPLETE |
|
603622 |
SHARON- BRIDGE REHABILITATIONS, BR# S-09-011, S-09-010, S-09-009, ROUTE 1/ROUTE I-95 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603627 |
DARTMOUTH- BRIDGE REPLACEMENT, BR# D-04-001 LITTLE RIVER ROAD OVER THE LITTLE RIVER |
Bridge Replacement |
COMPLETE |
|
603634 |
DISTRICT 5- SOLID WASTE REMOVAL AT VARIOUS MHD FACILITIES (5 SEPARATE CONTRACTS) |
Process/Recycle/Trnsprt Soils |
COMPLETE |
|
603649 |
DISTRICT 5- IMPROVEMENT AND REFURBISHMENT OF SAND BARREL CRASH CUSHIONS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
603657 |
DARTMOUTH- INTERSECTION IMPROVEMENTS, ROUTE 6 @ BRANDT AVENUE |
Traffic Signals |
COMPLETE |
|
603660 |
BRIDGEWATER- TRAFFIC SIGNAL & INTERSECTION IMPROVEMENTS AT BROAD STREET (ROUTE 18) AND HIGH STREET |
Traffic Signals |
COMPLETE |
|
603666 |
ORLEANS- INTERSECTION IMPROVEMENTS, ROUTE 28 AT FINLAY ROAD |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
603670 |
BOURNE- WAREHAM- BRIDGE REPLACEMENT, B-17-017=W-06-012, US ROUTE 6 & STATE ROUTE 28 (CRANBERRY HIGHWAY) OVER COHASSET NARROWS |
Bridge Replacement |
COMPLETE |
|
603675 |
BROCKTON- DOWNTOWN ROADWAY AND STREETSCAPE IMPROVEMENTS (PHASE I) |
New Construction |
COMPLETE |
|
603681 |
NORTH ATTLEBOROUGH- BRIDGE REPLACEMENT, BR# N-16-008, HUNTS BRIDGE ROAD OVER ABBOTT RUN |
Bridge Replacement |
COMPLETE |
|
603683 |
DISTRICT 5- CLEANING DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (CB-53-1A) (5 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603684 |
DISTRICT 5- CLEANING DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (CB-53-2A) (5 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603685 |
DISTRICT 5- CLEANING DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (CB-53-3A) (5 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603686 |
DISTRICT 5- CLEANING DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (CB-53-1B) (5 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603687 |
DISTRICT 5- CLEANING DRAINAGE STRUCTURES AT VARIOUS LOCATIONS (CB-53-2B) (5 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603690 |
CHATHAM- BRIDGE REPLACEMENT, C-07-001, BRIDGE STREET OVER THE MITCHELL RIVER |
Bridge Replacement |
COMPLETE |
|
603699 |
DISTRICT 5- SCHEDULED AND EMERGENCY REPAIRS TO ABUTMENTS, PIER CAPS, COLUMNS AND RELATED WORK |
Structures Maintenance |
COMPLETE |
|
603733 |
DARTMOUTH- NEW BEDFORD- RESURFACING AND RELATED WORK ON ROUTE I-195 |
Resurfacing |
COMPLETE |
|
603767 |
ATTLEBORO- CONSTRUCTION OF RELOCATED TIFFANY STREET |
Highway Relocation |
COMPLETE |
|
603779 |
DISTRICT 5- HIGHWAY LIGHTING MAINTENANCE AND UPGRADES AT VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
603780 |
DISTRICT 5- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
603782 |
DISTRICT 5- CHAIN LINK FENCE BETTERMENTS |
Guard Rail & Fencing |
COMPLETE |
|
603791 |
DISTRICT 5- SELECTIVE CLEARING AND TREE REMOVAL ALONG VARIOUS STATE HIGHWAYS |
Landscaping |
COMPLETE |
|
603802 |
DISTRICT 5- SCHEDULED AND EMERGENCY REPAIRS TO DRAWBRIDGE AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
603812 |
DISTRICT 5- COLD PLANING AND RESURFACING AT VARIOUS LOCATIONS IN AREA B |
Resurfacing |
COMPLETE |
|
603813 |
EASTHAM- ORLEANS- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing |
COMPLETE |
|
603825 |
NORWOOD- SHARON- WALPOLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 1 |
Resurfacing |
COMPLETE |
|
603826 |
DUXBURY- MARSHFIELD- COLD PLANING & RESURFACING ON A SECTION OF ROUTE 3A |
Resurfacing |
COMPLETE |
|
603829 |
DISTRICT 5- FENCE BETTERMENT AT VARIOUS LOCATIONS
|
Guard Rail & Fencing |
COMPLETE |
|
603830 |
DISTRICT 5- HAZARDOUS TREE MITIGATION ALONG STATE HIGHWAYS (DISTRICT WIDE) |
Landscaping |
COMPLETE |
|
603831 |
DISTRICT 5- GUARDRAIL BETTERMENT AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
603833 |
BRAINTREE TO PLYMOUTH- TRAFFIC SIGNS IMPROVEMENT PROJECT ON ROUTE 3 |
Sign Installation/Upgrading |
COMPLETE |
|
603845 |
SANDWICH- YARMOUTH- RESURFACING AND RELATED WORK ON ROUTE 6A |
Resurfacing |
COMPLETE |
|
603846 |
CARVER- MIDDLEBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 44 |
Resurfacing |
COMPLETE |
|
603847 |
BOURNE- SAGAMORE ROTARY GRADE SEPARATION PROJECT |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
603848 |
BOURNE- DEMOLITION OF CANAL SIDE HOTEL ON CHURCH LANE (AS PART OF THE SAGAMORE ROTARY PROJECT) |
Demolition |
COMPLETE |
|
603851 |
DISTRICT 5- REPAIR AND INSTALLATION OF DRAINAGE STRUCTURES (AREA A - 4 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603852 |
DISTRICT 5- REPAIR AND INSTALLATION OF DRAINAGE STRUCTURES (AREA B - 4 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603853 |
DISTRICT 5- REPAIR AND INSTALLATION OF DRAINAGE STRUCTURES (AREA C - 4 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
603891 |
MIDDLEBOROUGH- INTERSECTION IMPROVEMENTS, ROUTE 28 AND ROUTE 105 |
Traffic Signals |
COMPLETE |
|
603893 |
DARTMOUTH- PADANARAM BRIDGE CAUSEWAY RECONSTRUCTION, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603894 |
BOURNE- MEDIAN INSTALLATION & IMPROVEMENTS ON ROUTE 6 (SCENIC HIGHWAY) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603902 |
DISTRICT 5- INSTALLATION OF SIGNS ON VARIOUS STATE HIGHWAYS (4 SEPARATE CONTRACTS) |
Sign Installation/Upgrading |
COMPLETE |
|
603954 |
DISTRICT 5- INSTALLATION OF POST-INTERCHANGE DISTANCE SIGNING (4 CONTRACTS) |
Structural Signing |
COMPLETE |
|
603966 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS (THERMOPLASTIC) AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
603983 |
ATTLEBORO- BRIDGE REHABILITATION, A-16-018, NORTH MAIN STREET OVER BUNGAY RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603997 |
DISTRICT 5- REPAIRS TO ASPHALT AND CONCRETE PAVEMENTS AT VARIOUS LOCATIONS (AREAS A & B) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
603998 |
DISTRICT 5- REPAIRS TO ASPHALT AND CONCRETE PAVEMENTS AT VARIOUS LOCATIONS (AREAS A & B) |
Resurfacing |
COMPLETE |
|
604015 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS (AREAS C & D)
|
Resurfacing |
COMPLETE |
|
604016 |
DISTRICT 5- REPAIRS TO ASPHALT AND CONCRETE PAVEMENTS AT VARIOUS LOCATIONS (AREAS C & D) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604029 |
OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT, O-01-001=T-04-001, BEACH ROAD OVER LAGOON POND DRAWBRIDGE |
Bridge Replacement |
COMPLETE |
|
604057 |
DISTRICT 5- RUMBLE STRIP APPLICATION ALONG ROADWAY EDGE LINES (4 CONTRACTS) |
Contract Highway Maintenance |
COMPLETE |
|
604070 |
FREETOWN- NEW BEDFORD- COLD PLANING AND RESURFACING, ROUTE 140 |
Resurfacing |
COMPLETE |
|
604071 |
NEW BEDFORD- COLD PLANING AND RESURFACING, ROUTE 140 |
Resurfacing |
COMPLETE |
|
604078 |
MANSFIELD- RECONSTRUCTION OF ROUTE 106 (CHAUNCY STREET) INCLUDES RAILROAD BRIDGE M-03-019 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604081 |
DISTRICT 5- CATCH BASIN CLEANING (AREA A) 3 SEPARATE CONTRACTS |
Catch Basin Cleaning |
COMPLETE |
|
604082 |
DISTRICT 5- CATCH BASIN CLEANING (AREA B) 3 SEPARATE CONTRACTS |
Catch Basin Cleaning |
COMPLETE |
|
604083 |
DISTRICT 5- CATCH BASIN CLEANING (AREAS C & D) WAREHAM DEPOT ONLY |
Catch Basin Cleaning |
COMPLETE |
|
604089 |
TISBURY- RESURFACING AND RELATED WORK ON FRANKLIN STREET |
Resurfacing |
COMPLETE |
|
604091 |
DENNIS- RECONSTRUCTION OF SWAN RIVER ROAD, ROUTE 134 TO LOWER COUNTY ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604092 |
MANSFIELD- SLIP RAMP CONSTRUCTION, FROM ROUTE 140 TO I-495 (SB) |
New Construction |
COMPLETE |
|
604093 |
BARNSTABLE- ROUNDABOUT CONSTRUCTION AT INTERSECTION OF ROUTE 149 & ROUTE 6 (EB) EXIT RAMP |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604094 |
NANTUCKET- INTERSECTION IMPROVEMENTS AT SPARKS AVENUE AND HOOPER FARM ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604095 |
NANTUCKET- BIKE PATH CONSTRUCTION ON BARTLETT ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
604096 |
BARNSTABLE- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 28 @ 3 LOCATIONS: LUMBERT MILLS ROAD, SOUTH COUNTY ROAD AND ROUTE 149 |
Traffic Signals |
COMPLETE |
|
604130 |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS |
Structures Maintenance |
COMPLETE |
|
604137 |
BOURNE- PLYMOUTH- WAREHAM- TRAFFIC SIGN REPLACEMENT AND SAFETY IMPROVEMENTS, ROUTE 25 |
Sign Installation/Upgrading |
COMPLETE |
|
604138 |
ATTLEBORO- NORTH ATTLEBOROUGH- TRAFFIC SIGN REPLACEMENT AND SAFETY IMPROVEMENTS, I-295 |
Sign Installation/Upgrading |
COMPLETE |
|
604142 |
BOURNE- SAGAMORE FIRE STATION REPLACEMENT |
Vertical Construction (Ch 149) |
COMPLETE |
|
604146 |
DISTRICT 5- GUARDRAIL END UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
604148 |
BOURNE- MAINTENANCE DEPOT CONSTRUCTION (PART OF THE SAGAMORE ROTARY PROJECT) |
Vertical Construction (Ch 149) |
COMPLETE |
|
604158 |
DISTRICT 5- FACILITIES MAINTENANCE |
Structures Maintenance |
COMPLETE |
|
604160 |
WHITMAN- COLD PLANING AND RESURFACING ON ROUTE 18 |
Resurfacing |
COMPLETE |
|
604176 |
DISTRICT 5- REFURBISHMENT OF CRASH CUSHION DEVICES (HYDROCELLS) AT STATE HIGHWAY LOCATIONS |
Impact Attenuators |
COMPLETE |
|
604177 |
DISTRICT 5- IMPROVEMENT & REFURBISHMENT OF SAND BARREL CRASH CUSHIONS AND SAFETY SIGNING SIGNS AND SUPPORTS |
Impact Attenuators |
COMPLETE |
|
604180 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO DRAWBRIDGES AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
604223 |
