29492 |
BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) |
Hwy Reconstr - Added Capacity |
CONSTRUCTION |
|
43550 |
LEXINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF MARRETT ROAD (ROUTE 2A) |
Hwy Reconstr - No Added Capacity |
CONSTRUCTION |
|
600462 |
ARLINGTON- BRIDGE REPLACEMENT, BR# A-10-011 ROUTE 2 OVER THE MINUTEMAN BIKEWAY |
Bridge Replacement |
CONSTRUCTION |
|
600707 |
WOBURN- BRIDGE REPAIRS AND RELATED WORK, BR# W-43-036, ROUTE I-93 OVER MONTVALE AVENUE |
Bridge Reconstruction/Rehab |
CONSTRUCTION |
|
600839 |
BURLINGTON- TRAFFIC SIGNAL RECONSTRUCTION & RELATED WORK, ROUTE 3A (CAMBRIDGE STREET) AT BEDFORD STREET |
Traffic Signals |
CONSTRUCTION |
|
601936 |
LEXINGTON- MILTON- REVERE- INSTALLATION OF 8 - 10,000 GALLON ABOVE GROUND CaCl2 STORAGE TANKS AT 4 LOCATIONS |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
602079 |
BEDFORD- BURLINGTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON SECTIONS OF MIDDLESEX TURNPIKE AND ROUTE 62 (BURLINGTON ROAD) |
Hwy Reconstr - Major Widening |
CONSTRUCTION |
|
602083 |
DISTRICT 4- RAMP RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (128) FROM LYNNFIELD TO WELLESLEY |
Resurfacing |
CONSTRUCTION |
|
602308 |
LEXINGTON- LINCOLN- REPLACEMENT OF CONCRETE MEDIAN BARRIER ON A SECTION OF ROUTE 2 (CAMBRIDGE TURNPIKE) |
Safety Improvements |
CONSTRUCTION |
|
602353 |
LEXINGTON- RECONSTRUCTION OF EMERY PARK IN DEPOT SQUARE |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
602915 |
DISTRICT 4- RESURFACING AND RELATED WORK IN AREA "B" |
Resurfacing |
CONSTRUCTION |
|
603008 |
WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA |
Bridge Replacement |
CONSTRUCTION |
|
604215 |
MEDFORD- READING- SOMERVILLE- STONEHAM- WOBURN- TRAFFIC MANAGEMENT SERVICES FOR THE DEMOCRATIC CONVENTION RESPONSE, I-93 SB |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
604216 |
MEDFORD- SOMERVILLE- STONEHAM- WOBURN- TEMPORARY EXTENSION OF HIGH OCCUPANCY VEHICLE LANE FOR THE DEMOCRATIC NATIONAL CONVENTION, I-93 SB |
Miscellaneous/No Prequal |
CONSTRUCTION |
|
604935 |
WOBURN- RECONSTRUCTION OF MONTVALE AVENUE, FROM I-93 INTERCHANGE TO CENTRAL STREET (APPROX. 1,850 FT) |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
606381 |
CAMBRIDGE- ARLINGTON- BELMONT- LEXINGTON- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2 |
Lighting |
CONSTRUCTION |
|
608379 |
LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2 |
Resurfacing DOT Owned Non-Interstate |
CONSTRUCTION |
|
608763 |
BOSTON- SOMERVILLE- MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) |
Lighting |
CONSTRUCTION |
|
609222 |
ARLINGTON- SPY POND SEDIMENT REMOVAL |
Dredging |
CONSTRUCTION |
|
107700 |
BURLINGTON- BILLERICA- BURLINGTON- CHELMSFORD- LOWELL- TYNGSBOROUGH- ROUTE 3 ADD-A-LANE (DESIGN-BUILD) |
New Construction |
DESIGN |
|
603722 |
LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 |
Bridge Replacement |
DESIGN |
|
604996 |
WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA |
New Bridge |
DESIGN |
2021 |
605013 |
WOBURN- NOISE BARRIER CONSTRUCTION ON I-93 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
605178 |
BILLERICA- REHABILITATION ON BOSTON ROAD (ROUTE 3A) FROM BILLERICA TOWN CENTER TO FLOYD STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
2022 |
605605 |
WOBURN- READING- STONEHAM-WAKEFIELD- INTERCHANGE IMPROVEMENTS TO I-93/I-95 |
Hwy Reconstr - Added Capacity |
DESIGN |
|
605850 |
ARLINGTON- RECONSTRUCTION AND EXPANSION OF DISTRICT FOUR ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
DESIGN |
|
