General overview
The Weighted Bid Prices module of the Construction Project Estimator is intended to provide access to timely average mean and median bid price data. Project bid data will be updated weekly to reflect the most recent bids received by MassDOT- Highway Division.

The database uses all bid data received in responsive bids, not just the low bid. The bid prices are displayed in groups of increasing quantities. The limits of these groups will be revised as additional bid data is obtained, and is intended to provide an indication of bid price variations as quantities increase. The bid data is analyzed to remove very high and very low bids.

The website is designed to provide a range of information about historical bid values for any particular item. It is not intended to provide absolute values for each item.

FAQ

Here are some frequently asked questions about this application.

Q: What does the 'Weighted Bid Prices' module of this application do?
A:
The 'Weighted Bid Prices' module is intended to provide access to timely average mean and median bid price data. Project bid data will be updated weekly to reflect the most recent bids received by MassDOT-Highway Division.

Q: What bids are used to calculate the weighted bid prices?
A: 
The database uses all bid data received in responsive bids, not just the low bid. The bid prices are displayed in groups of increasing quantities. The limits of these groups will be revised as additional bid data is obtained, and is intended to provide an indication of bid price variations as quantities increase. The bid data is analyzed to remove very high and very low bids. The application is designed to provide a range of information about historical bid values for any particular item. It is not intended to provide absolute values for each item.

Q: How is bid data processed by the "Weighted Bid Prices" module?
A:
Once the system has identified all bids meeting the selected criteria, the following analytical processes will occur:

  1. Project bids are ordered by project quantity
  2. The lowest quantity is subtracted from the highest quantity
    1. The result is divided by the items’ quantity group factor creating the appropriate number of equalized quantity groups.
  3. All bids are distributed to their appropriate quantity group
  4. The median price is determined for each quantity group
  5. The items’ variance percent is applied to the median price for each quantity group in order to create a high median and a low median for each group
  6. All bids falling outside the high median and low median ranges for each quantity group are discarded
    1. A new median price is determined for each quantity group.
    2. The mean price for each quantity group is calculated.

Q: What are very high and very low bids?
A:
These are bid prices determined to be excessively high or low when compared to the median bid price of all bids for a given item. This determination is based on calculating the items’ high/low median price as follows:

  1. high = median price + (median price * variance percentage)
  2. low = median price – (median price * variance percentage)

Since individual bids falling outside this high/low range, may skew the averages, they are ignored.

 

Have a question not answered here or on the Help page? More help is only an email away.

Glossary
Here are some terms you may find throughout this application.

Standard Units of Measure

Unit Description Measurement System
$ US DOLLARS English and Metric
ALS ANNUAL LUMP SUM English and Metric
BAG PER BAG English and Metric
CAR PER CAR English and Metric
CNG PER CLEANING English and Metric
CUT PER CUT English and Metric
DAY PER DAY English and Metric
DD PER DRUM DAY English and Metric
DRM PER DRUM English and Metric
EA EACH English and Metric
FLR PER FLOOR English and Metric
HR PER HOUR English and Metric
HRS PER HOUR English and Metric
LS LUMP SUM English and Metric
MD PER MAN DAY English and Metric
MH PER MAN HOUR English and Metric
MO PER MONTH English and Metric
SD PER SPACE DAY English and Metric
SPT PER SPOT English and Metric
U PER UNIT English and Metric
UD PER UNIT DAY English and Metric
WK PER WEEK English and Metric
MMG PER MILLION GAL English
VF PER VERT. FT. English
UC **CA/T USE ONLY English
SY PER SQUARE YARD English
TON PER TON English
TPM **CA/T USE ONLY English
SF PER SQUARE FOOT English
SFD **CA/T USE ONLY English
SH **CA/T USE ONLY English
SI PER SQUARE IN English
MSF **CA/T USE ONLY English
OZ PER OUNCE English
QT PER QUART English
RIS **CA/T USE ONLY English
MBM PER MFBM English
MGL PER 1000 GALS English
Unit Description Measurement System
KWH PER KILOWATT HR English
GAL PER GALLON English
CY PER CUBIC YARD English
CSF PER 100 SQ. FT. English
LB PER POUND English
LBS PER POUND English
LD **CA/T USE ONLY English
LF PER LINEAR FOOT English
LFD **CA/T USE ONLY English
LI PER LINEAR INCH English
LM PER LINEAR MILE English
LOD **CA/T USE ONLY English
CCF PER 100 CU.FT. English
CF PER CUBIC FOOT English
CGL PER 100 GALS English
CH **CA/T USE ONLY English
CLF PER 100 LIN FT. English
BBL PER BARREL English
BF PER BOARD FOOT English
A PER ACRE English
AAA **CA/T USE ONLY English
AL **CA/T USE ONLY English
CM PER CUBIC METER Metric
CMM PER CUBIC ARE Metric
HA PER HECTARE Metric
L PER LITER Metric
Metric PER METER Metric
KG PER KILOGRAM Metric
KL PER KILOLITER Metric
KM PER KILOMETER Metric
MG PER MEGAGRAM Metric
MRD PER METER DAY Metric
MM PER MILLIMETER Metric
MT PER METRIC TON Metric
SM PER SQ. METER Metric
SMM PER SQ. MM Metric
VM PER VERT. METER Metric

Table 1: Table of standard MassDOT-Highway units of measure.