BOURNE- PLYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing |
COMPLETE |
|
604224 |
BOURNE- COLD PLANING AND RESURFACING ON ROUTE 6 (SCENIC HIGHWAY) |
Resurfacing |
COMPLETE |
|
604250 |
DISTRICT 5- FABRICATION AND INSTALLATION OF SIGNS AND SUPPORTS |
Sign Installation/Upgrading |
COMPLETE |
|
604258 |
DISTRICT 5- CHEMICAL STORAGE SALT SHED REPAIRS AT VARIOUS LOCATIONS |
Chemical Storage Sheds |
COMPLETE |
|
604275 |
BOURNE- SAGAMORE ROTARY LANDSCAPING CONTRACT |
Landscaping |
COMPLETE |
|
604286 |
NANTUCKET- BIKE PATH CONSTRUCTION ON CLIFF ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
604293 |
NEW BEDFORD- RECONSTRUCTION OF HAWTHORNE STREET CORRIDOR (HISTORIC STREET) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604301 |
MIDDLEBOROUGH- RAYNHAM- RESURFACING AND RELATED WORK ON A SECTION OF INTERSTATE 495 |
Resurfacing |
COMPLETE |
|
604302 |
SOMERSET- SWANSEA- INTERSTATE RESURFACING ON I-195 |
Resurfacing |
COMPLETE |
|
604303 |
WAREHAM- INTERSTATE MAINTENANCE & RELATED WORK ON I-195, I-495 & ROUTE 25 RAMPS |
Resurfacing |
COMPLETE |
|
604309 |
MARION- MATTAPOISETT- INTERSTATE MAINTENANCE & RELATED WORK ON I-195 |
Resurfacing |
COMPLETE |
|
604310 |
ATTLEBORO- INTERSTATE RESURFACING ON I-95 |
Resurfacing |
COMPLETE |
|
604314 |
WESTPORT- RESURFACING & RELATED WORK ON ROUTE 6 |
Resurfacing |
COMPLETE |
|
604315 |
DISTRICT 5- COLD PLANING AND RESURFACING AT VARIOUS LOCATIONS (AREA D) |
Resurfacing |
COMPLETE |
|
604319 |
DISTRICT 5- SIDEWALK REPAIR AT VARIOUS LOCATIONS IN AREA A |
Landscaping |
COMPLETE |
|
604320 |
DISTRICT 5- SIDEWALK REPAIR AT VARIOUS LOCATIONS IN AREA B |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604321 |
DISTRICT 5- SIDEWALK REPAIR AT VARIOUS LOCATIONS IN AREA C |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604322 |
DISTRICT 5- SIDEWALK REPAIR AT VARIOUS LOCATIONS IN AREA D |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604329 |
FAIRHAVEN- NEW BEDFORD- BRIDGE PRESERVATION, F-01-002=N-06-001 (EAST & WEST BRIDGES) ROUTE 6 OVER ACUSHNET RIVER & N-06-025, HATHAWAY ROAD OVER ROUTE I-195 |
Structures Maintenance |
COMPLETE |
|
604335 |
SANDWICH- RECONSTRUCTION OF ROUTE 130, WATER STREET @ MAIN STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604368 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO ABUTMENTS, PIER CAPS, COLUMNS AND OTHER RELATED WORK |
Structures Maintenance |
COMPLETE |
|
604386 |
DISTRICT 5- EMERGENCY AND NON-ROUTINE STRUCTURAL REPAIRS TO VARIOUS BRIDGES |
Structures Maintenance |
COMPLETE |
|
604387 |
DISTRICT 5- FACILITIES MAINTENANCE |
Vertical Construction (Ch 149) |
COMPLETE |
|
604390 |
SEEKONK- INTERSECTION & SIGNAL IMPROVEMENTS ON CENTRAL AVENUE (ROUTE 152) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604391 |
HINGHAM- RECONSTRUCTION & IMPROVEMENTS ON ROUTE 228, FROM QUEEN ANNE'S CORNER (ROUTE 53) TO MERRYMOUNT ROAD (PHASE II) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604394 |
DISTRICT 5- REPAIR AND INSTALLATION OF DRAINAGE STRUCTURES (AREA D - 4 SEPARATE CONTRACTS) |
Catch Basin Cleaning |
COMPLETE |
|
604399 |
DISTRICT 5- HERBICIDE APPLICATION AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
604415 |
BRIDGEWATER- MIDDLEBOROUGH- BRIDGE REPLACEMENT, B-23-005=M-18-002, SUMMER STREET OVER THE TAUNTON RIVER |
Bridge Replacement |
COMPLETE |
|
604419 |
BROCKTON- BRIDGE REPLACEMENT, B-25-032, WHITE AVENUE OVER SALISBURY BROOK |
Bridge Replacement |
COMPLETE |
|
604431 |
BROCKTON- RECONSTRUCTION OF ROUTE 27, PLEASANT STREET AT WEST STREET AND WESTGATE MALL DRIVE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
604456 |
BOURNE- VISITOR CENTER CONSTRUCTION (PART OF THE SAGAMORE ROTARY PROJECT) |
Vertical Construction (Ch 149) |
COMPLETE |
|
604477 |
DISTRICT 5- COLD PLANING & RESURFACING ON LIMITED ACCESS HIGHWAYS AT VARIOUS LOCATIONS (AREA B) |
Resurfacing |
COMPLETE |
|
604478 |
DISTRICT 5- COLD PLANING AND RESURFACING AT VARIOUS LOCATIONS (AREA A) |
Resurfacing |
COMPLETE |
|
604479 |
DISTRICT 5- COLD PLANING AND RESURFACING ON LIMITED ACCESS HIGHWAYS AT VARIOUS LOCATIONS (AREA C) |
Resurfacing |
COMPLETE |
|
604481 |
MANSFIELD- BRIDGE BETTERMENT, M-03-031 & M-03-033, ROUTE 140 (S. MAIN STREET) I-495 NB & SB |
Structures Maintenance |
COMPLETE |
|
604483 |
HANOVER- HANSON- BRIDGE REPLACEMENT, H-06-003=H-07-003, BROADWAY OVER INDIAN HEAD RIVER |
Bridge Replacement |
COMPLETE |
|
604488 |
DENNIS- YARMOUTH- CAPE COD RAIL TRAIL EXTENSION, INCLUDES REPLACING D-07-015, CCRT OVER ROUTE 134 & Y-01-009, CCRT OVER STATION AVENUE |
Bikeway/Bike Path Construction |
COMPLETE |
|
604489 |
MARSHFIELD- SCITUATE- BRIDGE REPLACEMENTS, BR# M-07-019=S-07-014, JULIEN STREET OVER THE SOUTH RIVER AND BR# M-07-003=S-07-003, SEA STREET OVER THE SOUTH RIVER (CAPT. FRED. STANLEY BRIDGE) |
Bridge Replacement |
COMPLETE |
|
604490 |
DISTRICT 5- FENCE UPGRADES AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
604495 |
DISTRICT 5- SCHEDULED AND EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
604510 |
ROCKLAND- WEYMOUTH- RECONSTRUCTION OF EAST & WEST PARKWAY (DESIGN-BUILD) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604521 |
BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6A |
Resurfacing |
COMPLETE |
|
604544 |
BARNSTABLE- PEDESTRIAN LIGHTING UPGRADES, CAPE COD GATEWAY (MAIN STREET HYANNIS) |
Electrical |
COMPLETE |
|
604571 |
FALL RIVER- FREETOWN- INTERCHANGE CONSTRUCTION ON ROUTE 24 (DESIGN-BUILD) |
New Construction |
COMPLETE |
|
604574 |
ATTLEBORO- NORTH ATTLEBOROUGH- RESURFACING RTE. I-295, FROM RI STATE LINE TO RTE. I-95 |
Resurfacing |
COMPLETE |
|
604575 |
FALL RIVER- INTERSTATE MAINTENANCE & RELATED WORK ON I-195, FROM ROUTE 24 TO THE BRAGA BRIDGE |
Resurfacing |
COMPLETE |
|
604576 |
ATTLEBORO- NORTH ATTLEBOROUGH- MANSFIELD- FOXBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
604589 |
NORTON- BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE CANOE RIVER |
Bridge Replacement |
COMPLETE |
|
604590 |
OAK BLUFFS- RESURFACING & RELATED WORK, BEACH ROAD, EASTVILLE AVENUE, TEMAHIGAN AVENUE, NEW YORK AVENUE |
Resurfacing |
COMPLETE |
|
604595 |
BROCKTON- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 27, BELAIR STREET AND MORAINE STREET |
Traffic Signals |
COMPLETE |
|
604608 |
BERKLEY- FREETOWN- LAKEVILLE- TAUNTON- TRAFFIC & GUIDE SIGN REPLACEMENT ON STATE ROUTE 140 |
Sign Installation/Upgrading |
COMPLETE |
|
604642 |
BERKLEY- BRIDGE REPLACEMENT, B-08-003, PADELFORD STREET OVER STATE ROUTE 24 (DESIGN-BUILD) |
Bridge Replacement |
COMPLETE |
|
604655 |
MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER |
Bridge Replacement |
COMPLETE |
|
604658 |
EASTON- RECONSTRUCTION & IMPROVEMENTS AT ROUTE 106 AND ROUTE 123 (FIVE CORNERS) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
604666 |
DISTRICT 5- TAUNTON LAB RETROFIT |
Vertical Construction (Ch 149) |
COMPLETE |
|
604674 |
NANTUCKET- RESURFACING AND RELATED WORK ON MILESTONE ROAD |
Resurfacing |
COMPLETE |
|
604684 |
DENNIS- BRIDGE BETTERMENT, BR# D-07-009, ROUTE 134 OVER ROUTE 6 |
Structures Maintenance |
COMPLETE |
|
604703 |
FALL RIVER- BRIDGE BETTERMENT, F-02-041, HIGHLAND AVENUE OVER ROUTE 24 (SB) |
Structures Maintenance |
COMPLETE |
|
604704 |
MIDDLEBOROUGH- RAYNHAM- BRIDGE BETTERMENT, M-18-041=R-02-017, I-495 (NB) OVER THE TAUNTON RIVER |
Structures Maintenance |
COMPLETE |
|
604713 |
DISTRICT 5- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
604723 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS |
Pavement Marking |
COMPLETE |
|
604724 |
HANOVER- NORTON- PLYMOUTH- SEPTIC UPGRADES AT ROUTE 53, ROUTE 123, OBERY STREET FACILITIES |
Sewer and Water |
COMPLETE |
|
604734 |
DISTRICT 4- DISTRICT 5- INSTALLATION OF ADVISORY TRAFFIC SIGNS, CHANGEABLE MESSAGE SIGNS (CMS) & SUPPORTS AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
604741 |
BROCKTON- SIGNAL & INTERSECTION IMPROVEMENTS AT MAIN STREET (ROUTE 28) & PLAIN STREET/KEITH AVENUE |
Traffic Signals |
COMPLETE |
|
604743 |
COHASSET- HINGHAM- HULL- CULVERT REPLACEMENT, C-17-004, ROUTE 228 OVER STRAITS CHANNEL |
Bridge Replacement |
COMPLETE |
|
604744 |
SANDWICH- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS AT ROUTE 130 RAMPS & ROUTE 6 |
Traffic Signals |
COMPLETE |
|
604747 |
BROCKTON- BRIDGE BETTERMENT, B-25-048, ROUTE 123 (BELMONT STREET) OVER ROUTE 24 |
Structures Maintenance |
COMPLETE |
|
604754 |
DISTRICT 5- HERBICIDE APPLICATION AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
604792 |
DISTRICT 5- CATCH BASIN CLEANING (AREA A) |
Catch Basin Cleaning |
COMPLETE |
|
604793 |
DISTRICT 5- CATCH BASIN CLEANING (AREA B) |
Catch Basin Cleaning |
COMPLETE |
|
604794 |
DISTRICT 5- CATCH BASIN CLEANING (AREA C & D - WAREHAM DEPOT) |
Catch Basin Cleaning |
COMPLETE |
|
604798 |
DISTRICT 5- DRAINAGE REPAIR AND INSTALLATION AT VARIOUS LOCATIONS (AREA D) |
Catch Basin Cleaning |
COMPLETE |
|
604799 |
DISTRICT 5- DRAINAGE REPAIR AND INSTALLATION AT VARIOUS LOCATIONS (AREAS A, B, & C) |
Contract Highway Maintenance |
COMPLETE |
|
604800 |
DISTRICT 5- DRAINAGE REPAIR AND INSTALLATION AT VARIOUS LOCATIONS (AREA D) |
Contract Highway Maintenance |
COMPLETE |
|
604801 |
DISTRICT 5- DRAINAGE REPAIR AND INSTALLATION AT VARIOUS LOCATIONS (AREA A) |
Catch Basin Cleaning |
COMPLETE |
|
604808 |
MIDDLEBORO- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 44 @ 4 LOCATIONS: AT CENTER ST, AT EVERETT ST, AT PLYMOUTH ST, AT PLYMPTON ST |