608067 |
WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET |
Hwy Reconstr - Minor Widening |
DESIGN |
2025 |
608227 |
BILLERICA- YANKEE DOODLE BIKE PATH CONSTRUCTION (PHASE I) |
Bikeway/Bike Path Construction |
DESIGN |
2024 |
608495 |
CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2022 |
608574 |
BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3 |
Structural Signing |
DESIGN |
2021 |
609250 |
BILLERICA- INTERSECTION IMPROVEMENTS AT BOSTON ROAD (ROUTE 3A), LEXINGTON STREET AND GLAD VALLEY ROAD |
Hwy Reconstr - Minor Widening |
DESIGN |
|
609516 |
BURLINGTON- IMPROVEMENTS AT I-95 (ROUTE 128)/ROUTE 3 INTERCHANGE |
Hwy Reconstr - Added Capacity |
DESIGN |
|
609531 |
ARLINGTON- STRATTON SCHOOL IMPROVEMENTS (SRTS) |
New Sidewalks and Curbing |
DESIGN |
2024 |
610662 |
WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET AND MONTVALE AVENUE |
Hwy Reconstr - No Added Capacity |
DESIGN |
2025 |
610704 |
BURLINGTON- BILLERICA- RESURFACING AND RELATED WORK ON ROUTE 3A |
Resurfacing |
DESIGN |
|
610719 |
BURLINGTON TO TYNGSBOROUGH- PAVEMENT PRESERVATION ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2025 |
611937 |
LEXINGTON- CONSTRUCTION OF A PRE-ENGINEERED EQUIPMENT REPAIR GARAGE AT THE LEXINGTON DEPOT |
Vertical Construction (Ch 149) |
DESIGN |
|
2001 |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-013, ANDOVER ROAD OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
9549 |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-014 GEORGE BROWN STREET OVER THE B & M RAILROAD AND MBTA |
Bridge Replacement |
COMPLETE |
|
29491 |
BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE/MITRE EXTENSION FROM ROUTE 62 TO NORTH OF PLANK STREET (PHASE II) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
600703 |
LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGN-BUILD) |
Bridge Replacement |
COMPLETE |
|
601425 |
BILLERICA- RECONSTRUCTION OF COOK STREET & ALEXANDER ROAD (11,200 FEET TOTAL) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601426 |
BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601444 |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-002 RIVER STREET OVER CONCORD RIVER |
Bridge Replacement |
COMPLETE |
|
601488 |
BILLERICA- RECONSTRUCTION, CONCORD ROAD PHASE II, FROM ROUTE 3A TO MIDDLESEX TURNPIKE AND CHARNSTAFF LN FROM CONCORD RD TO RT 3A |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602041 |
BURLINGTON- LEXINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (ROUTE 128) |
Resurfacing |
COMPLETE |
|
602123 |
BILLERICA- SIGNAL UPGRADES ON ROUTE 3A @ 3 LOCATIONS: TREBLE COVE; BRIDGE STREET; WYMAN ROAD/WEBB BROOK ROAD |
Traffic Signals |
COMPLETE |
|
602133 |
LEXINGTON- SIGNAL UPGRADE AT ROUTE 2A AND WALTHAM STREET |
Traffic Signals |
COMPLETE |
|
602286 |
ARLINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2A (SUMMER STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
603424 |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-001, ROUTE 4 (NASHUA ROAD) OVER CONCORD RIVER |
Bridge Replacement |
COMPLETE |
|
604628 |
LEXINGTON- RESURFACING & RELATED WORK ON ROUTE 2 |
Resurfacing |
COMPLETE |
|
604650 |
WOBURN- INTERSTATE RESURFACING ON I-95 |
Resurfacing |
COMPLETE |
|
604652 |
STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY INCLUDING NEW BRIDGE, W-43-029, OVER THE ABERJONA RIVER |
Bikeway/Bike Path Construction |
COMPLETE |
|
604687 |
ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L. |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
604755 |