Traffic Signals |
COMPLETE |
|
604813 |
OAK BLUFFS- INTERSECTION IMPROVEMENTS AT EDGARTOWN-VINEYARD HAVEN ROAD & BARNES ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604814 |
WEST BRIDGEWATER- PARK & RIDE UPGRADE AT ROUTE 106, WEST CENTER STREET & PLEASANT STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604817 |
OAK BLUFFS- RESURFACING OF LAKE AVENUE AND OAK BLUFFS AVENUE |
Resurfacing |
COMPLETE |
|
604828 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO ABUTMENTS, PIER CAPS AND COLUMNS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
604829 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
604834 |
DISTRICT 5- HIGHWAY LIGHTING MAINTENANCE & UPGRADES |
Electrical |
COMPLETE |
|
604835 |
DISTRICT 5- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT |
Contract Highway Maintenance |
COMPLETE |
|
604844 |
NANTUCKET- BIKE & PEDESTRIAN PATH CONSTRUCTION ON NOBADEER FARM ROAD |
Bikeway/Bike Path Construction |
COMPLETE |
|
604868 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREA D) |
Resurfacing |
COMPLETE |
|
604869 |
RAYNHAM- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 138 |
Resurfacing |
COMPLETE |
|
604870 |
PEMBROKE- MARSHFIELD- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS ON ROUTES 139 |
Resurfacing |
COMPLETE |
|
604906 |
DISTRICT 5- FABRICATION & INSTALLATION OF SIGNS AND SUPPORTS |
Sign Installation/Upgrading |
COMPLETE |
|
604914 |
BARNSTABLE- LANDSCAPING & IMPROVEMENTS ON ROUTE 132, FROM ROUTE 6 TO BEARSE'S WAY |
Landscaping |
COMPLETE |
|
604915 |
MARSHFIELD-PEMBROKE - CORRIDOR IMPROVEMENTS ON ROUTE 139 (PLAIN STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
604916 |
NORWOOD- INTERSECTION & SIGNAL IMPROVEMENTS AT PLEASANT STREET AND MORSE STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604918 |
HARWICH- RECONSTRUCTION OF ROUTE 137, FROM QUEEN ANNE ROAD TO THE BREWSTER T.L. |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
604919 |
HARWICH- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 124 AND QUEEN ANNE ROAD |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
604926 |
NEW BEDFORD- BRIDGE PRESERVATION, N-06-014, I-195 OVER ROUTE 140 |
Structures Maintenance |
COMPLETE |
|
604940 |
BERKLEY- DIGHTON- BRIDGE REPLACEMENT (TEMP) B-08-001=D-08-011, ELM STREET OVER THE TAUNTON RIVER |
New Bridge |
COMPLETE |
|
604943 |
DISTRICT 5- DUMPING GROUND CLOSURES AT VARIOUS LOCATIONS IN DARTMOUTH, FREETOWN & WAREHAM |
Hazardous Waste Remediation |
COMPLETE |
|
604957 |
PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
604958 |
BRIDGEWATER- RECONSTRUCTION OF NORTH STREET, FROM PLEASANT STREET (ROUTE 104) TO VILLAGE GATE DRIVE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605015 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605037 |
DENNIS- SIGNAL & INTERSECTION IMPROVEMENTS ON ROUTE 28 AT ROUTE 134 & SWAN RIVER ROAD |
Traffic Signals |
COMPLETE |
|
605038 |
PLYMOUTH- RECONSTRUCTION OF TAYLOR AVENUE, FROM WHITE HORSE ROAD TO MANOMET POINT ROAD, INCLUDES BRIDGE REPLACEMENT OF P-13-010 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
605046 |
DISTRICT 5- SIDEWALK CONSTRUCTION & RECONSTRUCTION AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
605069 |
FALL RIVER- RECONSTRUCTION & TRAFFIC SIGNAL IMPROVEMENTS ON PLYMOUTH AVENUE, FROM WORDELL STREET TO RHODE ISLAND AVENUE AT SLADE STREET/LAUREL STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
605071 |
NEW BEDFORD- RECONSTRUCTION OF MILL STREET, FROM PLEASANT STREET TO KEMPTON STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
605098 |
FALL RIVER- BRIDGE BETTERMENT, F-02-045, ROUTE 24 (NB & SB) OVER BEDFORD STREET |
Structures Maintenance |
COMPLETE |
|
605099 |
FALL RIVER- SOMERSET- BRIDGE PRESERVATION, F-02-058, I-195 OVER THE COMB SR 79 & TAUNTON RIVER (BRAGA BRIDGE) |
Structures Maintenance |
COMPLETE |
|
605101 |
HANOVER- BRIDGE REPLACEMENT, H-06-011, ROUTE 53 (WASHINGTON STREET) OVER ROUTE 3 INCLUDING SIGNAL & INTERSECTION IMPROVEMENTS AT NORTHBOUND RAMPS |
Bridge Replacement |
COMPLETE |
|
605113 |
SWANSEA- RESURFACING & RELATED WORK ON ROUTE 6 |
Resurfacing |
COMPLETE |
|
605116 |
DISTRICT 5- SCHEDULED & EMERGENCY TRAFFIC OPERATIONS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
605117 |
DISTRICT 5- CRACK SEALING & PAVEMENT REPAIRS AT VARIOUS LOCATIONS (AREAS A, B & C) |
Crack Sealing |
COMPLETE |
|
605120 |
DISTRICT 5- CRACK SEALING & PAVEMENT REPAIRS AT VARIOUS LOCATIONS (AREA D) |
Crack Sealing |
COMPLETE |
|
605130 |
DISTRICT 5- INSTALLATION OF ENHANCED REFERENCE LOCATION SIGNS AT VARIOUS LOCATIONS (4 CONTRACTS) |
Sign Installation/Upgrading |
COMPLETE |
|
605132 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK JOINT REPAIRS & RELATED WORK AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605133 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605141 |
ATTLEBORO- RECONSTRUCTION & GEOMETRIC IMPROVEMENTS ON TIFFANY STREET, FROM ROUTE 123 TO NEW ROAD (PHASE II), INCLUDES CULVERT RECONSTRUCTION OF A-16-077 |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605145 |
FREETOWN- BRIDGE REHABILITATION, F-09-003, ELM STREET OVER THE ASSONET RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605160 |
DISTRICT 5- GROUND WATER INTERCEPTOR CONSTRUCTION (COHASSET DEPOT) |
Sewer and Water |
COMPLETE |
|
605167 |
TAUNTON- RESURFACING & RELATED WORK ON ROUTE 44 FROM ARLINGTON STREET TO ROUTE 104 |
Resurfacing |
COMPLETE |
|
605171 |
FREETOWN- LAKEVILLE- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 140 |
Resurfacing |
COMPLETE |
|
605187 |
WALPOLE- SIDEWALK RECONSTRUCTION & RELATED WORK ON WASHINGTON STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
605194 |
WAREHAM- RESURFACING & RELATED WORK ON ROUTE 6 & 28 |
Resurfacing |
COMPLETE |
|
605195 |
DISTRICT 5- REFURBISHMENT & REPLACEMENT OF CRASH CUSHIONS (SAND BARRELS) |
Impact Attenuators |
COMPLETE |
|
605196 |
DISTRICT 5- REFURBISHMENT AND REPLACEMENT OF CRASH CUSHIONS (ATTENUATORS) |
Impact Attenuators |
COMPLETE |
|
605197 |
DISTRICT 5- UPGRADES AND REPAIRS TO TRAFFIC SIGNAL SYSTEMS |
Traffic Signals |
COMPLETE |
|
605214 |
DENNIS- COLD PLANING & RESURFACING ON ROUTE 6A |
Resurfacing |
COMPLETE |
|
605218 |
NORTH ATTLEBOROUGH- WRENTHAM- NORFOLK- WALPOLE- NORWOOD- RESURFACING & RELATED WORK ON ROUTE 1A |
Resurfacing |
COMPLETE |
|
605220 |
DISTRICT 5- TREE REMOVAL IN AREAS A, B & C |
Contract Highway Maintenance |
COMPLETE |
|
605223 |
FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605235 |
DISTRICT 5- FACILITIES MAINTENANCE & REPAIR |
Structures Maintenance |
COMPLETE |
|
605238 |
AVON- STOUGHTON- RESURFACING & RELATED WORK ON ROUTE 24 |
Resurfacing |
COMPLETE |
|
605242 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS |
Pavement Marking |
COMPLETE |
|
605243 |
YARMOUTH- INTERSECTION IMPROVEMENTS AT OLD TOWN HOUSE ROAD AND FOREST ROAD |
Traffic Signals |
COMPLETE |
|
605263 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605272 |
BARNSTABLE- BRIDGE PRESERVATION, B-01-019, ROUTE 6 OVER IYANQUGH ROAD (ROUTE 132) |
Structures Maintenance |
COMPLETE |
|
605291 |
DENNIS- BRIDGE REPLACEMENTS, D-07-001 & D-07-006, UPPER COUNTY ROAD & MAIN STREET (SR 28) OVER SWAN POND RIVER |
Bridge Replacement |
COMPLETE |
|
605327 |
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-012=T-01-049 (3MR), SR 24 OVER THE TAUNTON RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605343 |
SWANSEA- SUPERSTRUCTURE REPLACEMENT, S-35-018, I-195 (EB/WB) OVER THE COLE RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605344 |
TAUNTON- BRIDGE REPLACEMENT, T-01-015, WASHINGTON STREET (SR 140) OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
605351 |
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-012, ROUTE 106 (WEST CENTER STREET) OVER THE HOCKOMOCK RIVER |
Bridge Replacement |
COMPLETE |
|
605361 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO SUBSTRUCTURES AT VARIOUS LOCATIONS ON ROUTE 24 CORRIDOR |
Structures Maintenance |
COMPLETE |
|
605362 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605365 |
NEW BEDFORD- INTERSECTION IMPROVEMENTS AT ROUTE 140/ROUTE 6 (KEMPTON STREET) AND BROWNELL AVENUE |
Traffic Signals |
COMPLETE |
|
605366 |
FAIRHAVEN- INTERSECTION & SIGNAL IMPROVEMENTS @ ALDEN ROAD & BRIDGE STREET |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
605367 |
TAUNTON- INTERSECTION IMPROVEMENTS AT THE HON. GORDON M. OWEN RIVERWAY & WILLIAMS STREET |
Traffic Signals |
COMPLETE |
|
605368 |
NORTH ATTLEBOROUGH- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120) |
Traffic Signals |
COMPLETE |
|
605371 |
FAIRHAVEN- SIGNAL & INTERSECTION IMPROVEMENTS ON HUTTLESTON AVENUE (ROUTE 6) AT 4 LOCATIONS: MIDDLE STREET, MAIN STREET, GREEN STREET & ADAMS STREET |
Traffic Signals |
COMPLETE |
|
605372 |
NORTH ATTLEBOROUGH- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS @ EAST WASHINGTON STREET (ROUTE 1) & CHESTNUT STREET |
Traffic Signals |
COMPLETE |
|
605373 |
DISTRICT 5- TREE TRIMMING IN AREAS A, B & C |
Contract Highway Maintenance |
COMPLETE |
|
605374 |
DISTRICT 5- TREE REMOVAL & TRIMMING IN AREA D |
Contract Highway Maintenance |
COMPLETE |
|
605375 |
DENNIS- RECONSTRUCTION ON EAST WEST DENNIS ROAD (ROUTE 134) FROM MAIN STREET (ROUTE 28) TO UPPER COUNTY ROAD |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605376 |
DISTRICT 5- TREE REMOVAL & TRIMMING ON MARTHA'S VINEYARD ISLAND |
Contract Highway Maintenance |
COMPLETE |
|
605395 |
DISTRICT 5- DUMPING GROUND CLOSURES AT VARIOUS LOCATIONS IN SHARON, WALPOLE & WRENTHAM |
Hazardous Waste Remediation |
COMPLETE |
|
605399 |
DUXBURY- KINGSTON- PEMBROKE- TREE TRIMMING & ROADSIDE CLEARING ON ROUTE 53 |
Contract Highway Maintenance |
COMPLETE |
|
605400 |
DUXBURY- MARSHFIELD- SCITUATE- TREE TRIMMING & ROADSIDE CLEARANCE ON ROUTE 3A |
Contract Highway Maintenance |
COMPLETE |
|
605414 |
FOXBOROUGH- BRIDGE PRESERVATION, F-06-015, I-95 OVER GREEN STREET |
Structures Maintenance |
COMPLETE |
|
605444 |
SEEKONK- DARTMOUTH- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-195 & SR 24 |
Structural Signing |
COMPLETE |
|
605493 |
DISTRICT 5- INTERSTATE DECK REPAIRS (ABP-PR13) |
Structures Maintenance |
COMPLETE |
|
605494 |
DISTRICT 5- INTERSTATE DECK REPAIRS AT VARIOUS LOCATIONS (ABP-PR28) |
Structures Maintenance |
COMPLETE |
|
605495 |
DISTRICT 5- INTERSTATE SUBSTRUCTURE REPAIRS (ABP-PR14) |
Structures Maintenance |
COMPLETE |
|
605496 |
DISTRICT 5- INTERSTATE SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS (ABP-PR29) |
Structures Maintenance |
COMPLETE |
|
605558 |
BROCKTON- WEST BRIDGEWATER- BRIDGEWATER- RAYNHAM- RESURFACING & RELATED WORK ON ROUTE 24 |
Resurfacing |
COMPLETE |
|
605576 |
MIDDLEBOROUGH- CABLE BARRIER INSTALLATION ON I-495 |
Guard Rail & Fencing |
COMPLETE |
|
605590 |
CANTON- NORWOOD- SHARON- WALPOLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
605591 |
MANSFIELD- NORTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 |
Resurfacing |
COMPLETE |
|
605596 |
FOXBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
605601 |
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605603 |
DISTRICT 5- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
605619 |
FALMOUTH- RESURFACING & RELATED WORK ON ROUTE 28 |
Resurfacing |
COMPLETE |
|
605623 |
DISTRICT 5- REPAIR OF FABRIC SALT STORAGE SHEDS AT VARIOUS LOCATIONS |
Chemical Storage Sheds |
COMPLETE |
|
605664 |
MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3A |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
605665 |
MANSFIELD- CORRIDOR IMPROVEMENTS ON ROUTE 106 (EASTMAN STREET), FROM EAST STREET TO THE EASTON T.L. |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605666 |
DISTRICT 5- TREE REMOVAL IN AREAS A, B & C |
Landscaping |
COMPLETE |
|
605667 |
DISTRICT 5- SALT STORAGE SHED REPAIRS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
COMPLETE |
|
605668 |
RAYNHAM- SIGNAL & INTERSECTION IMPROVEMENT @ ROUTE 44 (NEW STATE HIGHWAY), ORCHARD STREET & ROUTE 24 (NB) OFF-RAMP |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605671 |
FALMOUTH- INTERSECTION IMPROVEMENTS AT EAST FALMOUTH HIGHWAY (ROUTE 28), DAVISVILLE ROAD & OLD MEETINGHOUSE ROAD AND INTERSECTION IMPROVEMENTS AT TEATICKET HIGHWAY (ROUTE 28) AND JONES ROAD/WORCESTER COURT |
Traffic Signals |
COMPLETE |
|
605677 |
MATTAPOISETT- MULTI-USE PATH CONSTRUCTION (PENN CENTRAL RIGHT OF WAY), FROM MATTAPOISETT NECK ROAD TO DEPOT STREET (PHASE 1B) |
Bikeway/Bike Path Construction |
COMPLETE |
|
605678 |
NEW BEDFORD- CONSTRUCTION OF FLAHERTY DRIVE EXTENSION, INCLUDES WILDLIFE CULVERTS N-06-044 & N-06-045 |
New Construction |
COMPLETE |
|
605679 |
TAUNTON- INTERSECTION IMPROVEMENTS AT COUNTY STREET (ROUTE 140) AND HART STREET |
Traffic Signals |
COMPLETE |
|
605686 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605700 |
WRENTHAM- RESURFACING & RELATED WORK ON ROUTE 140, FROM THE FRANKLIN/WRENTHAM T.L. TO THE FOXBOROUGH/WRENTHAM T.L. |
Resurfacing |
COMPLETE |
|
605704 |
DISTRICT 5- SCHEDULED & EMERGENCY TRAFFIC OPERATIONS
|
Miscellaneous/No Prequal |
COMPLETE |
|
605719 |
DISTRICT 5- BRIDGE CLEANING AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605731 |
FREETOWN- INTERSECTION IMPROVEMENTS AT COUNTY ROAD, CHACE ROAD & MASON ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
605734 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING IN AREAS A, B & C |
Resurfacing |
COMPLETE |
|
605769 |
DISTRICT 5- FABRICATION & INSTALLATION OF SIGNS AND SUPPORTS AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
605779 |
DISTRICT 5- MAINTENANCE OF STATE HIGHWAYS IN AREA 5D (MARTHA'S VINEYARD) |
Contract Highway Maintenance |
COMPLETE |
|
605795 |
FALL RIVER- SCHEDULED & EMERGENCY DECK & STEEL REPAIRS ON ROUTE 79 VIADUCT & I-195 RAMPS |
Structures Maintenance |
COMPLETE |
|
605805 |
DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS TO BRIDGES VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605806 |
NEW BEDFORD- MULTIMODAL (LANDSIDE & WATERSIDE) POWER ELECTRIFICATION FOR COMMERCIAL FISHING PIERS |
Electrical |
COMPLETE |
|
605821 |
MANSFIELD- FOXBOROUGH- BRIDGE REHABILITATION, M-03-026, GROVE STREET OVER I-95; M-03-027, I-495 OVER I-95; F-06-027, I-495 OVER I-95 & M-03-028, WEST STREET OVER I-495 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605848 |
DARTMOUTH- IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
605866 |
DISTRICT 5- BRIDGE PAINTING AT VARIOUS LOCATIONS |
Painting - Structural |
COMPLETE |
|
605868 |
DISTRICT 5- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
605869 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
605878 |
MIDDLEBOROUGH- NEMASKET RIVER STORMWATER POLLUTION MITIGATION |
Landscaping |
COMPLETE |
|
605897 |
DISTRICT 5- TREE TRIMMING & REMOVAL AT VARIOUS LOCATIONS IN AREA 5D |
Contract Highway Maintenance |
COMPLETE |
|
605898 |
DISTRICT 5- TREE TRIMMING & TREE REMOVAL IN MARTHA'S VINEYARD |
Contract Highway Maintenance |
COMPLETE |
|
605899 |
DISTRICT 5- CATCH BASIN CLEANING IN AREAS 5A, 5B & 5C |
Catch Basin Cleaning |
COMPLETE |
|
605900 |
DISTRICT 5- CATCH BASIN CLEANING AT VARIOUS LOCATIONS IN AREA 5D |
Catch Basin Cleaning |
COMPLETE |
|
605901 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS IN AREAS A, C & D |
Highway Sweeping |
COMPLETE |
|
605902 |
DISTRICT 5- UPGRADES & REPAIRS TO HIGHWAY LIGHTING AT VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
605904 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS ON VARIOUS STATE HIGHWAYS |
Pavement Marking |
COMPLETE |
|
605905 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING IN AREAS 5A, 5B & 5C |
Contract Highway Maintenance |
COMPLETE |
|
605906 |
DISTRICT 5- MEDIAN DELINEATION REPLACEMENT ON ROUTE 6, FROM DENNIS T.L. TO ORLEANS T.L. |
Contract Highway Maintenance |
COMPLETE |
|
605914 |
LAKEVILLE- FREETOWN- NEW BEDFORD- FAIRHAVEN- MEDIAN CABLE BARRIER INSTALLATION ON ROUTE 140 & ROUTE I-195 |
Guard Rail & Fencing |
COMPLETE |
|
605922 |
DISTRICT 5- FACILITY MAINTENANCE |
Vertical Construction (Ch 149) |
COMPLETE |
|
605923 |
DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
605943 |
BOURNE- SANDWICH- CAMERA & EQUIPMENT INSTALLATION AT THE SAGAMORE & BOURNE BRIDGES & ROUTE 6 |
Intelligent Transportation Sys |
COMPLETE |
|
606007 |
CARVER: FAP# STP-002S(743)X ROADWAY RECONSTRUCTION AND RELATED WORK (INCLUDING SIGNALS) ALONG A SECTION OF ROUTE 58 (MAIN STREET) (606007) |
Resurfacing |
COMPLETE |
|
606016 |
BREWSTER- RESURFACING & RELATED WORK ON ROUTE 6A |
Resurfacing |
COMPLETE |
|
606036 |
BROCKTON- SIGNAL & INTERSECTION IMPROVEMENTS @ ROUTE 123 (BELMONT STREET)/LINWOOD STREET/LORRAINE AVENUE |
Traffic Signals |
COMPLETE |
|
606044 |
ATTLEBORO- SAFE ROUTES TO SCHOOL (THACHER SCHOOL) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
606055 |
DISTRICT 5- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIALS PURCHASE & INSTALLATION |
Traffic Signals |
COMPLETE |
|
606065 |
DISTRICT 5- GUARDRAIL BETTERMENT AT VARIOUS LOCATIONS
|
Guard Rail & Fencing |
COMPLETE |
|
606071 |
EASTON- SIGNAL & INTERSECTION IMPROVEMENTS @ ROUTE 138 (TURNPIKE STREET) AND ROUTE 106 (FOUNDRY STREET) |
Traffic Signals |
COMPLETE |
|
606073 |
STATEWIDE- INSTALLATION & UPGRADING OF 511 MOTORIST INFORMATION SIGNS |
Sign Installation/Upgrading |
COMPLETE |
|
606118 |
NEW BEDFORD- RECONSTRUCTION OF ROUTE 18 (JFK HIGHWAY), FROM COVE STREET TO GRIFFIN COURT (PHASE II) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606129 |
DISTRICT 5- EMERGENCY & SCHEDULED INSTALLATION OF BRIDGE SHIELDING |
Structures Maintenance |
COMPLETE |
|
606131 |
SANDWICH- INTERSECTION (ROUNDABOUT) IMPROVEMENTS @ COTUIT ROAD/HARLOW ROAD/SOUTH SANDWICH ROAD |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
606139 |
FAIRHAVEN- BRIDGE SUPERSTRUCTURE REPLACEMENT, F-01-014, I-195 OVER RIVER AVENUE |
Bridge Reconstruction/Rehab |
COMPLETE |
|
606140 |
BRIDGEWATER- RAYNHAM- TAUNTON- NORTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 |
Resurfacing |
COMPLETE |
|
606171 |
SHARON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
606172 |
NEW BEDFORD- FAIRHAVEN- INTERSTATE MAINTENANCE & RELATED WORK ON I-195 |
Resurfacing |
COMPLETE |
|
606176 |
FRANKLIN- WRENTHAM- PLAINVILLE- FOXBOROUGH- MANSFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 (NB & SB) |
Resurfacing Interstate |
COMPLETE |
|
606178 |
BOURNE- RESURFACING & RELATED WORK ON ROUTE 28 |
Resurfacing |
COMPLETE |
|
606179 |
DENNIS- HARWICH- RESURFACING & RELATED WORK ON ROUTE 6 |
Resurfacing |
COMPLETE |
|
606215 |
DISTRICT 5- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT AT VARIOUS LOCATIONS IN AREAS A, B & C |
Landscaping |
COMPLETE |
|
606216 |
SCITUATE- SAFE ROUTES TO SCHOOL (HATHERLY ELEMENTARY SCHOOL) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
606219 |
TISBURY- RECONSTRUCTION OF SIDEWALKS ON STATE ROAD, FROM CAMP STREET TO PINE TREE ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606225 |