LEXINGTON- BRIDGE PRESERVATION, L-10-017, SPRING STREET OVER ROUTE 2 |
Structures Maintenance |
COMPLETE |
|
604878 |
READING- STONEHAM- WINCHESTER- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 |
Resurfacing |
COMPLETE |
|
604879 |
WILMINGTON- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-93 |
Resurfacing |
COMPLETE |
|
604896 |
ARLINGTON- BELMONT- CAMBRIDGE- LEXINGTON- LINCOLN- SIGN REPLACEMENT & IMPROVEMENTS ON STATE ROUTE 2 |
Sign Installation/Upgrading |
COMPLETE |
|
604937 |
LEXINGTON- NEWTON- WALTHAM- WELLESLEY- WESTON- TRAFFIC SIGN REPLACEMENT ON I-95, FROM WELLESLEY (ROUTE 9) TO LEXINGTON (ROUTES 4/225) APPROX. 13 MILES |
Structural Signing |
COMPLETE |
|
605018 |
BURLINGTON- LEXINGTON- READING- WOBURN- TRAFFIC SIGN & GUIDE REPLACEMENT ON I-95 (SR 128) |
Sign Installation/Upgrading |
COMPLETE |
|
605259 |
ARLINGTON- BELMONT- CAMBRIDGE- RESURFACING & RELATED WORK ON ROUTE 2 |
Resurfacing |
COMPLETE |
|
605520 |
ARLINGTON- SOMERVILLE- BRIDGE REHABILITATION, A-10-014=S-17-026 (4DI), MYSTIC VALLEY PARKWAY OVER ALEWIFE BROOK |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605589 |
BURLINGTON- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
605637 |
ARLINGTON- CAMBRIDGE- IMPROVEMENTS AT ROUTE 2 & ROUTE 16 |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
605672 |
ARLINGTON- CAMBRIDGE- SOMERVILLE- ALEWIFE GREENWAY CORRIDOR RESTORATION (AKA MINUTEMAN BIKE PATH CONNECTOR) |
Bikeway/Bike Path Construction |
COMPLETE |
|
605748 |
ARLINGTON- RECONSTRUCTION ON FOREST STREET, FROM WINCHESTER T.L. TO SUMMER STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
605794 |
ARLINGTON- SAFE ROUTES TO SCHOOL (DALLIN SCHOOL) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
605870 |
LEXINGTON- SAFE ROUTES TO SCHOOL (BOWMAN SCHOOL) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
606031 |
LEXINGTON- CABLE BARRIER INSTALLATION ALONG ROUTE 2 |
Guard Rail & Fencing |
COMPLETE |
|
606152 |
DISTRICT 4- CORRECTIVE ACTIONS/WORK FOR NON-CONFORMING ISSUES ON ROUTE 3 (NORTH) BURLINGTON TO TYNGSBOROUGH |
Miscellaneous/No Prequal |
COMPLETE |
|
606170 |
LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 |
Resurfacing |
COMPLETE |
|
606353 |
BEDFORD- BILLERICA- CHELMSFORD- CABLE BARRIER INSTALLATION ON ROUTE 3 |
Guard Rail & Fencing |
COMPLETE |
|
606432 |
LEXINGTON- BURLINGTON- WOBURN- STONEHAM- READING- WAKEFIELD- LYNNFIELD- EXPANSION OF FIBER & CCTV ON I-95 |
Intelligent Transportation Sys |
COMPLETE |
|
606885 |
ARLINGTON- BIKEWAY CONNECTION AT INTERSECTION ROUTE 3 & ROUTE 60, MASSACHUSETTS AVENUE, PLEASANT STREET & MYSTIC STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607409 |
LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607472 |
BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3 |
Resurfacing |
COMPLETE |
|
607638 |
BURLINGTON- REMEDIATION & RELATED WORK AT ROUTE 3 & ROUTE 128 OFF WHEELER ROAD |
Hazardous Waste Remediation |
COMPLETE |
|
607821 |
BILLERICA- CONSTRUCTION OF MASSDOT MAINTENANCE FACILITY AT CONCORD RD AND ROUTE 3 (EXIT 27) |
Vertical Construction (Ch 149) |
COMPLETE |
|
607992 |
ANDOVER- BEDFORD- BILLERICA- STORMWATER IMPROVEMENTS ALONG I-93, ROUTE 3 AND ROUTE 3A |
Drainage |
COMPLETE |
|
608068 |
BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD |
Traffic Signals |
COMPLETE |
|
608181 |
BILLERICA- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 3A (BOSTON ROAD) AND ALLEN ROAD |
Traffic Signals |
COMPLETE |
|
608219 |
READING- WAKEFIELD- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 |
Resurfacing Interstate |
COMPLETE |
|