EASTON- SAFE ROUTES TO SCHOOL (F.L. OLMSTED SCHOOL) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
606228 |
DISTRICT 5- ROUTINE BRIDGE MAINTENANCE ON ROUTE 24 CORRIDOR |
Structures Maintenance |
COMPLETE |
|
606248 |
DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5- DISTRICT 6- PEDESTRIAN SIGNAGE & CROSSWALK UPGRADES AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
606264 |
PLYMOUTH- IMPROVEMENTS ON OBERY STREET, FROM SOUTH STREET TO A.A. CARANCI WAY/PLYMOUTH NORTH H.S. DRIVE INTERSECTION |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
606273 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606274 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606281 |
DISTRICT 5- STORMWATER RETROFITS AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
606286 |
BOURNE- SANDWICH- RESURFACING OF ROUTE 6 (MID-CAPE HIGHWAY), FROM SAGAMORE BRIDGE TO SANDWICH/BARNSTABLE T.L. INCLUDES 6 BRIDGES |
Resurfacing |
COMPLETE |
|
606292 |
DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606295 |
SANDWICH- CABLE BARRIER INSTALLATION ON ROUTE 6 |
Guard Rail & Fencing |
COMPLETE |
|
606296 |
DARTMOUTH- CABLE BARRIER INSTALLATION ON I-195 |
Guard Rail & Fencing |
COMPLETE |
|
606297 |
TAUNTON- LAKEVILLE- CABLE BARRIER INSTALLATION ON ROUTE 140 |
Guard Rail & Fencing |
COMPLETE |
|
606299 |
FALL RIVER- SOMERSET- SURVEILLANCE SYSTEM INSTALLATION ON BRAGA BRIDGE (I-195) |
Intelligent Transportation Sys |
COMPLETE |
|
606338 |
DISTRICT 5- TREE TRIMMING & SIGHT DISTANCE CLEARING VARIOUS LOCATIONS (AREA 5D) |
Landscaping |
COMPLETE |
|
606339 |
DISTRICT 5- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENTS AT VARIOUS LOCATIONS (MARTHA'S VINEYARD) |
Landscaping |
COMPLETE |
|
606340 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
606341 |
DISTRICT 5- REFURBISHMENT & REPLACEMENT OF CRASH CUSHIONS (SAND BARRELS) AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
606342 |
DISTRICT 5- REFURBISHMENT & REPAIR OF IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
606344 |
DISTRICT 5- SCHEDULED & EMERGENCY TRAFFIC OPERATIONS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
606349 |
DISTRICT 5- SIDEWALK REPAIRS, CONSTRUCTION & UPGRADES AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
606350 |
DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
606351 |
DISTRICT 5- CHAIN LINK FENCE REPAIR & INSTALLATION AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
606372 |
WAREHAM- BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER |
Bridge Replacement |
COMPLETE |
|
606374 |
DIGHTON- BRIDGE REPLACEMENT, D-08-006, BROOK STREET OVER SEGREGANSET RIVER |
Bridge Replacement |
COMPLETE |
|
606383 |
RAYNHAM- BRIDGE DECK REPLACEMENT, R-02-025, ROUTE 138 OVER I-495 |
Structures Maintenance |
COMPLETE |
|
606386 |
FALL RIVER- SUPERSTRUCTURE REPLACEMENT, F-02-052, HERMAN STREET OVER ROUTE 79 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
606394 |
BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
606433 |
NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET |
Bikeway/Bike Path Construction |
COMPLETE |
|
606461 |
ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET & CHATHAM ROAD (ROUTE 28) AND MAIN STREET |
Traffic Signals |
COMPLETE |
|
606465 |
DISTRICT 5- SIGNS & PAVEMENT MARKINGS UPGRADES AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
606494 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606501 |
HOLBROOK- RECONSTRUCTION OF UNION STREET (ROUTE 139), FROM LINFIELD STREET TO CENTRE STREET/WATER STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606512 |
DISTRICT 5- UNDERGROUND STORAGE TANK REMOVAL & REPLACEMENT AT THE HANOVER DEPOT |
Underground Tank Removal Replace |
COMPLETE |
|
606519 |
BROCKTON- SAFE ROUTES TO SCHOOL (BROOKFIELD ELEMENTARY SCHOOL) |
New Construction |
COMPLETE |
|
606525 |
ATTLEBORO- BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE |
Bridge Reconstruction/Rehab |
COMPLETE |
|
606545 |
NORWOOD- MEDIAN JERSEY BARRIER & FENCING UPGRADE ON ROUTE 1 |
Guard Rail & Fencing |
COMPLETE |
|
606553 |
HANOVER- NORWELL- BRIDGE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER HIGH STREET |
Bridge Replacement |
COMPLETE |
|
606580 |
SOMERSET- PARK & RIDE EXPANSION ON ROUTE 103 |
Miscellaneous/No Prequal |
COMPLETE |
|
606583 |
DISTRICT 5- STORMWATER RETROFITS AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
606596 |
CHATHAM- IMPROVEMENTS ON MAIN STREET (ROUTE 28), FROM GEORGE RYDER ROAD TO BARN HILL ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606608 |
ATTLEBORO- RAMP SAFETY IMPROVEMENTS AT THE ROUTE I-295 NB RAMP TO ROUTE I-95 NB |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606637 |
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606687 |
DISTRICT 5- DRAINAGE REPAIR & INSTALLATION AT VARIOUS LOCATIONS (AREAS ABCD) |
Miscellaneous/No Prequal |
COMPLETE |
|
606688 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREAS ABC) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606689 |
DISTRICT 5- TREE REMOVAL & TRIMMING AT VARIOUS LOCATIONS (AREAS ABC) |
Landscaping |
COMPLETE |
|
606691 |
DISTRICT 5- GUARDRAIL & BARRIER SYSTEMS REPAIR & UPGRADE AT VARIOUS LOCATIONS (AREAS ABCD) |
Guard Rail & Fencing |
COMPLETE |
|
606692 |
DISTRICT 5- CATCH BASIN & PIPE CLEANING AT VARIOUS LOCATIONS (AREAS ABC) |
Catch Basin Cleaning |
COMPLETE |
|
606693 |
DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS (AREAS ABC) |
Mowing and Spraying |
COMPLETE |
|
606694 |
DISTRICT 5- SALT SHED REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS ABCD) |
Vertical Construction (Ch 149) |
COMPLETE |
|
606695 |
DISTRICT 5- SCHEDULED AND EMERGENCY FACILITY REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
COMPLETE |
|
606696 |
DISTRICT 5- HIGHWAY MAINTENANCE & RELATED WORK ON STATE ROADWAYS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
COMPLETE |
|
606697 |
DISTRICT 5- TRAFFIC SIGNAL SYSTEMS UPGRADES & REPAIRS AT VARIOUS LOCATIONS (AREAS ABCD) |
Traffic Signals |
COMPLETE |
|
606698 |
DISTRICT 5- FABRICATION & INSTALLATION OF OVERHEAD & GROUND MOUNTED SIGNS AT VARIOUS LOCATIONS (AREAS ABCD) |
Sign Installation/Upgrading |
COMPLETE |
|
606699 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS (AREAS ABCD) |
Pavement Marking |
COMPLETE |
|
606700 |
DISTRICT 5- ROUTINE MAINTENANCE & STRUCTURAL REPAIRS TO ROUTE 3 CORRIDOR BRIDGES |
Structures Maintenance |
COMPLETE |
|
606707 |
DENNIS- CORRIDOR AND STREETSCAPE IMPROVEMENTS ON MAIN STREET (ROUTE 28), FROM DENNIS COMMONS DRIVE TO UPPER COUNTY ROAD |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
606717 |
FALL RIVER- MULTI-USE PATH CONSTRUCTION, FROM BRAYTON AVENUE TO QUEQUECHAN STREET, INCLUDES REHAB OF F-02-106 & F-02-107 (QUEQUECHAN RAILTRAIL - PHASE III) |
Bikeway/Bike Path Construction |
COMPLETE |
|
606718 |
NEW BEDFORD- INTERSECTION IMPROVEMENTS AT HATHAWAY ROAD, MOUNT PLEASANT STREET AND NAUSET STREET |
New Construction |
COMPLETE |
|
606729 |
TAUNTON- RECONSTRUCTION ON COUNTY STREET (ROUTE 140), FROM THE ROUTE 24 (SB OFF-RAMP) NORTHERLY TO MOZZONE BOULEVARD |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
606733 |
ATTLEBORO- RAMP RECONSTRUCTION & REALIGNMENT, FROM ROUTE I-95 (SB) TO ROUTE I-295 (SB) |
New Construction |
COMPLETE |
|
606793 |
BRIDGEWATER- BROCKTON- WEST BRIDGEWATER- INSTALLATION OF AN ANTI-GLARE SCREEN ALONG ROUTE 24 MEDIAN |
New Construction |
COMPLETE |
|
606900 |
BOURNE- TRAFFIC AND MULTI-MODAL IMPROVEMENTS @ BELMONT CIRCLE AT ROUTES 6/25/28 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606905 |
DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606906 |
DISTRICT 5- BRIDGE CLEANING AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
606907 |
DISTRICT 5- EMERGENCY & SCHEDULED INSTALLATION OF BRIDGE SHIELDING |
Structures Maintenance |
COMPLETE |
|
606910 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS AND RELATED WORK ON COGGESHALL STREET, FROM PURCHASE STREET TO MITCHELL AVENUE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
607019 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
COMPLETE |
|
607041 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
COMPLETE |
|
607175 |
PLYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
607240 |
NANTUCKET- RESURFACING & RELATED WORK ON POLPIS ROAD, FROM RABBIT RUN ROAD TO 1,000 FEET NORTHEAST OF NORTH PASTURE LANE |
Resurfacing |
COMPLETE |
|
607263 |
BARNSTABLE- BOURNE- SANDWICH- INSTALLATION OF REAL TIME TRAFFIC MONITORING (RTTM) SYSTEM AND VARIABLE MESSAGE BOARDS ON ROUTES 6, 25 AND 28 (CAPE COD REGIONAL ITS) |
Intelligent Transportation Sys |
COMPLETE |
|
607265 |
SHARON- WALPOLE- DUMPING GROUND CLOSURE AT ROUTE 27 MAINTENANCE FACILITY
|
Miscellaneous/No Prequal |
COMPLETE |
|
607267 |
SANDWICH- DUMPING GROUND CLOSURE AT ROUTE 130 MAINTENANCE FACILITY |
Miscellaneous/No Prequal |
COMPLETE |
|
607300 |
DISTRICT 5- SIGNS & MARKING UPGRADES FOR STOP-SIGN CONTROLLED INTERSECTIONS AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
607304 |
DARTMOUTH- INTERSECTION IMPROVEMENTS & RELATED WORK AT CHASE ROAD & OLD WESTPORT ROAD |
Traffic Signals |
COMPLETE |
|
607307 |
DISTRICT 5- HIGHWAY LIGHTING REPAIRS & UPGRADES VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
607308 |
DISTRICT 5- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
607309 |
HINGHAM- RECONSTRUCTION & RELATED WORK ON DERBY STREET, FROM POND PARK ROAD TO CUSHING STREET |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
607314 |
REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET |
Bridge Reconstruction/Rehab |
COMPLETE |
|
607337 |
PEMBROKE- INTERSECTION IMPROVEMENTS AND RELATED WORK AT WASHINGTON STREET (ROUTE 53) AND PLEASANT STREET |
Traffic Signals |
COMPLETE |
|
607345 |
COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET |
Bridge Replacement |
COMPLETE |
|
607355 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREA D) |
Crack Sealing |
COMPLETE |
|
607356 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
607357 |
DISTRICT 5- INSTALLATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
607358 |
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREAS A, B & C) |
Landscaping |
COMPLETE |
|
607359 |
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (MARTHA'S VINEYARD) |
Landscaping |
COMPLETE |
|
607360 |
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREA D) |
Landscaping |
COMPLETE |
|
607361 |
DISTRICT 5- SCHEDULED & EMERGENCY FACILITY REPAIRS & UPGRADES AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
COMPLETE |
|
607362 |
DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
607363 |
DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
607364 |
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREAS A, B & C) |
Crack Sealing |
COMPLETE |
|
607365 |
DISTRICT 5- REPAIRS & UPGRADES TO CHAIN LINK & LAYOUT FENCE SYSTEMS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
607366 |
DISTRICT 5- REPAIRS, UPGRADES & CONSTRUCTION OF SIDEWALKS AND ACCESS RAMPS AT VARIOUS LOCATIONS |
Roadway - Reconstr - Sidewalks and Curbing |
COMPLETE |
|
607389 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607392 |
SEEKONK- INTERSECTION IMPROVEMENTS & RELATED WORK AT FALL RIVER AVENUE (ROUTE 114A) AND COUNTY STREET |
Traffic Signals |
COMPLETE |
|
607411 |
TISBURY- BIKE & PEDESTRIAN IMPROVEMENTS ALONG BEACH ROAD, FROM THE TERMINATION OF THE EXISTING SHARED USE PATH WESTERLY TO THE FIVE CORNERS INTERSECTION |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607435 |
BARNSTABLE- INTERSECTION IMPROVEMENTS @ FALMOUTH ROAD (ROUTE 28) & OSTERVILLE-WEST BARNSTABLE ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607438 |
EASTON- INTERSECTION IMPROVEMENTS AT WASHINGTON STREET (ROUTE 138) AND UNION STREET |
Traffic Signals |
COMPLETE |
|
607482 |
DISTRICT 5- DISTRICT 6- ITS CONSTRUCTION ON ROUTE 3, FROM BRAINTREE TO PLYMOUTH |
Intelligent Transportation Sys |
COMPLETE |
|
607483 |
DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM STOUGHTON TO FALL RIVER (37 MILES) |
Intelligent Transportation Sys |
COMPLETE |
|
607495 |
DISTRICT 5- RETROREFLECTIVE SIGN UPGRADE ON SECONDARY ROADS |
Sign Installation/Upgrading |
COMPLETE |
|
607509 |
DISTRICT 5- BRIDGE CLEANING AND RELATED WORK ALONG I-495 AND ROUTE 6, ROUTE 25 AND ROUTE 28 CORRIDORS |
Structures Maintenance |
COMPLETE |
|
607513 |
DISTRICT 5- BRIDGE CLEANING AND RELATED WORK ALONG I-95, I-195 AND I-295 CORRIDORS |
Structures Maintenance |
COMPLETE |
|
607514 |
DISTRICT 5- BRIDGE MAINTENANCE AT VARIOUS LOCATIONS ALONG THE ROUTE 24 & ROUTE 3 CORRIDORS |
Structures Maintenance |
COMPLETE |
|
607536 |
BRIDGEWATER- CONSTRUCTION OF A PRE-ENGINEERED MECHANIC'S SERVICE FACILITY AT THE DEPOT |
Vertical Construction (Ch 149) |
COMPLETE |
|
607537 |
FALL RIVER- BRIDGE DECK REPLACEMENT. F-02-040, AIRPORT ROAD OVER STATE ROUTE 24 |
Bridge Replacement |
COMPLETE |
|
607563 |
WAREHAM- ROCHESTER- MIDDLEBORO- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 |
Resurfacing Interstate |
COMPLETE |
|
607566 |
SEEKONK- REHOBOTH- INTERSTATE MAINTENANCE & RELATED WORK ON I-195 |
Resurfacing Interstate |
COMPLETE |
|
607571 |
DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW PEDESTRIAN BRIDGE D-07-007=Y-01-010 |
Bridge Replacement |
COMPLETE |
|
607572 |
TAUNTON- CORRIDOR IMPROVEMENTS & RELATED WORK ON BROADWAY (ROUTE 138), FROM LEONARD STREET NORTHERLY TO PURCHASE STREET (PHASE 1) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607627 |
DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREAS A,B, & C) |
Tree Trimming |
COMPLETE |
|
607628 |
DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREA D) |
Mowing and Spraying |
COMPLETE |
|
607629 |
DISTRICT 5- LITTER REMOVAL SERVICES AT VARIOUS LOCATIONS (AREAS A, B, & C) |
Landscaping |
COMPLETE |
|
607631 |
DISTRICT 5- LITTER REMOVAL AT VARIOUS LOCATIONS (AREA D) |
Landscaping |
COMPLETE |
|
607653 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIRS AND SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
607714 |
WESTPORT- RESURFACING & RELATED WORK ON ROUTE 88 |
Resurfacing |
COMPLETE |
|
607716 |
MANSFIELD- SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDAN-JACKSON ELEMENTARY SCHOOL (SRTS) |
Sidewalk Construction and Repairs |
COMPLETE |
|
607717 |
DISTRICT 5- STREET SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
607719 |
MIDDLEBOROUGH- INTERSECTION IMPROVEMENTS & RELATED WORK AT JOHN GLASS SQUARE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
607726 |
DISTRICT 5- DRAINAGE & EROSION REPAIRS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
607730 |
FALL RIVER- NEW BEDFORD- BRIDGE REPLACEMENTS, F-02-091, COUNTRY CLUB ROAD OVER MAC RR, F-02-029, MAC RR OVER BROWNELL STREET, F-02-030, MAC RR OVER PRESIDENT AVENUE, & N-06-024, MAC RR OVER ROUTE 18 & WAMSUTTA STREET |
New Construction |
COMPLETE |
|
607753 |
BARNSTABLE- INTERSECTION & SIGNAL IMPROVEMENTS AT SR 28 (FALMOUTH ROAD) AT STRAWBERRY HILL ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607769 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607778 |
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607828 |
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
607829 |
DISTRICT 5- REPAIRS AND UPGRADES TO GUARDRAIL, CABLE & BARRIER SYSTEMS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
607830 |
DISTRICT 5- TRAFFIC SIGNAL REPAIRS & UPGRADES AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
607831 |
DISTRICT 5- SCHEDULED & EMERGENCY TEMPORARY TRAFFIC CONTROL DEVICE INSTALLATION AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
607832 |
DISTRICT 5- CATCH BASIN AND PIPE CLEANING AT VARIOUS LOCATIONS |
Catch Basin Cleaning |
COMPLETE |
|
607833 |
DISTRICT 5- REPAIRS & UPGRADES TO SALT SHED FACILITIES AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
COMPLETE |
|
607834 |
DISTRICT 5- MAINTENANCE OF STATE ROADWAYS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
COMPLETE |
|
607835 |
DISTRICT 5- APPLICATION OF REFELCTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
607836 |
DISTRICT 5- TREE TRIMMING, SIGHT DISTANCE CLEARING & HAZARDOUS TREE REMOVAL IN MARTHA'S VINEYARD |
Landscaping |
COMPLETE |
|
607860 |
WHITMAN- TRAFFIC SIGNAL IMPROVEMENTS & RELATED WORK ON BEDFORD STREET (ROUTE 18) AT 2 LOCATIONS: AUBURN STREET (ROUTE 14) & TEMPLE STREET (ROUTE 27) |
Traffic Signals |
COMPLETE |
|
607894 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
607895 |
DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607896 |
DISTRICT 5- EMERGENCY & SCHEDULED INSTALLATION OF BRIDGE SHIELDING |
Structures Maintenance |
COMPLETE |
|
607897 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607898 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-495 CORRIDOR |
Structures Maintenance |
COMPLETE |
|
607914 |
NANTUCKET- RESURFACING & RELATED WORK ON POLPIS ROAD, FROM EAST OF NORTH PASTURE LANE TO FULLING MILL ROAD |
Resurfacing |
COMPLETE |
|
607916 |
FALL RIVER TO RANDOLPH- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 24 |
Structural Signing |
COMPLETE |
|
607918 |
DISTRICT 5- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK ON A SECTION OF US ROUTE 6 (MID-CAPE HIGHWAY) |
Structural Signing |
COMPLETE |
|
607921 |
DISTRICT 5- FENCE REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
607923 |
DISTRICT 5- SCHEDULED & EMERGENCY FACILITY REPAIRS AND UPGRADES AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
607924 |
DISTRICT 5- REPAIRS AND INSTALLATION OF SIDEWALKS AT VARIOUS LOCATIONS |
Miscellaneous/No Prequal |
COMPLETE |
|
607925 |
DISTRICT 5- PAVEMENT REPAIRS AND CRACK SEALING AT VARIOUS LOCATIONS (AREAS A, B & C) |
Resurfacing |
COMPLETE |
|
607926 |
DISTRICT 5- PAVEMENT REPAIRS AND CRACK SEALING AT VARIOUS LOCATIONS (AREA D) |
Crack Sealing |
COMPLETE |
|
607927 |
DISTRICT 5- HAZARDOUS TREE REMOVAL AND TRIMMING AT VARIOUS LOCATIONS (AREA A,B,&C) |
Landscaping |
COMPLETE |
|
607928 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS IN AREA D (ISLANDS EXCLUDED) |
Landscaping |
COMPLETE |
|
607929 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
607930 |
DISTRICT 5- DRAINAGE REPAIRS AT VARIOUS LOCATIONS |
Drainage |
COMPLETE |
|
607931 |
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
607932 |
DISTRICT 5- SCHEDULED AND EMERGENCY HIGHWAY LIGHTING UPGRADES AT VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
607933 |
DISTRICT 5- INSTALLATION AND REPLACEMENT OF DELINEATOR POSTS AT VARIOUS LOCATIONS
|
Sign Installation/Upgrading |
COMPLETE |
|
607934 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
COMPLETE |
|
607941 |
EAST BRIDGEWATER- RESURFACING AND SIDEWALK CONSTRUCTION ON BEDFORD STREET (ROUTE 18), FROM WHITMAN STREET (ROUTE 106) TO CENTRAL STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607988 |
KINGSTON- DUXBURY- MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608001 |
FALL RIVER- IMPROVEMENTS AT VIVEIROS ELEMENTARY SCHOOL (SRTS) |
Sidewalk Construction and Repairs |
COMPLETE |
|
608025 |
BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL |
Traffic Signals |
COMPLETE |
|
608033 |
BARNSTABLE- LIGHTING & LANDSCAPING OF THE ROUNDABOUT AT THE MID-CAPE HIGHWAY (ROUTE 6) EASTBOUND EXIT RAMP & ROUTE 149 |
Lighting |
COMPLETE |
|
608039 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
608069 |
MARSHFIELD- PEMBROKE- NORWELL- HANOVER- ROCKLAND- HINGHAM- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608080 |
WESTPORT- RESURFACING AND RELATED WORK ON ROUTE 88 FROM MILE MARKER 1.2 (JUST NORTH OF DRIFT ROAD) NORTHERLY TO MILE MARKER 7.5, JUST SOUTH OF OLD COUNTY ROAD |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608081 |
WESTPORT- RESURFACING AND RELATED WORK ALONG ROUTE 88, FROM MILE MARKER 0.0 (BEGINNING OF STATE HIGHWAY) NORTHERLY TO MILE MARKER 1.2, JUST NORTH OF DRIFT ROAD |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608085 |
AVON- INSTALLATION OF A MEDIAN BARRIER ON HARRISON BOULEVARD |
Guard Rail & Fencing |
COMPLETE |
|
608086 |
AVON- INTERSECTION IMPROVEMENTS AT HARRISON BOULEVARD AND POND STREET |
Traffic Signals |
COMPLETE |
|
608087 |
BROCKTON- PEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS |
Roadway - Reconstr - Sidewalks and Curbing |
COMPLETE |
|
608101 |
NEW BEDFORD- PARK AND RIDE IMPROVEMENTS INCLUDING A NEW BUS SHELTER REPLACEMENT AT THE MOUNT PLEASANT STREET PARK AND RIDE |
Resurfacing |
COMPLETE |
|
608102 |
HARWICH- IMPROVEMENTS TO PARK AND RIDE FACILITY INCLUDING A NEW BUS SHELTER AT ROUTE 124 PARK AND RIDE |
Resurfacing |
COMPLETE |
|
608104 |
FOXBOROUGH-PLAINVILLE
CLEANING AND PAINTING OF 3 BRIDGES BR. NOS. (F-06-026, P-12-005 (NB)
& P-12-005 (SB)) ALONG INTERSTATE 495
|
Bridge Preservation |
COMPLETE |
|
608105 |
WRENTHAM- BRIDGE PAINTING ON I-495 (NB & SB) |
Bridge Preservation |
COMPLETE |
|
608113 |
DISTRICT 5- DISTRICT 6- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II) |
Traffic Signals |
COMPLETE |
|
608124 |
MIDDLEBOROUGH- INTERIM IMPROVEMENTS AT ROUTES 18/28/44 (ROTARY) |
Pavement Marking |
COMPLETE |
|
608132 |
MANSFIELD- SWANSEA- SOMERSET- NEW BEDFORD- STORMWATER IMPROVEMENTS ALONG I-495 AND I-195 |
Sewer and Water |
COMPLETE |
|
608135 |
NEW BEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 6/ROUTE 18 |
Drainage |
COMPLETE |
|
608143 |
ABINGTON- BROCKTON- INTERSECTION IMPROVEMENTS AT NORTH QUINCY STREET, BOUNDARY AVENUE AND CHESTNUT STREET |
Traffic Signals |
COMPLETE |
|
608147 |
NORTH ATTLEBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
608176 |
BERKLEY- FREETOWN- RESURFACING & RELATED WORK ON ROUTE 24 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608201 |
HARWICH- BREWSTER- ORLEANS- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608210 |
FOXBOROUGH- PLAINVILLE- WRENTHAM- FRANKLIN- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 NORTHBOUND |
Resurfacing Interstate |
COMPLETE |
|
608222 |
BOURNE- WAREHAM- RESURFACING AND RELATED WORK ON ROUTE 25 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608223 |
FALL RIVER- RESURFACING AND RELATED WORK ON ROUTE 24 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608266 |
PEMBROKE- RESURFACING AND RELATED WORK ON ROUTE 53 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608268 |
DISTRICT 5- STREET SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
608283 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
608349 |
TRURO- WELLFLEET- BICYCLE ACCOMMODATION IMPROVEMENTS ON ROUTE 6 |
Pavement Marking |
COMPLETE |
|
608377 |
DARTMOUTH- NEW BEDFORD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-195 |
Resurfacing Interstate |
COMPLETE |
|
608409 |
DENNIS- YARMOUTH- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing |
COMPLETE |
|
608416 |
DISTRICT 5- MAINTENANCE OF STATE ROADWAYS AT VARIOUS LOCATIONS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
COMPLETE |
|
608417 |
DISTRICT 5- DRAINAGE AND EROSION REPAIRS AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
608419 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS INCLUDING MARTHA'S VINEYARD ISLAND |
Pavement Marking |
COMPLETE |
|
608439 |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS |
Drawbridge Maintenance |
COMPLETE |
|
608440 |
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
608447 |
DISTRICT 5- SCHEDULED AND EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
608448 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC SIGNAL REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
608450 |
DISTRICT 5- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Sign Installation/Upgrading |
COMPLETE |
|
608451 |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS |
Electrical |
COMPLETE |
|
608454 |
MIDDLEBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 44 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608455 |
PLYMOUTH- KINGSTON- CARVER- PLYMPTON- RESURFACING AND RELATED WORK ON ROUTE 44 (FROM MM 28.8 TO 36.4) |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608469 |
BOURNE- PLYMOUTH- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608470 |
REHOBOTH- RESURFACING AND RELATED WORK ON ROUTE 44 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608481 |
SEEKONK- RESURFACING AND RELATED WORK ON ROUTE 44 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608499 |
DIGHTON- TAUNTON- RESURFACING AND RELATED WORK ON ROUTE 44 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608507 |
DISTRICT 5- SCHEDULED AND EMERGENCY SALT STORAGE SHED & TANK REPAIRS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Vertical Construction (Ch 149) |
COMPLETE |
|
608517 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
608529 |
WEST TISBURY- MARTHA'S VINEYARD CORRELLUS BIKE PATH (PHASE 1) |
Bikeway/Bike Path Construction |
COMPLETE |
|
608539 |
DISTRICT 5- PEDESTRIAN AND BICYCLE FACILITY UPGRADES AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|
608544 |
BOURNE- RESURFACING AND RELATED WORK ON ROUTE 6 & 28 BYPASS ROAD |
Resurfacing |
COMPLETE |
|
608545 |
YARMOUTH- RESURFACING AND RELATED WORK ON ROUTE 6 (MID-CAPE HIGHWAY) |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608570 |
MIDDLEBOROUGH- PLYMPTON- ROCHESTER- SIGNAGE IMPROVEMENTS AT VARIOUS LOCATIONS |
Sign Installation/Upgrading |
COMPLETE |
|
608571 |
BOURNE TO FALMOUTH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 28 |
Structural Signing |
COMPLETE |
|
608588 |
TRURO- BICYCLE ACCOMMODATION IMPROVEMENT ON ROUTE 6 FROM SOUTH HIGHLAND ROAD TO SOUTH HOLLOW ROAD (PHASE 2) |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608592 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-95 CORRIDOR |
Painting - Structural |
COMPLETE |
|
608593 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-195 CORRIDOR |
Painting - Structural |
COMPLETE |
|
608597 |
ATTLEBORO- STORMWATER IMPROVEMENTS ALONG INTERSTATE 95 |
Drainage |
COMPLETE |
|
608598 |
ORLEANS- HARWICH- BREWSTER- STORMWATER IMPROVEMENTS ALONG ROUTE 28 AND ROUTE 6 |
Drainage |
COMPLETE |
|
608599 |
CANTON- NORWOOD- STORMWATER IMPROVEMENTS ALONG ROUTE 1 & I-95 |
Drainage |
COMPLETE |
|
608602 |
FALL RIVER- SOMERSET- STORMWATER IMPROVEMENTS ALONG I-195 AND ROUTE 79 |
Drainage |
COMPLETE |
|
608606 |
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
COMPLETE |
|
608618 |
REHOBOTH- BRIDGE REPLACEMENT, R-04-004, REED STREET OVER PALMER RIVER |
Bridge Replacement |
COMPLETE |
|
608659 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
608660 |
DISTRICT 5- LITTER REMOVAL SERVICES AND VEGETATION MANAGEMENT AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
608683 |
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
608684 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
608687 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA D (BARNSTABLE COUNTY) |
Resurfacing |
COMPLETE |
|
608688 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A, B, & C) |
Resurfacing |
COMPLETE |
|
608689 |
DISTRICT 5- SCHEDULED AND EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Contract Highway Maintenance |
COMPLETE |
|
608690 |
DISTRICT 5- FENCE REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
608691 |
DISTRICT 5- SIDEWALK REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Contract Highway Maintenance |
COMPLETE |
|
608692 |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drainage |
COMPLETE |
|
608694 |
DISTRICT 5- SCHEDULED AND EMERGENCY REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
608696 |
DISTRICT 5- SCHEDULED AND EMERGENCY HIGHWAY LIGHTING REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Lighting |
COMPLETE |
|
608713 |
DISTRICT 5- CLEANING AND PAINTING OF 3 BRIDGES: (S-16-010 (3PD), N-25-030 (3VT, 3VU) ALONG I-95 AND I-195 |
Painting - Structural |
COMPLETE |
|
608734 |
DARTMOUTH- BRIDGE PRESERVATION, D-04-002 (3J4), BRIDGE STREET OVER APPONAGANSETT RIVER |
Bridge Preservation |
COMPLETE |
|
608740 |
WESTPORT- GUARDRAIL INSTALLATION ON I-195 |
Guard Rail & Fencing |
COMPLETE |
|
608747 |
NEW BEDFORD- IMPROVEMENTS AT ASHLEY AND LINCOLN ELEMENTARY SCHOOLS (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
COMPLETE |
|
608751 |
MANSFIELD- I-495/ROUTE 140 AND ROUTE 140/SCHOOL STREET TRAFFIC SIGNAL SYSTEM AND PAVEMENT MARKING UPGRADES |
Traffic Signals |
COMPLETE |
|
608824 |
ATTLEBORO- PAVEMENT PRESERVATION AND RELATED WORK ON I-95 |
Resurfacing Interstate |
COMPLETE |
|
608825 |
MIDDLEBOROUGH- PAVEMENT PRESERVATION AND RELATED WORK ON I-495 |
Resurfacing Interstate |
COMPLETE |
|
608828 |
MIDDLEBOROUGH- PAVEMENT PRESERVATION AND RELATED WORK ON I-495 |
Resurfacing Interstate |
COMPLETE |
|
608833 |
NANTUCKET- IMPROVEMENTS ON MILESTONE ROAD |
Sign Installation/Upgrading |
COMPLETE |
|
608863 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE ROUTE 24 CORRIDOR |
Painting - Structural |
COMPLETE |
|
608893 |
NORTON- TAUNTON- MEDIAN CABLE BARRIER INSTALLATION ON I-495 |
Guard Rail & Fencing |
COMPLETE |
|
608901 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS IN AREAS A, B, & C |
Tree Trimming |
COMPLETE |
|
608902 |
DISTRICT 5- SCHEDULED & EMERGENCY TREE TRIMMING, REMOVAL & SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS IN AREA D (EXCLUDING MARTHA'S VINEYARD) |
Landscaping |
COMPLETE |
|
609041 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
609042 |
DISTRICT 5- SCHEDULED AND EMERGENCY SALT STORAGE SHED AND TANK REPAIRS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Vertical Construction (Ch 149) |
COMPLETE |
|
609045 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A,B, & C) |
Resurfacing |
COMPLETE |
|
609046 |
DISTRICT 5- SCHEDULED AND EMERGENCY PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA D |
Resurfacing |
COMPLETE |
|
609047 |
DISTRICT 5- SCHEDULED AND EMERGENCY CATCH BASIN AND DRAINAGE SYSTEM CLEANING AT VARIOUS LOCATIONS IN AREAS A,B,C, & D (EXCLUDING MARTHA'S VINEYARD AND NANTUCKET ISLAND) |
Catch Basin Cleaning |
COMPLETE |
|
609059 |
DISTRICT 5- SCHEDULED & EMERGENCY PAVEMENT AND CRACK SEALING REPAIRS AT VARIOUS LOCATIONS EXCLUDING MARTHA’S VINEYARD |
Resurfacing |
COMPLETE |
|
609071 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Pavement Marking |
COMPLETE |
|
609126 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
609127 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
609128 |
DISTRICT 5- SCHEDULED & EMERGENCY INSTALLATION OF BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
609132 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-295 CORRIDOR |
Bridge Maintenance |
COMPLETE |
|
609195 |
DISTRICT 5- RAISED PAVEMENT MARKER REMOVAL AT VARIOUS LOCATIONS (EXCLUDING MARTHA'S VINEYARD AND NANTUCKET ISLAND) |
Safety Improvements |
COMPLETE |
|
609200 |
BERKLEY- FREETOWN- LAKEVILLE- SOUTH COAST RAIL EARLY ACTION BRIDGE REPLACEMENTS |
Bridge Replacement |
COMPLETE |
|
609259 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD ISLAND) |
Pavement Marking |
COMPLETE |
|
609260 |
DISTRICT 5- ROADSIDE LITTER REMOVAL AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
609261 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (AREAS A,B, & C) |
Resurfacing |
COMPLETE |
|
609263 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA D (BARNSTABLE COUNTY) |
Resurfacing |
COMPLETE |
|
609264 |
DISTRICT 5- DRAINAGE AND EROSION REPAIRS AT VARIOUS LOCATIONS |
Drainage |
COMPLETE |
|
609265 |
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Resurfacing |
COMPLETE |
|
609266 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS ON MARTHA'S VINEYARD |
Tree Trimming |
COMPLETE |
|
609267 |
DISTRICT 5- FENCE REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
609268 |
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Structural Signing |
COMPLETE |
|
609269 |
DISTRICT 5- SCHEDULED & EMERGENCY DRAINAGE REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drainage |
COMPLETE |
|
609270 |
DISTRICT 5- SCHEDULED AND EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
609271 |
DISTRICT 5- SCHEDULED AND EMERGENCY FACILITY REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Vertical Construction (Ch 149) |
COMPLETE |
|
609272 |
DISTRICT 5- SCHEDULED AND EMERGENCY HIGHWAY LIGHTING REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Lighting |
COMPLETE |
|
609273 |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
609276 |
DISTRICT 5- SCHEDULED AND EMERGENCY REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
609291 |
DENNIS- YARMOUTH- SYSTEMATIC BRIDGE PRESERVATION ON D-07-004=Y-01-003 (47T), (S.R. 28) MAIN STREET OVER BASS RIVER |
Bridge Preservation |
COMPLETE |
|
609299 |
FALL RIVER- WESTPORT- INSTALLATION OF SIGN PANELS AND SUPPORTS AT EIGHT LOCATIONS ON I-195 AND ROUTE 24 |
Structural Signing |
COMPLETE |
|
609308 |
WRENTHAM- PUBLIC WATER LINE EXTENSION AND RESIDENTIAL CONNECTIONS ON BENNETT STREET |
Sewer and Water |
COMPLETE |
|
609310 |
TAUNTON- BUILDING DEMOLITION AT MASSDOT MAINTENANCE FACILITY |
Demolition |
COMPLETE |
|
609371 |
NORWOOD- CONCRETE MEDIAN BARRIER REPLACEMENT ON ROUTE 1 |
Safety Improvements |
COMPLETE |
|
609372 |
DISTRICT 5- SCHEDULED AND EMERGENCY STEEL BEAM REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
609374 |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE ROUTE 24 CORRIDOR |
Bridge Preservation |
COMPLETE |
|
609375 |
FALL RIVER- SYSTEMATIC BRIDGE PRESERVATION, F-02-056 (3T9), MILLIKEN BOULEVARD OVER I-195 |
Bridge Maintenance |
COMPLETE |
|
609376 |
KINGSTON- SYSTEMATIC BRIDGE PRESERVATION, K-01-011 (AGD), ROUTE 3 OVER JONES RIVER |
Bridge Maintenance |
COMPLETE |
|
609492 |
FALMOUTH- BRIDGE PRESERVATION ON F-03-029 (45N, 45P) |
Bridge Maintenance |
COMPLETE |
|
609493 |
SWANSEA- BRIDGE PRESERVATION ON S-35-014 (3WP) |
Bridge Maintenance |
COMPLETE |
|
609500 |
DISTRICT 5- VEGETATION REMOVAL AT VARIOUS LOCATIONS |
Mowing and Spraying |
COMPLETE |
|
609501 |
DISTRICT 5- SIDEWALK REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Roadway - Reconstr - Sidewalks and Curbing |
COMPLETE |
|
609525 |
DISTRICT 5- PEDESTRIAN AND BICYCLE IMPROVEMENTS AT VARIOUS LOCATIONS |
Sidewalk Construction and Repairs |
COMPLETE |
|
610683 |
SANDWICH- SYSTEMATIC BRIDGE PRESERVATION, S-04-001 (4A4), ROUTE 6A OVER SCORTON RIVER |
Bridge Maintenance |
COMPLETE |
|
610684 |
BARNSTABLE- SYSTEMATIC BRIDGE PRESERVATION, B-01-011 (49T) AND B-01-016 (49R), ROUTE 149 (MEETING HOUSE WAY) OVER ROUTE 6 MID-CAPE HIGHWAY |
Bridge Maintenance |
COMPLETE |
|
610685 |
NEW BEDFORD- SYSTEMATIC BRIDGE PRESERVATION, N-06-018 (3NA), ROUTE 140 OVER HATHAWAY ROAD |
Bridge Maintenance |
COMPLETE |
|
610686 |
FALL RIVER- SYSTEMATIC BRIDGE PRESERVATION, F-02-050 (3VD), ROUTE 79 (NB) OVER ROUTE 24 (SB) |
Bridge Maintenance |
COMPLETE |
|
610687 |
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
610688 |
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
610699 |
DISTRICTS 4- DISTRICT 5- DISTRICT 6- CONVERSION OF INTERSTATE AND FREEWAY EXIT SIGNS TO MILEPOST-BASED NUMBERING |
Structural Signing |
COMPLETE |
|
610790 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS (AREA D - EXCLUDING MARTHA'S VINEYARD & NANTUCKET) |
Tree Trimming |
COMPLETE |
|
610801 |
SOMERSET- STORMWATER IMPROVEMENTS ALONG ROUTE I-195 FOR MOUNT HOPE BAY |
Drainage |
COMPLETE |
|
610846 |
DISTRICT 5- SCHEDULED AND EMERGENCY SALT SHED AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Vertical Construction (Ch 149) |
COMPLETE |
|
610847 |
DISTRICT 5- CATCH BASIN AND DRAINAGE SYSTEM CLEANING AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS) |
Catch Basin Cleaning |
COMPLETE |
|
610848 |
DISTRICT 5- SCHEDULED AND EMERGENCY TREE TRIMMING, REMOVAL, AND SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS (AREAS A,B, & C) |
Tree Trimming |
COMPLETE |
|
610850 |
DISTRICT 5- PAVEMENT REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS IN AREA D (BARNSTABLE COUNTY) |
Resurfacing |
COMPLETE |
|
610851 |
DISTRICT 5- HIGHWAY SWEEPING AT VARIOUS LOCATIONS |
Highway Sweeping |
COMPLETE |
|
610852 |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE AND EROSION REPAIRS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drainage |
COMPLETE |
|
610853 |
DISTRICT 5- SCHEDULED AND EMERGENCY DRAINAGE REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Drainage |
COMPLETE |
|
610854 |
DISTRICT 5- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Pavement Marking |
COMPLETE |
|
610855 |
DISTRICT 5- SCHEDULED AND EMERGENCY FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS (INCLUDING MARTHA'S VINEYARD) |
Sign Installation/Upgrading |
COMPLETE |
|
610856 |
DISTRICT 5- SCHEDULED & EMERGENCY GUARDRAIL AND CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS |
Guard Rail & Fencing |
COMPLETE |
|
612021 |
DISTRICT 5- LITTER REMOVAL SERVICES AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
612022 |
DISTRICT 5- MAINTENANCE OF STATE ROADWAYS AT VARIOUS LOCATIONS ON MARTHA'S VINEYARD |
Contract Highway Maintenance |
COMPLETE |
|
612023 |
FOXBOROUGH- STORMWATER RETROFIT ALONG I-95 AND I-495 |
Drainage |
COMPLETE |
|
612114 |
DISTRICT 5- HIGHWAY LIGHTING REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS |
Lighting |
COMPLETE |
|
612118 |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS |
Contract Highway Maintenance |
COMPLETE |
|
612121 |
DISTRICT 5- SCHEDULED AND EMERGENCY INSTALLATION OF BRIDGE SHIELDING AT VARIOUS LOCATIONS |
Bridge Maintenance |
COMPLETE |
|
612122 |
DISTRICT 5- SCHEDULED AND EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS |
Bridge Preservation |
COMPLETE |
|
612202 |
DISTRICT 5- VEGETATION REMOVAL AT VARIOUS LOCATIONS |
Landscaping |
COMPLETE |
|
612204 |
DISTRICT 5- REMOVAL OF RAISED PAVEMENT MARKERS AT VARIOUS LOCATIONS |
Pavement Marking |
COMPLETE |
|